[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,3,50,2846,[13,34,46,58,70,82,94,105,117,129,141,149,158,170,182,194,206,218,230,242,254,266,278,290,302,314,326,338,350,362,374,386,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1124571,1,"单选题","地铁基坑内支撑围护结构的挡土应力传递路径是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","围檩→支撑→围护墙",false,{"key":24,"text":25,"correct":22},"B","围护墙→支撑→围檩",{"key":27,"text":28,"correct":29},"C","围护墙→围檩→支撑",true,{"key":31,"text":32,"correct":22},"D","支撑→围护墙→围檩","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1124572,"当基础底部以下存在连续分布、埋深较浅的隔水层时，应采用（ ）隔水帷幕。",[38,40,42,44],{"key":20,"text":39,"correct":22},"悬挂式",{"key":24,"text":41,"correct":22},"压力注浆",{"key":27,"text":43,"correct":29},"落底式",{"key":31,"text":45,"correct":22},"嵌入式",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1124573,"保证基坑边坡稳定，下列措施中错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"应做好基坑的降排水和防洪工作",{"key":24,"text":53,"correct":22},"可采用坡面土钉、挂金属网喷混凝土或抹水泥砂浆护面",{"key":27,"text":55,"correct":29},"边坡全部挖完以后要进行刷坡",{"key":31,"text":57,"correct":22},"严格禁止在基坑边坡坡顶堆放材料",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1124574,"下列不属于基坑开挖确定开挖方案依据的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"支护结构设计",{"key":24,"text":65,"correct":22},"降水要求",{"key":27,"text":67,"correct":22},"排水要求",{"key":31,"text":69,"correct":29},"工地现有的排水设施",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1124575,"某基坑采用钻孔灌注桩作为基坑围护结构，施工场地范围存在两条既有管线，硬塑黏土，土中存在孤石，根据现场情况，（ ）不宜作为隔水帷幕施工方法。",[74,76,78,80],{"key":20,"text":75,"correct":22},"注浆法",{"key":24,"text":77,"correct":22},"冻结法",{"key":27,"text":79,"correct":29},"水泥搅拌法",{"key":31,"text":81,"correct":22},"地下连续墙法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1124577,"当沉井湿封底时，刃脚的高度取（ ）左右。",[86,88,90,92],{"key":20,"text":87,"correct":22},"0.6m",{"key":24,"text":89,"correct":22},"l.Om",{"key":27,"text":91,"correct":22},"1.2m",{"key":31,"text":93,"correct":29},"1.5m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1124578,"前后两排小导管的水平支撑搭接长度不应小于（ ）。",[98,99,101,103],{"key":20,"text":93,"correct":22},{"key":24,"text":100,"correct":29},"1m",{"key":27,"text":102,"correct":22},"0.5m",{"key":31,"text":104,"correct":22},"2m",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1124579,"关于暗挖隧道内加固支护技术，钢筋网材料宜采用Q235钢，网格尺寸宜采用（ ）mm。",[109,111,113,115],{"key":20,"text":110,"correct":22},"100～200",{"key":24,"text":112,"correct":22},"80～250",{"key":27,"text":114,"correct":22},"200～350",{"key":31,"text":116,"correct":29},"150～300",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1124580,"关于高压喷射注浆法，三管法高压水的压力应大于（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"10MPa",{"key":24,"text":124,"correct":22},"15MPa",{"key":27,"text":126,"correct":29},"20MPa",{"key":31,"text":128,"correct":22},"30MPa",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},1124581,"CD工法适用于地层条件差、修建跨度不大于（ ）m的隧道。",[133,135,137,139],{"key":20,"text":134,"correct":22},"14",{"key":24,"text":136,"correct":22},"16",{"key":27,"text":138,"correct":29},"18",{"key":31,"text":140,"correct":22},"20",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},1124582,"单侧壁导坑法适用于地质条件差的地层、修建跨度不大于（ ）m的隧道。",[145,146,147,148],{"key":20,"text":134,"correct":29},{"key":24,"text":136,"correct":22},{"key":27,"text":138,"correct":22},{"key":31,"text":140,"correct":22},{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":27,"analysis":33},1124583,"钢拱架宜选用钢筋、型钢、钢轨等制成，采用钢筋加工而成格栅的主筋直径不宜小于（ ）mm。",[153,154,155,156],{"key":20,"text":134,"correct":22},{"key":24,"text":136,"correct":22},{"key":27,"text":138,"correct":29},{"key":31,"text":157,"correct":22},"22",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":27,"analysis":33},1124584,"超前锚杆、小导管支护长度宜为（ ）m，并应大于循环进尺的2倍。",[162,164,166,168],{"key":20,"text":163,"correct":22},"2.0～2.5",{"key":24,"text":165,"correct":22},"2.5～3.0",{"key":27,"text":167,"correct":29},"3.0～3.5",{"key":31,"text":169,"correct":22},"3.5～4.0",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":27,"analysis":33},1124585,"喷锚加固时，喷射混凝土施工前，应做混凝土凝结时间试验，初凝和终凝时间不应大于（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"3min和5min",{"key":24,"text":177,"correct":22},"3min和10min",{"key":27,"text":179,"correct":29},"5min和10min",{"key":31,"text":181,"correct":22},"5min和15min",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":20,"analysis":33},1124586,"喷射混凝土应采用早强混凝土，要求初凝时间不得大于（ ）min，终凝时间不得大于（ ）min。",[186,188,190,192],{"key":20,"text":187,"correct":29},"5；10",{"key":24,"text":189,"correct":22},"5；8",{"key":27,"text":191,"correct":22},"3；10",{"key":31,"text":193,"correct":22},"3；8",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1124587,"锁口圈梁混凝土强度应达到设计强度的（ ）及以上时，方可向下开挖竖井。",[198,200,202,204],{"key":20,"text":199,"correct":22},"50%",{"key":24,"text":201,"correct":29},"70%",{"key":27,"text":203,"correct":22},"75%",{"key":31,"text":205,"correct":22},"80%",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":31,"analysis":33},1124588,"全断面法对地质条件要求严格，围岩必须有足够的（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"不透水性",{"key":24,"text":213,"correct":22},"抵抗变形能力",{"key":27,"text":215,"correct":22},"强度",{"key":31,"text":217,"correct":29},"自稳能力",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},1124589,"CD工法基础上增设（ ），就形成了CRD工法。",[222,224,226,228],{"key":20,"text":223,"correct":22},"超前小导管",{"key":24,"text":225,"correct":29},"临时仰拱",{"key":27,"text":227,"correct":22},"钢拱架",{"key":31,"text":229,"correct":22},"管棚",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},1124590,"冻结法的主要缺点是（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":29},"成本高",{"key":24,"text":237,"correct":22},"污染大",{"key":27,"text":239,"correct":22},"地下水封闭效果不好",{"key":31,"text":241,"correct":22},"地层整体固结性差",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1124591,"喷锚暗挖法施工隧道的复合式衬砌结构中的主要承载单元是（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":29},"初期支护",{"key":24,"text":249,"correct":22},"防水隔离层",{"key":27,"text":251,"correct":22},"二次衬砌",{"key":31,"text":253,"correct":22},"围岩",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":31,"analysis":33},1124592,"下列关于冻结法优缺点的说法中，错误的是（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"冻结加固的地层强度高",{"key":24,"text":261,"correct":22},"地下水封闭效果好",{"key":27,"text":263,"correct":22},"对工程环境污染小",{"key":31,"text":265,"correct":29},"成本较低",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},1124593,"关于软土基坑内被动区的加固形式，地铁车站的端头井一般采用（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"墩式加固",{"key":24,"text":273,"correct":22},"裙边加固",{"key":27,"text":275,"correct":22},"抽条加固",{"key":31,"text":277,"correct":29},"格栅加固",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},1124594,"关于复合式衬砌防水层施工的错误说法是（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"复合式衬砌防水层施工应优先选用射钉铺设",{"key":24,"text":285,"correct":22},"防水层施工时喷射混凝土表面应平顺，不得留有锚杆头或钢筋断头",{"key":27,"text":287,"correct":22},"喷射混凝土表面漏水应及时引排，防水层接头应擦净",{"key":31,"text":289,"correct":29},"铺设防水层地段距开挖面不应大于爆破安全距离",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},1124595,"基坑内被动区加固形式中，当基坑作为地铁车站的端头井时，宜采用（ ）加固。",[294,296,298,300],{"key":20,"text":295,"correct":29},"格栅",{"key":24,"text":297,"correct":22},"裙边",{"key":27,"text":299,"correct":22},"抽条",{"key":31,"text":301,"correct":22},"满堂",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":31,"analysis":33},1124596,"关于暗挖隧道小导管注浆加固技术的说法，错误的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"根据工程条件试验确定浆液及其配合比",{"key":24,"text":309,"correct":22},"应严格控制小导管的长度、开孔率、安设角度和方向",{"key":27,"text":311,"correct":22},"小导管的尾部必须设置封堵孔，防止漏浆",{"key":31,"text":313,"correct":29},"注浆时间应由实验确定，注浆压力可不控制",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},1124597,"开挖跨度12m、高8m的浅埋喷锚暗挖隧道工程，不属于监控量测应测项目的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"拱顶沉降",{"key":24,"text":321,"correct":22},"净空收敛",{"key":27,"text":323,"correct":29},"围岩压力",{"key":31,"text":325,"correct":22},"地下水位",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},1124598,"喷锚暗挖法的主要开挖方法中沉降较小的是（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"环形开挖预留核心土法",{"key":24,"text":333,"correct":29},"CRD法",{"key":27,"text":335,"correct":22},"CD法",{"key":31,"text":337,"correct":22},"双侧壁导坑法",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},1124599,"下列关于暗挖隧道内加固支护技术的叙述中，错误的是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"喷射混凝土应采用早强混凝土",{"key":24,"text":345,"correct":29},"喷射混凝时，喷射机喷头处的风压不得小于0.2MPa",{"key":27,"text":347,"correct":22},"喷射混凝土应紧跟开挖工作面，应分段.分片.分层，由下而上顺序进行",{"key":31,"text":349,"correct":22},"严禁使用回填料",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},1124600,"下列方法中适用于地质条件较差，跨度不大于14m的区间隧道，且经济合理的方法是（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"全断面",{"key":24,"text":357,"correct":22},"交叉中隔壁",{"key":27,"text":359,"correct":22},"中洞法",{"key":31,"text":361,"correct":29},"单侧壁导坑",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},1124601,"下列关于全断面开挖法的说法中，错误的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"全断面开挖法适用于土质稳定的隧道施工",{"key":24,"text":369,"correct":29},"全断面开挖法适用于断面较大的隧道施工",{"key":27,"text":371,"correct":22},"全断面开挖法适宜人工开挖作业",{"key":31,"text":373,"correct":22},"全断面开挖法适宜小型机械作业",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},1124602,"超前小导管注浆施工应根据土质条件选择注浆法，以下关于选择注浆法说法正确的（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"在砂卵石地层中宜采用高压喷射注浆法",{"key":24,"text":381,"correct":29},"在黏土层中宜采用劈裂或电动硅化注浆法",{"key":27,"text":383,"correct":22},"在砂层中宜采用渗入注浆法",{"key":31,"text":385,"correct":22},"在淤泥质软土层中宜采用劈裂注浆法",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},1124604,"下图是喷锚暗挖法中的（ ）法。",[390,391,392,393],{"key":20,"text":337,"correct":22},{"key":24,"text":335,"correct":22},{"key":27,"text":333,"correct":22},{"key":31,"text":359,"correct":29},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1124605,"吊装装配式预应力混凝土构件时候，吊绳与预制构件的交角最小要大于（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"15°",{"key":24,"text":401,"correct":29},"45°",{"key":27,"text":403,"correct":22},"60°",{"key":31,"text":405,"correct":22},"30°",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1124606,"给水与污水处理厂试运转联机运行要求，全厂联机运行应不少于（ ）h。",[410,412,414,416],{"key":20,"text":411,"correct":22},"48",{"key":24,"text":413,"correct":22},"12",{"key":27,"text":415,"correct":29},"24",{"key":31,"text":417,"correct":22},"6",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1124607,"整体现浇水池顶板跨度为8m，底模板拆模时间所需砼强度应达到设计强度的（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"50％",{"key":24,"text":425,"correct":22},"70％",{"key":27,"text":427,"correct":29},"75％",{"key":31,"text":429,"correct":22},"100％",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1124608,"污水经过二级处理后，BOD5去除率可达（ ）%以上，二沉池出水能达标排放。",[434,436,438,440],{"key":20,"text":435,"correct":22},"70",{"key":24,"text":437,"correct":22},"80",{"key":27,"text":439,"correct":29},"90",{"key":31,"text":441,"correct":22},"100",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},1124609,"沉井准备工作表述错误的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"采用沉井筑岛制作时，岛面高程应比施工期最高水位高出0.5m以上",{"key":24,"text":449,"correct":22},"刃脚垫层采用砂垫层上铺垫木或素砼",{"key":27,"text":451,"correct":22},"砂垫层分布在刃脚中心线的两侧范围，应考虑方便抽除垫木",{"key":31,"text":453,"correct":29},"沉井刃脚采用砖模时，其底面和斜面部分可采用砂浆.砖砌筑；每隔一定距离砌成企口缝",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},1124610,"关于污水处理厂试运行的规定，错误的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"参加试运行人员须经培训考试合格",{"key":24,"text":461,"correct":22},"单机试车后再进行设备机组试运行",{"key":27,"text":463,"correct":29},"全厂联机运行时间为12h",{"key":31,"text":465,"correct":22},"试运行之前，所有单项工程验收合格",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1124611,"下列选项中，关于整体式现浇钢筋混凝土池体结构施工流程的说法正确是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"测量定位→土方开挖及地基处理→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→功能性试验→顶板浇筑",{"key":24,"text":473,"correct":29},"测量定位→土方开挖及地基处理→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→顶板浇筑→功能性试验",{"key":27,"text":475,"correct":22},"土方开挖及地基处理→测量定位→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→功能性试验→顶板浇",{"key":31,"text":477,"correct":22},"土方开挖及地基处理→测量定位→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→顶板浇→功能性试验",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1124612,"单元组合式现浇钢筋混凝土水池工艺流程中，没有（ ）工序。",[482,484,486,488],{"key":20,"text":483,"correct":22},"池壁分块浇筑",{"key":24,"text":485,"correct":22},"底板分块浇筑",{"key":27,"text":487,"correct":22},"底板嵌缝",{"key":31,"text":489,"correct":29},"顶板浇筑",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},1124613,"水池满水试验必须在规定的条件下进行，以下满水试验前必须具备的条件汇总错误的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"池体的混凝土或砖.石砌体的砂浆已达到设计强度要求",{"key":24,"text":497,"correct":22},"现浇钢筋混凝土池体的防水层.防腐层施工之前",{"key":27,"text":499,"correct":22},"装配式预应力混凝土池体施加预应力且锚固端封锚以后，保护层喷涂之前",{"key":31,"text":501,"correct":29},"砖砌池体防水层施工以后，石砌池体勾缝以前",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1124614,"下列关于沉井干封底描述错误的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":29},"封底前应整理好坑底和清除淤泥，对超挖部分应回填黏土",{"key":24,"text":509,"correct":22},"采用全断面封底时，混凝土垫层应一次性连续浇筑",{"key":27,"text":511,"correct":22},"钢筋混凝土底板施工前，沉井内应无渗漏水",{"key":31,"text":513,"correct":22},"封底前应设置泄水井",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1124615,"氧化塘多采用（ ）结构。",[518,520,522,524],{"key":20,"text":519,"correct":22},"钢筋混凝土",{"key":24,"text":521,"correct":22},"砖砌",{"key":27,"text":523,"correct":29},"土膜",{"key":31,"text":525,"correct":22},"钢",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1124616,"止水带安装应牢固，位置准确，其中心线应与（ ）对正，带面不得有裂纹、孔洞等。不得在止水带上穿孔或用铁钉固定就位。",[530,532,534,536],{"key":20,"text":531,"correct":22},"钢筋空隙中线",{"key":24,"text":533,"correct":22},"先浇混凝土边线",{"key":27,"text":535,"correct":22},"后浇混凝土边线",{"key":31,"text":537,"correct":29},"变形缝中心线",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1124617,"沉井下沉出现倾斜偏差时，可采用（ ）措施进行纠偏。",[542,544,546,548],{"key":20,"text":543,"correct":22},"高压射水",{"key":24,"text":545,"correct":29},"调整开挖顺序和方式",{"key":27,"text":547,"correct":22},"抽水减浮",{"key":31,"text":549,"correct":22},"炮振",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1124618,"关于厂站水处理构筑物的特点，说法有误的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"构件多采用薄板或薄壳型结构，断面薄，配筋率高",{"key":24,"text":557,"correct":22},"较高抗渗性",{"key":27,"text":559,"correct":22},"良好整体性",{"key":31,"text":561,"correct":29},"高耐腐蚀性",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},1124619,"下列构筑物中，属于污水处理构筑物的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"混凝沉淀池",{"key":24,"text":569,"correct":22},"清水池",{"key":27,"text":571,"correct":22},"吸滤池",{"key":31,"text":573,"correct":29},"曝气池",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},1124620,"下列不属于生物处理法的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"活性污泥法",{"key":24,"text":581,"correct":22},"生物膜法",{"key":27,"text":583,"correct":22},"土地处理法",{"key":31,"text":585,"correct":29},"筛滤截留",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1124621,"现浇壁板缝混凝土施工时，混凝土如有离析现象，应（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"加水泥浆重新拌合",{"key":24,"text":593,"correct":29},"进行二次拌合",{"key":27,"text":595,"correct":22},"加水泥重新拌合",{"key":31,"text":597,"correct":22},"取出粗颗粒后使用",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":20,"analysis":33},1124622,"给水工艺中使用混凝沉淀，主要去除水中的（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":29},"胶体和悬浮杂质",{"key":24,"text":605,"correct":22},"胶体和溶解性物质",{"key":27,"text":607,"correct":22},"悬浮杂质和溶解性物质",{"key":31,"text":609,"correct":22},"有机物",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]