[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,27,50,2846,[13,34,46,58,70,81,93,105,117,129,141,150,160,172,184,196,208,220,232,244,256,268,278,290,302,311,323,335,344,356,368,380,392,404,416,428,440,452,463,475,487,499,511,523,535,545,553,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1125821,1,"单选题","关于项目部职业健康安全管理的说法，正确的是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","策划本项目职业卫生设施可从职工工作用的饮水设施开始考虑",false,{"key":24,"text":25,"correct":26},"B","项目部职业健康安全管理方案中的具体措施可与劳动保护、职业病防治相结合",true,{"key":28,"text":29,"correct":22},"C","策划本项目职业卫生设施可从更衣室或存衣箱，工作服洗涤、干燥、消毒设备开始考虑",{"key":31,"text":32,"correct":22},"D","策划本项目职业卫生设施可从食物的加热设备开始考虑","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1125822,"施工项目合同订立主体是发包方和承包方，具体履行合同各项约定的是受承包方委托的()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"法人",{"key":24,"text":41,"correct":22},"法定代表人",{"key":28,"text":43,"correct":22},"代理人",{"key":31,"text":45,"correct":26},"项目负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1125823,"施工项目合同变更、转让、终止和解除，应依()规定进行。",[50,52,54,56],{"key":20,"text":51,"correct":22},"招标投标法",{"key":24,"text":53,"correct":22},"建筑法",{"key":28,"text":55,"correct":26},"合同法",{"key":31,"text":57,"correct":22},"劳动法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1125824,"施工项目订立合同、洽商变更和记录必须采用()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"书面形式",{"key":24,"text":65,"correct":26},"书面形式并签字确认",{"key":28,"text":67,"correct":22},"电子文档",{"key":31,"text":69,"correct":22},"口头协议",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1125825,"施工中遇合同变更，必须掌握变更情况，按有关规定及时办理变更手续者是()。",[74,76,78,79],{"key":20,"text":75,"correct":22},"监理工程师",{"key":24,"text":77,"correct":22},"业主代表",{"key":28,"text":45,"correct":26},{"key":31,"text":80,"correct":22},"企业负责人",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":20,"analysis":33},1125826,"当合同约定内容完成后，()应进行总结与评价。",[85,87,89,91],{"key":20,"text":86,"correct":26},"承包方",{"key":24,"text":88,"correct":22},"分包方",{"key":28,"text":90,"correct":22},"发包方",{"key":31,"text":92,"correct":22},"项目经理",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1125827,"向监理工程师发出索赔意向通知，应在索赔事件发生后()内方为有效。",[97,99,101,103],{"key":20,"text":98,"correct":22},"14d",{"key":24,"text":100,"correct":26},"28d",{"key":28,"text":102,"correct":22},"42d",{"key":31,"text":104,"correct":22},"56d",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1125828,"索赔证据资料中，不包括()。",[109,111,113,115],{"key":20,"text":110,"correct":22},"索赔金额计算依据",{"key":24,"text":112,"correct":22},"索赔工期计算依据",{"key":28,"text":114,"correct":22},"索赔事件原因",{"key":31,"text":116,"correct":26},"项目部组成人员变更",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1125829,"合同风险管理主要内容之一是对可能发生或已经发生的风险进行有效的()。",[121,123,125,127],{"key":20,"text":122,"correct":26},"控制",{"key":24,"text":124,"correct":22},"分析",{"key":28,"text":126,"correct":22},"识别",{"key":31,"text":128,"correct":22},"评估",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1125830,"以下选项中属于合同风险分散和转移的措施是()。",[133,135,137,139],{"key":20,"text":134,"correct":22},"增设风险合同条款",{"key":24,"text":136,"correct":22},"加强索赔管理",{"key":28,"text":138,"correct":26},"向保险公司投保",{"key":31,"text":140,"correct":22},"增设保值条款",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1125831,"劳务分包应实施实名制管理，其执行主体是()和项目部。",[145,146,147,148],{"key":20,"text":90,"correct":22},{"key":24,"text":86,"correct":26},{"key":28,"text":88,"correct":22},{"key":31,"text":149,"correct":22},"监理方",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":28,"analysis":33},1125832,"发生工程变更时，应由承包人以正式函件首先向()提出索赔申请。",[154,156,157,158],{"key":20,"text":155,"correct":22},"发包方负责人",{"key":24,"text":77,"correct":22},{"key":28,"text":75,"correct":26},{"key":31,"text":159,"correct":22},"主管发包方部门",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":20,"analysis":33},1125833,"分包人因过失给发包人造成损失的，承包人()。",[164,166,168,170],{"key":20,"text":165,"correct":26},"承担连带责任",{"key":24,"text":167,"correct":22},"不承担相关损失",{"key":28,"text":169,"correct":22},"承担分包费用",{"key":31,"text":171,"correct":22},"承担主要责任",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},1125834,"施工成本分析中，按施工进展进行的成本分析内容，不包括( )。",[176,178,180,182],{"key":20,"text":177,"correct":26},"企业管理费分析",{"key":24,"text":179,"correct":22},"月(季)度成本分析",{"key":28,"text":181,"correct":22},"年度成本分析",{"key":31,"text":183,"correct":22},"竣工成本分析",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},1125835,"施工成本分析中，针对特定问题和与成本有关事项的分析内容，不包括( )。",[188,190,192,194],{"key":20,"text":189,"correct":22},"工期成本分析",{"key":24,"text":191,"correct":26},"人工费分析",{"key":28,"text":193,"correct":22},"资金成本分析",{"key":31,"text":195,"correct":22},"施工索赔分析",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},1125836,"不符合施工成本管理组织机构设置要求的是( )。",[200,202,204,206],{"key":20,"text":201,"correct":22},"分层统一",{"key":24,"text":203,"correct":22},"业务系统化",{"key":28,"text":205,"correct":22},"适应变化",{"key":31,"text":207,"correct":26},"因人设岗",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":28,"analysis":33},1125837,"施工成本管理的基本流程是( )",[212,214,216,218],{"key":20,"text":213,"correct":22},"成本预测→管理计划→管理决策→过程控制→成本核算→分析和考核",{"key":24,"text":215,"correct":22},"成本预测→管理决策→过程控制→管理计划→成本核算→分析和考核",{"key":28,"text":217,"correct":26},"成本预测→成本计划→成本控制→成本核算→成本分析→成本考核",{"key":31,"text":219,"correct":22},"成本预测→管理决策→管理计划→成本核算→过程控制→分析和考核",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":20,"analysis":33},1125838,"在施工成本目标控制中，最有效的方法之一是按施工图预算实行( )。",[224,226,228,230],{"key":20,"text":225,"correct":26},"量入为出",{"key":24,"text":227,"correct":22},"两算对比",{"key":28,"text":229,"correct":22},"成本核算",{"key":31,"text":231,"correct":22},"成本分析",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},1125839,"施工项目部实现有效的全过程成本管理的保证和基础是建立健全( )。",[236,238,240,242],{"key":20,"text":237,"correct":22},"统计制度",{"key":24,"text":239,"correct":26},"责任制度",{"key":28,"text":241,"correct":22},"考核制度",{"key":31,"text":243,"correct":22},"会计制度",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},1125840,"成功的项目成本管理首先要让施工项目中各个环节上的管理人员树立强烈的( )。",[248,250,252,254],{"key":20,"text":249,"correct":26},"成本意识",{"key":24,"text":251,"correct":22},"创收意识",{"key":28,"text":253,"correct":22},"核算意识",{"key":31,"text":255,"correct":22},"节支意识",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},1125841,"轮番假定多因素中一个因素变化，逐个计算、确定其对成本的影响，该方法为( )。",[260,262,264,266],{"key":20,"text":261,"correct":22},"比较法",{"key":24,"text":263,"correct":26},"因素分析法",{"key":28,"text":265,"correct":22},"比率法",{"key":31,"text":267,"correct":22},"差额计算法",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},1125842,"施工成本目标控制主要依据之一是( )。",[272,274,275,277],{"key":20,"text":273,"correct":22},"成本目标",{"key":24,"text":229,"correct":22},{"key":28,"text":276,"correct":26},"成本计划",{"key":31,"text":231,"correct":22},{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},1125843,"企业和施工项目部选用施工成本管理方法应遵循的原则之一是( )。",[282,284,286,288],{"key":20,"text":283,"correct":26},"实用性原则",{"key":24,"text":285,"correct":22},"分层统一原则",{"key":28,"text":287,"correct":22},"适应变化原则",{"key":31,"text":289,"correct":22},"业务系统化原则",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},1125845,"开挖深度为15m的人工挖孔桩工程( )。",[294,296,298,300],{"key":20,"text":295,"correct":22},"不需要编制专项方案也不需要专家论证",{"key":24,"text":297,"correct":22},"不需要编制专项方案但需要专家论证",{"key":28,"text":299,"correct":26},"要编制专项方案，但不需要专家论证",{"key":31,"text":301,"correct":22},"要编制专项方案并需要专家论证",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":28,"analysis":33},1125846,"市政公用工程施工组织设计必须经( )审批。",[306,307,308,310],{"key":20,"text":92,"correct":22},{"key":24,"text":75,"correct":22},{"key":28,"text":309,"correct":26},"总承包单位技术负责人",{"key":31,"text":39,"correct":22},{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":31,"analysis":33},1125847,"下列脚手架工程专项施工方案必须进行专家论证的是( )。",[315,317,319,321],{"key":20,"text":316,"correct":22},"高度40m落地式钢管脚手架",{"key":24,"text":318,"correct":22},"提升高度80m附着式整体提升脚手架",{"key":28,"text":320,"correct":22},"提升高度60m附着式分片提升脚手架",{"key":31,"text":322,"correct":26},"架体高度20m及以上悬挑式脚手架",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1125848,"施工单位应当在危险性较大的分部分项工程( )编制专项方案。",[327,329,331,333],{"key":20,"text":328,"correct":22},"确认前",{"key":24,"text":330,"correct":26},"施工前",{"key":28,"text":332,"correct":22},"确认后",{"key":31,"text":334,"correct":22},"测量后",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},1125850,"施工组织设计应经( )审批",[339,340,341,343],{"key":20,"text":92,"correct":22},{"key":24,"text":309,"correct":26},{"key":28,"text":342,"correct":22},"项目总工",{"key":31,"text":75,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},1125851,"不得进入施工现场的“三无”人员中，不含( )人员。",[348,350,352,354],{"key":20,"text":349,"correct":22},"无身份证",{"key":24,"text":351,"correct":22},"无劳动合同",{"key":28,"text":353,"correct":26},"无居住证",{"key":31,"text":355,"correct":22},"无岗位证书",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1125852,"劳务实名制管理形成的资料中，不需要报总包备案的是( )。",[360,362,364,366],{"key":20,"text":361,"correct":22},"劳务人员身份证复印件",{"key":24,"text":363,"correct":26},"继续教育培训档案",{"key":28,"text":365,"correct":22},"劳务人员工资台账",{"key":31,"text":367,"correct":22},"劳务人员考勤、考核表",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1125853,"施工场地进行硬化处理的主要目的是( )。",[372,374,376,378],{"key":20,"text":373,"correct":22},"方便运输",{"key":24,"text":375,"correct":26},"减少扬尘",{"key":28,"text":377,"correct":22},"方便施工",{"key":31,"text":379,"correct":22},"防止积水",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1125854,"施工现场应按照现行国家标准制定降噪措施，并应对施工现场的噪声值进行( )。",[384,386,388,390],{"key":20,"text":385,"correct":22},"记录、分析",{"key":24,"text":387,"correct":22},"记录、统计",{"key":28,"text":389,"correct":22},"记录、研究",{"key":31,"text":391,"correct":26},"监测、记录",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1125855,"不属于施工现场管理内容的是( )。",[396,398,400,402],{"key":20,"text":397,"correct":26},"维持社会交通秩序",{"key":24,"text":399,"correct":22},"施工现场封闭管理",{"key":28,"text":401,"correct":22},"施工总平面设计",{"key":31,"text":403,"correct":22},"合理规划施工用地",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1125856,"施工现场的进口处应有整齐明显的“五牌一图”，其中“一图”是指( )。",[408,410,412,414],{"key":20,"text":409,"correct":22},"设计平面图",{"key":24,"text":411,"correct":26},"施工现场总平面图",{"key":28,"text":413,"correct":22},"施工进度图",{"key":31,"text":415,"correct":22},"交通疏导（方案）图",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},1125857,"施工阶段，应适时对施工现场( )进行调整。",[420,422,424,426],{"key":20,"text":421,"correct":22},"管理目标",{"key":24,"text":423,"correct":22},"用电平面布置",{"key":28,"text":425,"correct":26},"总平面布置",{"key":31,"text":427,"correct":22},"管理体系",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":28,"analysis":33},1125858,"在市区内施工现场的围挡应高于( )，且应符合当地主管部门的有关规定。",[432,434,436,438],{"key":20,"text":433,"correct":22},"1.8m",{"key":24,"text":435,"correct":22},"2.1m",{"key":28,"text":437,"correct":26},"2.5m",{"key":31,"text":439,"correct":22},"2.8m",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1125859,"劳务实名制管理是劳务管理的一项( )工作。",[444,446,448,450],{"key":20,"text":445,"correct":26},"基础",{"key":24,"text":447,"correct":22},"重要",{"key":28,"text":449,"correct":22},"主要",{"key":31,"text":451,"correct":22},"基本",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},1125860,"关于项目部职业健康安全管理的说法，正确的是( )。",[456,458,459,461],{"key":20,"text":457,"correct":22},"项目部职业健康安全目标应直接引用本企业职业健康安全目标",{"key":24,"text":25,"correct":26},{"key":28,"text":460,"correct":22},"策划本项目职业卫生设施可从施工区域内危险部位所设置的防护设施开始考虑",{"key":31,"text":462,"correct":22},"策划本项目生产性辅助设施可从减轻或消除工作中噪声及振动的设施开始考虑",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1125861,"现场存放的油料、化学溶剂等应设有专门的库房，地面应进行( )处理。",[467,469,471,473],{"key":20,"text":468,"correct":22},"硬化",{"key":24,"text":470,"correct":22},"防水",{"key":28,"text":472,"correct":22},"防火",{"key":31,"text":474,"correct":26},"防渗漏",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1125862,"应根据风力和大气湿度的具体情况，进行土方回填、转运作业，沿线应用( )降尘。",[479,481,483,485],{"key":20,"text":480,"correct":26},"洒水车",{"key":24,"text":482,"correct":22},"扫地车",{"key":28,"text":484,"correct":22},"湿麻袋",{"key":31,"text":486,"correct":22},"湿草包",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},1125863,"市政公用工程常常处于城镇区域，必须在施工组织设计中贯彻( )理念。",[491,493,495,497],{"key":20,"text":492,"correct":22},"文明施工",{"key":24,"text":494,"correct":22},"安全施工",{"key":28,"text":496,"correct":26},"绿色施工",{"key":31,"text":498,"correct":22},"环境保护",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1125864,"根据国家有关规定，应当设置明显的安全警示标志的地点是( )。",[503,505,507,509],{"key":20,"text":504,"correct":26},"施工现场入口处",{"key":24,"text":506,"correct":22},"砂石存放区",{"key":28,"text":508,"correct":22},"水泥仓库入口处",{"key":31,"text":510,"correct":22},"生活办公区",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},1125865,"工程施工阶段设置道路、组织排水、搭建临时设施、堆放物料和停放机械设备，应当按照( )布置。",[515,517,519,521],{"key":20,"text":516,"correct":22},"业主指定",{"key":24,"text":518,"correct":22},"现场需要",{"key":28,"text":520,"correct":22},"监理指定",{"key":31,"text":522,"correct":26},"施工总平面图",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},1125866,"项目进度控制总目标可按承包的专业或施工阶段分解为( )分目标。",[527,529,531,533],{"key":20,"text":528,"correct":22},"交工",{"key":24,"text":530,"correct":22},"时间",{"key":28,"text":532,"correct":26},"阶段",{"key":31,"text":534,"correct":22},"专业",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},1125867,"月、旬（或周）施工进度计划是( )性计划。",[539,540,542,544],{"key":20,"text":122,"correct":22},{"key":24,"text":541,"correct":22},"支撑",{"key":28,"text":543,"correct":26},"实施",{"key":31,"text":532,"correct":22},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1125868,"项目有形象进度要求时，项目进度控制总目标可按年、季、月分解为( )分目标。",[549,550,551,552],{"key":20,"text":528,"correct":22},{"key":24,"text":530,"correct":26},{"key":28,"text":532,"correct":22},{"key":31,"text":534,"correct":22},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},1125869,"分包单位施工进度计划应是承包单位施工总进度计划的( )。",[557,558,560,562],{"key":20,"text":445,"correct":22},{"key":24,"text":559,"correct":26},"控制范围",{"key":28,"text":561,"correct":22},"依据",{"key":31,"text":563,"correct":22},"组成部分",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},1125870,"单位工程、分部工程和分项工程开工前，应对承担施工的负责人或分包方全体人员进行书面技术交底，其执行人为项目( )。",[568,570,572,574],{"key":20,"text":569,"correct":22},"负责人",{"key":24,"text":571,"correct":22},"生产负责人",{"key":28,"text":573,"correct":26},"技术负责人",{"key":31,"text":575,"correct":22},"质量负责人",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1125871,"关于特殊过程质量控制的说法，正确的是( )。",[580,582,584,586],{"key":20,"text":581,"correct":22},"对工程施工项目质量计划规定的特殊过程，应设置分部质量控制点",{"key":24,"text":583,"correct":26},"除应执行一般过程控制的规定外，还应由专业技术人员编制专门的作业指导书",{"key":28,"text":585,"correct":22},"缺少经验的工序应安排试验，编制成作业指导书，按需要进行首件（段）验收",{"key":31,"text":587,"correct":22},"编制的作业指导书，应经监理工程师审批后执行",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},1125872,"施工项目部应建立质量责任制和( )办法。",[592,594,596,598],{"key":20,"text":593,"correct":26},"考核评价",{"key":24,"text":595,"correct":22},"质量控制",{"key":28,"text":597,"correct":22},"监督检查",{"key":31,"text":599,"correct":22},"质量管理",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]