[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,29,50,2846,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,356,368,380,392,404,416,428,440,452,464,476,485,495,503,511,523,535,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1125924,1,"单选题","钻孔灌注桩灌注水下混凝土时，导管底端至孔底的距离应为( )m。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","0.6～0.7",false,{"key":24,"text":25,"correct":22},"B","0.5～0.6",{"key":27,"text":28,"correct":29},"C","0.3～0.5",true,{"key":31,"text":32,"correct":22},"D","0.2～0.3","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1125925,"为避免孔口高程误差，应认真校核原始水准点和各孔口绝对高程，每根桩钻孔前( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"实行签证手续",{"key":24,"text":41,"correct":22},"测量钻机平台高程",{"key":27,"text":43,"correct":29},"复测桩位孔口高程",{"key":31,"text":45,"correct":22},"测量护筒上口高程",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1125926,"为了防止钢筋笼上升，当灌注的混凝土面距钢筋骨架底部1m左右时，应( )。",[50,52,54,56],{"key":20,"text":51,"correct":29},"降低混凝土灌注速度",{"key":24,"text":53,"correct":22},"改善混凝土流动性能",{"key":27,"text":55,"correct":22},"加快混凝土灌注速度",{"key":31,"text":57,"correct":22},"在首批混凝土中掺入缓凝剂",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1125927,"关于后张法预应力施工孔道压浆的说法中，错误的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"当白天气温高于35℃时，压浆宜在夜间进行",{"key":24,"text":65,"correct":29},"压浆完成24h以后，结构混凝土的温度可以低于5'C",{"key":27,"text":67,"correct":22},"压浆作业每一工班应留取不少于3组砂浆试块，标养28d",{"key":31,"text":69,"correct":22},"水泥浆的强度应符合设计要求，设计无要求时不得低于30MPa",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1125928,"后张法预应力筋张拉后孔道压浆采用的水泥浆强度在设计无要求时，不低于( )MPa。",[74,76,78,80],{"key":20,"text":75,"correct":22},"15",{"key":24,"text":77,"correct":22},"20",{"key":27,"text":79,"correct":29},"30",{"key":31,"text":81,"correct":22},"35",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1125929,"大体积混凝土出现的裂缝按深度不同分为表面裂缝、深层裂缝和（）三种。",[86,88,90,92],{"key":20,"text":87,"correct":22},"收缩裂缝",{"key":24,"text":89,"correct":29},"贯穿裂缝",{"key":27,"text":91,"correct":22},"应力裂缝",{"key":31,"text":93,"correct":22},"结构裂缝",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1125930,"钻孔灌注桩初灌水下混凝土时，导管首次埋入混凝土的深度不应小于( )m。",[98,100,102,104],{"key":20,"text":99,"correct":22},"0.7",{"key":24,"text":101,"correct":22},"0.8",{"key":27,"text":103,"correct":22},"0.9",{"key":31,"text":105,"correct":29},"1",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1125931,"压浆过程中及压浆后48h内，结构混凝土的温度不得低于( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"30℃",{"key":24,"text":113,"correct":22},"4℃",{"key":27,"text":115,"correct":29},"5℃",{"key":31,"text":117,"correct":22},"6℃",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1125932,"后张法预应力筋张拉后，孔道( )压浆。",[122,124,126,128],{"key":20,"text":123,"correct":22},"宜尽早",{"key":24,"text":125,"correct":22},"不急于",{"key":27,"text":127,"correct":29},"应及时",{"key":31,"text":129,"correct":22},"暂缓",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1125933,"张拉控制应力达到( )后方可锚固。",[134,136,138,140],{"key":20,"text":135,"correct":22},"规范要求",{"key":24,"text":137,"correct":29},"稳定",{"key":27,"text":139,"correct":22},"设计要求",{"key":31,"text":141,"correct":22},"张拉方案要求",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1125934,"大体积混凝土构筑物拆模时，混凝土表面与中心、与室外的温差不超过( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"10℃",{"key":24,"text":149,"correct":29},"20℃",{"key":27,"text":151,"correct":22},"25℃",{"key":31,"text":111,"correct":22},{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},1125935,"预应力张拉应由( )主持。",[157,159,161,163],{"key":20,"text":158,"correct":22},"操作班长",{"key":24,"text":160,"correct":22},"施工员",{"key":27,"text":162,"correct":22},"技术员",{"key":31,"text":164,"correct":29},"项目技术负责人",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1125936,"钻孔灌注桩单桩混凝土灌注时间宜控制在( )内。",[169,171,173,175],{"key":20,"text":170,"correct":22},"1.2倍混凝土初凝时间",{"key":24,"text":172,"correct":29},"1.5倍混凝土初凝时间",{"key":27,"text":174,"correct":22},"1.2倍混凝土终凝时间",{"key":31,"text":176,"correct":22},"1.5倍混凝土终凝时间",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1125937,"下列选项中，非造成钻孔灌注桩质量事故原因的是( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"地质勘探资料存在问题",{"key":24,"text":184,"correct":29},"混凝土温度变形",{"key":27,"text":186,"correct":22},"钻孔深度误差",{"key":31,"text":188,"correct":22},"钻孔孔径误差",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},1125938,"根据实际情况采取地面预注浆、隧道内小导管注浆和衬砌结构背后注浆等措施，控制( )在允许范围。",[193,195,197,199],{"key":20,"text":194,"correct":22},"拱顶变形",{"key":24,"text":196,"correct":22},"结构变形",{"key":27,"text":198,"correct":29},"地层变形",{"key":31,"text":200,"correct":22},"地面变形",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1125939,"喷射混凝土施工时，喷射作业分段、分层进行，喷射顺序( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"由上而下",{"key":24,"text":208,"correct":22},"由右而左",{"key":27,"text":210,"correct":22},"由左而右",{"key":31,"text":212,"correct":29},"由下而上",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1125941,"基坑回填料除( )外， 其他均可回填。",[217,219,221,223],{"key":20,"text":218,"correct":22},"粉质黏土",{"key":24,"text":220,"correct":22},"有机质含量小于8%的腐殖土",{"key":27,"text":222,"correct":29},"纯黏土",{"key":31,"text":224,"correct":22},"小于150mm粒径的石块",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1125942,"仰拱混凝士强度达到5MPa后人员方可通行，达到设计文件规定强度的（）后车辆方可通行。",[229,231,233,235],{"key":20,"text":230,"correct":22},"70%",{"key":24,"text":232,"correct":22},"75%",{"key":27,"text":234,"correct":22},"80%",{"key":31,"text":236,"correct":29},"100%",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1125943,"下列给水排水混凝土构筑物防渗漏措施中，属于设计考虑的是( )。",[241,243,245,247],{"key":20,"text":242,"correct":29},"增配小直径、小间距构造配筋",{"key":24,"text":244,"correct":22},"严格控制混凝土原材料质量",{"key":27,"text":246,"correct":22},"适当减少水泥用量和水用量，降低水胶比中的水灰比",{"key":31,"text":248,"correct":22},"设置后浇带时，要遵循“数量适当，位置合理”的原则",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1125944,"不属于混凝土结构水处理构筑物质量验收主控项目的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"结构类型和结构尺寸符合设计要求",{"key":24,"text":256,"correct":22},"混凝土结构外观无严重质量缺陷",{"key":27,"text":258,"correct":22},"构筑物外壁不得渗水",{"key":31,"text":260,"correct":29},"结构表面应光滑平顺，线性流畅",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},1125945,"关于构筑物变形缝质量验收主控项目的说法，错误的是( )。",[265,267,269,271],{"key":20,"text":266,"correct":22},"止水带、柔性密封材料等的产品质量保证资料应齐全",{"key":24,"text":268,"correct":22},"止水带位置应符合设计要求；安装固定稳固，无孔洞、撕裂、扭曲、褶皱等现象",{"key":27,"text":270,"correct":22},"先行施工一侧的变形缝结构端面应平整、垂直",{"key":31,"text":272,"correct":29},"端面混凝土外观严禁出现严重质量缺陷，允许有个别明显的一般质量缺陷",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1125946,"热力管道穿过构筑物墙板处应按设计要求安装套管，套管长度每侧应大于墙厚( )。",[277,279,281,283],{"key":20,"text":278,"correct":22},"5mm",{"key":24,"text":280,"correct":22},"10mm",{"key":27,"text":282,"correct":22},"15mm",{"key":31,"text":284,"correct":29},"20mm",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},1125947,"热力管道安装质量检验的主控项目之一是( )。",[289,291,293,295],{"key":20,"text":290,"correct":22},"中心线位移",{"key":24,"text":292,"correct":22},"立管垂直度",{"key":27,"text":294,"correct":29},"对口间隙",{"key":31,"text":296,"correct":22},"保温层厚度",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":27,"analysis":33},1125948,"热力管道安装质量检验主控项目为( )。",[301,303,305,307],{"key":20,"text":302,"correct":22},"高程、中心线位移",{"key":24,"text":304,"correct":22},"中心线位移、立管垂直度",{"key":27,"text":306,"correct":29},"高程、对口间隙",{"key":31,"text":308,"correct":22},"立管垂直度、对口间隙",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1125949,"燃气、热力管道法兰与管道组装时，通常用( )检查法兰的垂直度。",[313,315,317,319],{"key":20,"text":314,"correct":22},"铅锤",{"key":24,"text":316,"correct":29},"角尺",{"key":27,"text":318,"correct":22},"水平尺",{"key":31,"text":320,"correct":22},"卡尺",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},1125950,"压力表的量程，当设计无要求时，应为工作压力的( )倍。",[325,327,329,331],{"key":20,"text":326,"correct":22},"1.1～1.3",{"key":24,"text":328,"correct":22},"1.3～1.5",{"key":27,"text":330,"correct":29},"1.5～2",{"key":31,"text":332,"correct":22},"2～2.5",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},1125951,"从事市政公用工程压力管道焊接的焊工，必须持有有关部门统一印制的《特种设备作业人员证》，并在有效期内，该有关部门是指( )。",[337,339,341,343],{"key":20,"text":338,"correct":22},"国务院城市建设主管部门",{"key":24,"text":340,"correct":22},"人力资源和社会保障部",{"key":27,"text":342,"correct":29},"国家质检总局",{"key":31,"text":344,"correct":22},"各地技术质量监督局",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1125952,"对检验不合格的焊缝必须返修至合格，返修次数不得大于( )次。",[349,350,352,354],{"key":20,"text":105,"correct":22},{"key":24,"text":351,"correct":29},"2",{"key":27,"text":353,"correct":22},"3",{"key":31,"text":355,"correct":22},"4",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":27,"analysis":33},1125953,"柔性管道回填时间宜在一昼夜中( )气温时段。",[360,362,364,366],{"key":20,"text":361,"correct":22},"平均",{"key":24,"text":363,"correct":22},"最高",{"key":27,"text":365,"correct":29},"最低",{"key":31,"text":367,"correct":22},"管材要求的",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1125954,"当阀门与管道以法兰或螺纹方式连接时，阀门应在( )状态下安装。",[372,374,376,378],{"key":20,"text":373,"correct":29},"关闭",{"key":24,"text":375,"correct":22},"打开1／3",{"key":27,"text":377,"correct":22},"半开",{"key":31,"text":379,"correct":22},"全开",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1125955,"在燃气管道上开孔时无法满足管道开孔边缘与管道焊缝的间距要求时，应对以开孔中心为圆心、1.5倍开孔直径为半径的圆中所包容的全部焊缝进行( )检测。",[384,386,388,390],{"key":20,"text":385,"correct":22},"抽样",{"key":24,"text":387,"correct":29},"100%射线",{"key":27,"text":389,"correct":22},"试验",{"key":31,"text":391,"correct":22},"100%超声波",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":27,"analysis":33},1125956,"关于柔性管道回填的说法，错误的是( )。",[396,398,400,402],{"key":20,"text":397,"correct":22},"柔性管道的沟槽回填质量控制是柔性管道工程施工质量控制的关键",{"key":24,"text":399,"correct":22},"现场试验段主要用以确定压实机械和施工参数",{"key":27,"text":401,"correct":29},"在设计的管基有效支承角范围必须用中粗砂、黏土填充密实，与管壁紧密接触",{"key":31,"text":403,"correct":22},"管道回填从管底基础部位开始到管顶以上500mm范围内，必须采用人工回填",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},1125957,"回填施工中应在管内设竖向支撑的柔性管道是内径大于( )mm的管道。",[408,410,412,414],{"key":20,"text":409,"correct":29},"800",{"key":24,"text":411,"correct":22},"750",{"key":27,"text":413,"correct":22},"700",{"key":31,"text":415,"correct":22},"650",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1125958,"在有缝钢管上焊接分支管时，分支管外壁与其他焊缝中心的距离，应大于分支管外径，且不得小于( )mm。",[420,422,424,426],{"key":20,"text":421,"correct":29},"70",{"key":24,"text":423,"correct":22},"80",{"key":27,"text":425,"correct":22},"90",{"key":31,"text":427,"correct":22},"100",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1125959,"热力管道保温材料进场，应根据标准规定现场按批抽样检测材料的( )。",[432,434,436,438],{"key":20,"text":433,"correct":22},"密度",{"key":24,"text":435,"correct":29},"导热系数",{"key":27,"text":437,"correct":22},"透气性",{"key":31,"text":439,"correct":22},"表面特性",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},1125960,"根据《混凝土结构工程施工质量验收规范》GB50204-2015，不属于钢筋工程主控项目的是（）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"钢筋的力学性能",{"key":24,"text":447,"correct":22},"钢筋的重量偏差",{"key":27,"text":449,"correct":29},"钢筋的安装间距偏差",{"key":31,"text":451,"correct":22},"受力钢筋的连接方式",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1125961,"关于柔性管道的沟槽回填质量控制，以下说法错误的是( )。",[456,458,460,462],{"key":20,"text":457,"correct":22},"回填前，检查管道有无损伤及变形，有损伤管道应修复或更换",{"key":24,"text":459,"correct":22},"管内径大于800㎜的柔性管道，回填施工中应在管内设竖向支撑",{"key":27,"text":461,"correct":22},"管道回填时间宜在一昼夜中气温最低的时刻，从管道两侧同时回填，同时夯实",{"key":31,"text":463,"correct":29},"管道回填从管底基础部位开始到管顶以上0.5m范围内，采用机械或人工回填，管顶0.5m以上部位。可用机械从管道轴线两侧同时回填夯实",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1125963,"项目部安全生产第一责任人是项目（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":29},"经理",{"key":24,"text":471,"correct":22},"生产副经理",{"key":27,"text":473,"correct":22},"技术负责人",{"key":31,"text":475,"correct":22},"专职安全员",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1125964,"一般情况下，季节性安全检查的组织人是项目( )。",[480,481,483,484],{"key":20,"text":475,"correct":29},{"key":24,"text":482,"correct":22},"副经理",{"key":27,"text":473,"correct":22},{"key":31,"text":469,"correct":22},{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},1125965,"施工安全保证计划应在项目( )支持下开展编制活动。",[489,491,492,494],{"key":20,"text":490,"correct":22},"负责人",{"key":24,"text":473,"correct":29},{"key":27,"text":493,"correct":22},"生产负责人",{"key":31,"text":475,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},1125966,"合同价在5000万元以下的市政工程至少配置（ ）名专职安全员。",[499,500,501,502],{"key":20,"text":355,"correct":22},{"key":24,"text":353,"correct":22},{"key":27,"text":351,"correct":22},{"key":31,"text":105,"correct":29},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},1125967,"一般情况下，不会组织综合安全检查的人员是项目( )。",[507,508,509,510],{"key":20,"text":469,"correct":22},{"key":24,"text":482,"correct":22},{"key":27,"text":473,"correct":22},{"key":31,"text":475,"correct":29},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},1125968,"下列工作中，不以施工现场管理体系为必不可少依据的是( )。",[515,517,519,521],{"key":20,"text":516,"correct":29},"准确识别工程重大危险源和不利环境因素",{"key":24,"text":518,"correct":22},"实现安全文明施工",{"key":27,"text":520,"correct":22},"评价安保体系、实现持续改进",{"key":31,"text":522,"correct":22},"事故预防",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},1125969,"放坡开挖基坑时，需要根据土的分类、力学指标和开挖深度确定沟槽的( )。",[527,529,531,533],{"key":20,"text":528,"correct":22},"开挖方法",{"key":24,"text":530,"correct":22},"边坡防护措施",{"key":27,"text":532,"correct":29},"边坡坡度",{"key":31,"text":534,"correct":22},"开挖机具",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":27,"analysis":33},1125970,"施工竖井井口( )范围内不得堆放材料。",[539,541,543,545],{"key":20,"text":540,"correct":22},"1.0m",{"key":24,"text":542,"correct":22},"1.5m",{"key":27,"text":544,"correct":29},"2.0m",{"key":31,"text":546,"correct":22},"2.5m",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1125971,"两条平行暗挖隧道相距小于1倍洞跨时，其开挖面前后错开距离不得小于( )。",[551,553,555,557],{"key":20,"text":552,"correct":22},"10m",{"key":24,"text":554,"correct":29},"15m",{"key":27,"text":556,"correct":22},"20m",{"key":31,"text":558,"correct":22},"25m",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1125972,"喷锚暗挖法二次衬砌应在( )后施工。",[563,565,567,569],{"key":20,"text":564,"correct":29},"初期支护变形稳定",{"key":24,"text":566,"correct":22},"地层变形稳定",{"key":27,"text":568,"correct":22},"隧道贯通",{"key":31,"text":570,"correct":22},"防水层施工完成",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1125973,"下列选项中，不属于基坑开挖时对现况地下管线安全保护措施的是( )。",[575,577,579,581],{"key":20,"text":576,"correct":22},"悬吊、加固",{"key":24,"text":578,"correct":29},"现况管线调查",{"key":27,"text":580,"correct":22},"加强对现况管线监测",{"key":31,"text":582,"correct":22},"管线拆迁、改移",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},1125974,"施工竖井不得设在低洼处，井口应比周围地面高( )以上。",[587,589,591,593],{"key":20,"text":588,"correct":22},"0.2m",{"key":24,"text":590,"correct":29},"0.3m",{"key":27,"text":592,"correct":22},"0.4m",{"key":31,"text":594,"correct":22},"0.5m",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},1125975,"同一暗挖隧道相对开挖（非爆破方法）的两开挖面距离为( )倍洞跨且不小于10m时，一端应停止掘进，并保持开挖面稳定。",[599,601,602,604],{"key":20,"text":600,"correct":22},"1.5",{"key":24,"text":351,"correct":29},{"key":27,"text":603,"correct":22},"2.5",{"key":31,"text":353,"correct":22},[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]