[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,28,50,2846,[13,34,46,58,70,78,86,97,109,121,133,145,157,169,181,193,205,217,229,241,253,265,277,289,300,312,324,336,345,357,369,381,393,405,417,429,441,453,462,471,481,493,505,517,529,538,547,559,571,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1125873,1,"单选题","施工项目质量保证计划应体现从资源投入到工程质量最终检验试验的( )控制。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","全过程",true,{"key":24,"text":25,"correct":26},"B","质量目标",false,{"key":28,"text":29,"correct":26},"C","质量",{"key":31,"text":32,"correct":26},"D","过程","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1125874,"施工项目质量保证计划应由项目( )主持编制。",[38,40,42,44],{"key":20,"text":39,"correct":26},"质量负责人",{"key":24,"text":41,"correct":26},"技术负责人",{"key":28,"text":43,"correct":22},"负责人",{"key":31,"text":45,"correct":26},"生产负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1125875,"进行不合格让步接收时，项目部应向( )提出书面让步接收申请。",[50,52,54,56],{"key":20,"text":51,"correct":26},"质监站",{"key":24,"text":53,"correct":26},"监理",{"key":28,"text":55,"correct":22},"发包方",{"key":31,"text":57,"correct":26},"接管方",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1125876,"施工过程质量控制中，不包括( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"质量计划制定",{"key":24,"text":65,"correct":26},"分项工程（工序）控制",{"key":28,"text":67,"correct":26},"特殊过程控制",{"key":31,"text":69,"correct":26},"不合格产品控制",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1125877,"按质量计划中关于工程分包和物资采购的规定，经招标程序选择并评价分包方和供应商，保存评价记录；其执行人为项目( )。",[74,75,76,77],{"key":20,"text":43,"correct":22},{"key":24,"text":45,"correct":26},{"key":28,"text":41,"correct":26},{"key":31,"text":39,"correct":26},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1125878,"施工准备阶段质量管理的内容之一图纸会审，应由项目( )主持。",[82,83,84,85],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":31,"analysis":33},1125879,"实行分包的分项、分部工程，应制定( )和质量保证措施。",[90,92,93,95],{"key":20,"text":91,"correct":26},"质量计划",{"key":24,"text":25,"correct":26},{"key":28,"text":94,"correct":26},"质量控制",{"key":31,"text":96,"correct":22},"质量验收程序",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":31,"analysis":33},1125880,"水泥贮存期在( )内，不一定要进行性能试验。",[101,103,105,107],{"key":20,"text":102,"correct":26},"6个月",{"key":24,"text":104,"correct":26},"5个月",{"key":28,"text":106,"correct":26},"4个月",{"key":31,"text":108,"correct":22},"3个月",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":24,"analysis":33},1125881,"道路基层用水泥土宜采用( )水泥稳定。",[113,115,117,119],{"key":20,"text":114,"correct":26},"高强",{"key":24,"text":116,"correct":22},"42.5级普通硅酸盐水泥、32.5级及以上矿渣硅酸盐水泥、火山灰硅酸盐水泥",{"key":28,"text":118,"correct":26},"早强",{"key":31,"text":120,"correct":26},"钢渣",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":28,"analysis":33},1125882,"用作道路底基层的石灰稳定土，宜选用塑性指数为( )的黏性土。",[125,127,129,131],{"key":20,"text":126,"correct":26},"5～8",{"key":24,"text":128,"correct":26},"8～10",{"key":28,"text":130,"correct":22},"10～15",{"key":31,"text":132,"correct":26},"15～18",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":31,"analysis":33},1125883,"基层施工时，铺筑材料工地实测干密度与最大干密度之比称为( )。",[137,139,141,143],{"key":20,"text":138,"correct":26},"厚度系数",{"key":24,"text":140,"correct":26},"摊铺系数",{"key":28,"text":142,"correct":26},"虚铺系数",{"key":31,"text":144,"correct":22},"压实系数",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":20,"analysis":33},1125884,"水泥稳定土（碎石、砂砾）应采用( )的水泥。",[149,151,153,155],{"key":20,"text":150,"correct":22},"初凝时间3h以上和终凝时间6h以上",{"key":24,"text":152,"correct":26},"初凝时间2h以上和终凝时间4h的高强",{"key":28,"text":154,"correct":26},"终凝时间超过5h的快硬、早强",{"key":31,"text":156,"correct":26},"初凝时间3h以上和终凝时间5h",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":20,"analysis":33},1125885,"根据GB50092-96规定，城市道路沥青混合料路面抗滑表层还应检查( )。",[161,163,165,167],{"key":20,"text":162,"correct":22},"构造深度、摩擦系数（摆值）",{"key":24,"text":164,"correct":26},"构造深度、粗糙度",{"key":28,"text":166,"correct":26},"构造深度、摩擦力",{"key":31,"text":168,"correct":26},"粗糙度、摩擦系数（摆值）",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":20,"analysis":33},1125886,"水泥混凝土路面所用水泥的出厂期不得超过( )个月。",[173,175,177,179],{"key":20,"text":174,"correct":22},"3",{"key":24,"text":176,"correct":26},"4",{"key":28,"text":178,"correct":26},"5",{"key":31,"text":180,"correct":26},"6",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":31,"analysis":33},1125887,"人工施工水泥混凝土路面时，振动器的振动顺序为( )。",[185,187,189,191],{"key":20,"text":186,"correct":26},"平板式振捣器→插入式振捣器→振动梁（轻）→振动梁（重）→无缝钢管滚杆提浆赶浆",{"key":24,"text":188,"correct":26},"平板式振捣器→插入式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",{"key":28,"text":190,"correct":26},"插入式振捣器→平板式振捣器→振动梁（轻）→振动梁（重）→无缝钢管滚杆提浆赶浆",{"key":31,"text":192,"correct":22},"插入式振捣器→平板式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},1125888,"不得直接用于水泥混凝土路面面层的砂是( )。",[197,199,201,203],{"key":20,"text":198,"correct":22},"海砂",{"key":24,"text":200,"correct":26},"淡化海砂",{"key":28,"text":202,"correct":26},"江砂",{"key":31,"text":204,"correct":26},"机制砂",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":28,"analysis":33},1125889,"城镇道路雨期施工时，要防排结合，建立完善的( )。",[209,211,213,215],{"key":20,"text":210,"correct":26},"防水系统",{"key":24,"text":212,"correct":26},"挡水系统",{"key":28,"text":214,"correct":22},"排水系统",{"key":31,"text":216,"correct":26},"防排系统",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":20,"analysis":33},1125890,"城镇道路稳定类材料基层雨期施工不宜( )。",[221,223,225,227],{"key":20,"text":222,"correct":22},"摊铺段过长",{"key":24,"text":224,"correct":26},"当日摊铺、当日碾压成活",{"key":28,"text":226,"correct":26},"未碾压的料层受雨淋后，应进行测试分析，按配合比要求重新搅拌",{"key":31,"text":228,"correct":26},"及时开挖排水沟或排水坑，以便尽快排除积水",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},1125891,"工程中填土的质量标准常用压实度来控制，它是( )的比值，一般以百分率表示。",[233,235,237,239],{"key":20,"text":234,"correct":22},"实测干密度与最大干密度",{"key":24,"text":236,"correct":26},"实测土容重与最大干密度",{"key":28,"text":238,"correct":26},"最大干密度与实测干密度",{"key":31,"text":240,"correct":26},"最大干密度与实测土容重",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":24,"analysis":33},1125892,"冬期施工的水泥混凝土面板，弯拉强度和抗压强度分别低于( )时，严禁受冻。",[245,247,249,251],{"key":20,"text":246,"correct":26},"1.5MPa和5.0MPa",{"key":24,"text":248,"correct":22},"1.0MPa和5.0MPa",{"key":28,"text":250,"correct":26},"1.0MPa和5.5MPa",{"key":31,"text":252,"correct":26},"1.5MPa和5.5MPa",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":31,"analysis":33},1125893,"关于路基雨期施工的说法，不正确的是( )。",[257,259,261,263],{"key":20,"text":258,"correct":26},"集中力量，快速施工，分段开挖，切忌全面开花或挖段过长。",{"key":24,"text":260,"correct":26},"坚持当天挖完、填完、压完，不留后患。",{"key":28,"text":262,"correct":26},"填土路基应按2％～3％以上的横坡整平、压实",{"key":31,"text":264,"correct":22},"因雨翻浆，用重型压路机重新压实",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":28,"analysis":33},1125894,"在0～80cm深度范围内的主干路填土路基最低压实度（按重型击实标准）应为( )。",[269,271,273,275],{"key":20,"text":270,"correct":26},"90%",{"key":24,"text":272,"correct":26},"93%",{"key":28,"text":274,"correct":22},"95%",{"key":31,"text":276,"correct":26},"98%",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":28,"analysis":33},1125895,"现场实测土路基干密度和含水量不用( )。",[281,283,285,287],{"key":20,"text":282,"correct":26},"灌水法",{"key":24,"text":284,"correct":26},"灌砂法",{"key":28,"text":286,"correct":22},"蜡封法",{"key":31,"text":288,"correct":26},"环刀法",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":31,"analysis":33},1125896,"下列雨期道路工程施工质量保证措施中，属于面层施工要求的是( )。",[293,295,297,298],{"key":20,"text":294,"correct":26},"当天挖完、填完、压完，不留后患",{"key":24,"text":296,"correct":26},"应按2%～3%以上的横坡整平压实，以防积水",{"key":28,"text":226,"correct":26},{"key":31,"text":299,"correct":22},"及时浇筑、振动、抹面成型、养护",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":31,"analysis":33},1125897,"城镇道路石灰稳定土基层施工时，对石灰要求错误的是( )。",[304,306,308,310],{"key":20,"text":305,"correct":26},"宜采用1～3级的新石灰",{"key":24,"text":307,"correct":26},"可直接使用磨细生石灰",{"key":28,"text":309,"correct":26},"块灰应在使用前2～3d完成消解",{"key":31,"text":311,"correct":22},"消解石灰粒径不得大于20mm",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1125898,"在拌制石灰稳定土时，宜用1～3级的新石灰，可不经消解直接使用是( )。",[316,318,320,322],{"key":20,"text":317,"correct":26},"2级生石灰",{"key":24,"text":319,"correct":22},"磨细生石灰",{"key":28,"text":321,"correct":26},"块状生石灰",{"key":31,"text":323,"correct":26},"粒径大于10mm生石灰",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":28,"analysis":33},1125899,"对某一土样，在一定的击实功能作用下，只有( )。",[328,330,332,334],{"key":20,"text":329,"correct":26},"当水的含量为最小含水量时，土样才能达到最大干密度",{"key":24,"text":331,"correct":26},"当水的含量为最小含水量时，土样才能达到实测干密度",{"key":28,"text":333,"correct":22},"当水的含量为最佳含水量时，土样才能达到最大干密度",{"key":31,"text":335,"correct":26},"当水的含量为最佳含水量时，土样才能达到实测干密度",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":20,"analysis":33},1125900,"用于沥青路面压实度检测的方法是( )。",[340,342,343,344],{"key":20,"text":341,"correct":22},"钻芯法",{"key":24,"text":288,"correct":26},{"key":28,"text":284,"correct":26},{"key":31,"text":282,"correct":26},{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1125901,"水泥稳定碎石基层采用的材料中，水泥的存放期自出厂日期算起，最长不得超过( )。",[349,351,353,355],{"key":20,"text":350,"correct":26},"两个月",{"key":24,"text":352,"correct":22},"三个月",{"key":28,"text":354,"correct":26},"四个月",{"key":31,"text":356,"correct":26},"半年",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},1125902,"城市主干道的水泥混凝土路面不宜选择的主要原材料是( )。",[361,363,365,367],{"key":20,"text":362,"correct":26},"42.5级以上硅酸盐水泥",{"key":24,"text":364,"correct":26},"粒径小于19.0mm砾石",{"key":28,"text":366,"correct":26},"粒径小于31.5mm碎石",{"key":31,"text":368,"correct":22},"细度模数在2.5以上的淡化海盐",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},1125903,"用于水泥稳定土基层的土宜选用( )土。",[373,375,377,379],{"key":20,"text":374,"correct":22},"粗粒、中粒",{"key":24,"text":376,"correct":26},"均匀系数小于5的",{"key":28,"text":378,"correct":26},"细粒",{"key":31,"text":380,"correct":26},"塑性指数小于8的",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1125904,"水泥稳定土从开始加水拌合到摊铺完成不得超过( )。",[385,387,389,391],{"key":20,"text":386,"correct":22},"3h",{"key":24,"text":388,"correct":26},"4h",{"key":28,"text":390,"correct":26},"5h",{"key":31,"text":392,"correct":26},"6h",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},1125905,"行业标准CJJ1-2008规定，沥青混凝土面层( )是主控项目。",[397,399,401,403],{"key":20,"text":398,"correct":26},"平整度、厚度和弯沉值",{"key":24,"text":400,"correct":26},"压实度、平整度和面层厚度",{"key":28,"text":402,"correct":26},"压实度、平整度和弯沉值",{"key":31,"text":404,"correct":22},"压实度、面层厚度和弯沉值",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1125906,"用作基层的无机结合料的控制指标之一是( )无侧限抗压强度。",[409,411,413,415],{"key":20,"text":410,"correct":26},"3d",{"key":24,"text":412,"correct":22},"7d",{"key":28,"text":414,"correct":26},"14d",{"key":31,"text":416,"correct":26},"28d",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},1125907,"水泥混凝土面层组成材料中，碎石最大公称粒径不应大于( )mm。",[421,423,425,427],{"key":20,"text":422,"correct":26},"36.5",{"key":24,"text":424,"correct":22},"31.5",{"key":28,"text":426,"correct":26},"26.5",{"key":31,"text":428,"correct":26},"21.5",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1125908,"关于确保水泥混凝土在规定时间内完成施工的说法，正确的是( )。",[433,435,437,439],{"key":20,"text":434,"correct":26},"混凝土从出料到铺筑完成的时间不能超过施组规定",{"key":24,"text":436,"correct":22},"混凝土从出料到铺筑完成的时间不能超过规范规定",{"key":28,"text":438,"correct":26},"混凝土从出料到碾压完成的时间不能超过施组规定",{"key":31,"text":440,"correct":26},"混凝土从出料到碾压完成的时间不能超过规范规定",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},1125909,"关于城镇道路土路基雨期施工的说法，正确的是( )。",[445,447,449,451],{"key":20,"text":446,"correct":26},"集中力量，全面开花，快速施工",{"key":24,"text":448,"correct":22},"坚持当天挖完、填完、压完，不留后患",{"key":28,"text":450,"correct":26},"填土路基应按2%～4%以上的横坡整平压实",{"key":31,"text":452,"correct":26},"因雨翻浆地段，用重型压路机重新压实",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},1125910,"城镇快速路、主干路、次干路的水泥混凝土面层不得采用( )。",[457,458,459,460],{"key":20,"text":202,"correct":26},{"key":24,"text":204,"correct":26},{"key":28,"text":200,"correct":22},{"key":31,"text":461,"correct":26},"河砂",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},1125911,"城市快速路、主干路路床顶面以下0～300mm范围内，采用重型击实标准，土的压实度应不低于( )。",[466,468,469,470],{"key":20,"text":467,"correct":26},"87%",{"key":24,"text":270,"correct":26},{"key":28,"text":272,"correct":26},{"key":31,"text":274,"correct":22},{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":31,"analysis":33},1125912,"水泥混凝土面层冬期施工养护时间不少于( )。",[475,476,478,480],{"key":20,"text":414,"correct":26},{"key":24,"text":477,"correct":26},"18d",{"key":28,"text":479,"correct":26},"24d",{"key":31,"text":416,"correct":22},{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":28,"analysis":33},1125913,"混凝土面层振捣工序中，振动器的振动顺序正确的是( )。",[485,487,489,491],{"key":20,"text":486,"correct":26},"插入式振捣器→振动梁→平板式振动器→钢滚筒提浆赶浆",{"key":24,"text":488,"correct":26},"平板式振动器→插入式振捣器→钢滚筒提浆赶浆",{"key":28,"text":490,"correct":22},"插入式振捣器→平板式振动器→振动梁→钢滚筒提浆赶浆",{"key":31,"text":492,"correct":26},"振动梁→插入式振捣器→平板式振动器→钢滚筒提浆赶浆",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1125914,"切缝法施工用于水泥混凝土路面的( )。",[497,499,501,503],{"key":20,"text":498,"correct":26},"胀缝",{"key":24,"text":500,"correct":22},"缩缝",{"key":28,"text":502,"correct":26},"纵缝",{"key":31,"text":504,"correct":26},"施工缝",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1125915,"当施工现场日平均气温连续5d稳定低于( )时，严禁进行城市主干路、快速路热拌沥青混合料摊铺施工。",[509,511,513,515],{"key":20,"text":510,"correct":26},"10℃",{"key":24,"text":512,"correct":22},"5℃",{"key":28,"text":514,"correct":26},"0℃",{"key":31,"text":516,"correct":26},"15℃",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1125916,"日均气温达25℃时，水泥混凝土路面拌合物运输要做到( )。",[521,523,525,527],{"key":20,"text":522,"correct":26},"覆盖保温",{"key":24,"text":524,"correct":22},"用连续搅拌车运送",{"key":28,"text":526,"correct":26},"装料高度不超过2m",{"key":31,"text":528,"correct":26},"确保在水泥混凝土终凝前有充分时间完成路面抹面",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},1125917,"水泥贮存期超过( )或受潮，应进行性能试验，合格后方可使用。",[533,535,536,537],{"key":20,"text":534,"correct":26},"2个月",{"key":24,"text":108,"correct":22},{"key":28,"text":106,"correct":26},{"key":31,"text":356,"correct":26},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1125918,"( )不得直接用于水泥混凝土路面面层。",[542,543,544,546],{"key":20,"text":198,"correct":22},{"key":24,"text":200,"correct":26},{"key":28,"text":545,"correct":26},"粗砂",{"key":31,"text":204,"correct":26},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},1125919,"城市主干道沥青路面不宜采用( )。",[551,553,555,557],{"key":20,"text":552,"correct":26},"SMA",{"key":24,"text":554,"correct":26},"温拌沥青混合料",{"key":28,"text":556,"correct":22},"冷拌沥青混合料",{"key":31,"text":558,"correct":26},"抗车辙沥青混合料",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1125921,"钻孔灌注桩施工时，为防止塌孔与缩径，通常采取措施之一是( )。",[563,565,567,569],{"key":20,"text":564,"correct":22},"控制成孔速度",{"key":24,"text":566,"correct":26},"部分回填黏性土",{"key":28,"text":568,"correct":26},"全部回填黏性土",{"key":31,"text":570,"correct":26},"上下反复提钻扫孔",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1125922,"大体积混凝土养护，不仅要满足其强度增长需要，还应通过( )控制，防止其开裂。",[575,577,579,581],{"key":20,"text":576,"correct":22},"温度",{"key":24,"text":578,"correct":26},"应变",{"key":28,"text":580,"correct":26},"湿度",{"key":31,"text":582,"correct":26},"应力",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},1125923,"预应力筋张拉前应根据设计要求对孔道的( )进行实测。",[587,589,591,593],{"key":20,"text":588,"correct":22},"摩阻损失",{"key":24,"text":590,"correct":26},"直径",{"key":28,"text":592,"correct":26},"摩阻力",{"key":31,"text":594,"correct":26},"长度",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]