[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":585},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,26,50,2846,[13,34,46,58,70,82,94,106,118,126,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,374,386,394,402,410,418,426,438,450,458,470,482,493,501,513,525,537,549,561,573],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1125771,1,"单选题","分包企业签署质量合格的文件上，必须由( )的注册建造师签章。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","分包企业",false,{"key":24,"text":25,"correct":26},"B","担任总包项目负责人",true,{"key":28,"text":29,"correct":22},"C","担任分包企业质量负责人",{"key":31,"text":32,"correct":22},"D","担任总包项目质量负责人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1125772,"建设工程合同包含多个专业工程时，( )负责该工程施工管理文件签章。",[38,40,42,44],{"key":20,"text":39,"correct":26},"担任施工项目负责人的注册建造师",{"key":24,"text":41,"correct":22},"担任施工项目技术负责人的注册建造师",{"key":28,"text":43,"correct":22},"担任施工项目质量负责人的注册建造师",{"key":31,"text":45,"correct":22},"负责施工项目专业工程的注册建造师",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1125773,"市政公用工程注册建造师签章文件表格中施工单位是指( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"某工程施工总公司",{"key":24,"text":53,"correct":26},"某工程项目经理部",{"key":28,"text":55,"correct":22},"某工程施工子公司",{"key":31,"text":57,"correct":22},"某工程施工分公司",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1125774,"城市燃气工程不包括( )的建设与维修。",[62,64,66,68],{"key":20,"text":63,"correct":26},"长输管线",{"key":24,"text":65,"correct":22},"管道及其附属设施",{"key":28,"text":67,"correct":22},"调压站",{"key":31,"text":69,"correct":22},"气源",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1125775,"依附于城市道路的各种管线、杆线等设施的建设，应坚持( )。",[74,76,78,80],{"key":20,"text":75,"correct":26},"先地下、后地上的施工原则，与城市道路同步建设",{"key":24,"text":77,"correct":22},"先地下、后地上的施工原则，与城市道路异步建设",{"key":28,"text":79,"correct":22},"先地上、后地下的施工原则，与城市道路同步建设",{"key":31,"text":81,"correct":22},"先地上、后地下的施工原则，与城市道路异步建设",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1125776,"任何单位，必须经公安交通管理部门和( )的批准，才能按规定占用和挖掘城市道路。",[86,88,90,92],{"key":20,"text":87,"correct":22},"当地建设管理部门",{"key":24,"text":89,"correct":26},"市政工程行政主管部门",{"key":28,"text":91,"correct":22},"市政工程养护部门",{"key":31,"text":93,"correct":22},"当地建设行政主管部门",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1125777,"在砍伐树木前，必须经( )部门批准，并按国家有关规定补植树木。",[98,100,102,104],{"key":20,"text":99,"correct":22},"城市环境保护行政主管",{"key":24,"text":101,"correct":22},"当地建设行政主管",{"key":28,"text":103,"correct":26},"城市绿化行政主管",{"key":31,"text":105,"correct":22},"当地规划行政主管",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1125778,"砍伐城市树木，必须经城市人民政府( )部门批准，并按规定补植或采取补救措施。",[110,112,114,116],{"key":20,"text":111,"correct":26},"绿化行政主管",{"key":24,"text":113,"correct":22},"绿化规划",{"key":28,"text":115,"correct":22},"园林绿化",{"key":31,"text":117,"correct":22},"绿化管理",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1125779,"因建设或其他原因需要临时占用城市绿化用地时，须经城市人民政府( )部门批准，办理临时用地手续。",[122,123,124,125],{"key":20,"text":113,"correct":22},{"key":24,"text":115,"correct":22},{"key":28,"text":117,"correct":22},{"key":31,"text":111,"correct":26},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":28,"analysis":33},1125780,"任何单位和个人都不得擅自改变城市( )的性质。",[130,132,134,136],{"key":20,"text":131,"correct":22},"绿化用地",{"key":24,"text":133,"correct":22},"绿化",{"key":28,"text":135,"correct":26},"绿化规划用地",{"key":31,"text":137,"correct":22},"绿化设施",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},1125781,"热拌沥青混合料路面应待摊铺层自然降温至表面温度低于( )℃后，方可开放交通。",[142,144,146,148],{"key":20,"text":143,"correct":26},"50",{"key":24,"text":145,"correct":22},"55",{"key":28,"text":147,"correct":22},"60",{"key":31,"text":149,"correct":22},"65",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},1125782,"下列关于城镇道路施工分项工程验收的说法中，最规范的是( )。",[154,156,158,160],{"key":20,"text":155,"correct":22},"前一分项工程未经检验，后一分项工程不可施工",{"key":24,"text":157,"correct":22},"前一分项工程未经检验，后一分项工程不宜施工",{"key":28,"text":159,"correct":22},"前一分项工程未经检验，后一分项工程不应施工",{"key":31,"text":161,"correct":26},"前一分项工程未经验收合格严禁进行后一分项工程施工",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},1125783,"水泥混凝土路面在面层混凝土( )，不得开放交通。",[166,168,170,172],{"key":20,"text":167,"correct":22},"弯拉强度达到设计强度前",{"key":24,"text":169,"correct":22},"填缝完成前",{"key":28,"text":171,"correct":26},"弯拉强度达到设计强度，且填缝完成前",{"key":31,"text":173,"correct":22},"抗压强度达到设计强度，且填缝完成前",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1125784,"下列关于桥梁工程施工质量验收要求，正确的是( )。",[178,180,182,184],{"key":20,"text":179,"correct":22},"工程外观质量应由验收人员现场确认",{"key":24,"text":181,"correct":26},"检验批的质量应按主控项目和一般项目进行验收",{"key":28,"text":183,"correct":22},"隐蔽工程应由相关单位进行隐蔽验收，确认合格后，形成隐蔽验收文件",{"key":31,"text":185,"correct":22},"对涉及结构安全和使用功能的分部工程应进行100%检测",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},1125785,"下列关于桥梁工程施工质量验收要求，错误的是( )。",[190,192,194,196],{"key":20,"text":191,"correct":26},"参加工程施工质量验收的各方人员应具有丰富的施工实践经验",{"key":24,"text":193,"correct":22},"工程质量的验收均应在施工单位自行检查评定的基础上进行",{"key":28,"text":195,"correct":22},"承担见证取样检测及有关结构安全检测的单位应具有相应的资质",{"key":31,"text":197,"correct":22},"监理应按规定对涉及结构安全的试块、试件、有关材料和现场检测项目，进行平行检测、见证取样检测并确认合格",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},1125786,"下列关于城市桥梁施工过程中分项工程质量控制的说法，错误的是( )。",[202,204,206,208],{"key":20,"text":203,"correct":22},"各分项工程应按《城市桥梁工程施工与质量验收规范》进行质量控制",{"key":24,"text":205,"correct":26},"各分项工程进行自检、交接检验合格后，即可进行下一个分项工程施工",{"key":28,"text":207,"correct":22},"各分项工程自检、交接检验合格后应形成文件",{"key":31,"text":209,"correct":22},"自检、交接检验文件经监理工程师检查签认后，方可进行下一个分项工程施工",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},1125787,"隧道施工中，不用进行监测、反馈信息以指导隧道掘进的项目是( )。",[214,216,218,220],{"key":20,"text":215,"correct":22},"地面动态",{"key":24,"text":217,"correct":22},"地层动态",{"key":28,"text":219,"correct":22},"支护结构动态",{"key":31,"text":221,"correct":26},"隧道内空气质量",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1125788,"隧道采用钻爆法施工时，必须事先编制爆破方案，报( )后方可实施。",[226,228,230,232],{"key":20,"text":227,"correct":22},"城市主管部门批准",{"key":24,"text":229,"correct":22},"公安部门同意",{"key":28,"text":231,"correct":26},"城市主管部门批准，并经公安部门同意",{"key":31,"text":233,"correct":22},"公安部门批准，并经城市主管部门同意",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},1125789,"根据《地下铁道工程施工及验收规范》的有关规定，隧道采用钻爆法施工时，必须事先编制爆破方案，在实施前还需履行的程序是( )。",[238,240,242,244],{"key":20,"text":239,"correct":22},"报业主批准，并经城市主管部门同意",{"key":24,"text":241,"correct":22},"报监理批准，并经公安部门同意",{"key":28,"text":243,"correct":22},"报上级公司批准，并经城市主管部门同意",{"key":31,"text":245,"correct":26},"报城市主管部门批准，并经公安部门同意",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1125790,"给水构筑物工程中所用的接触饮用水的产品必须符合有关( )性能要求。",[250,252,254,256],{"key":20,"text":251,"correct":26},"卫生",{"key":24,"text":253,"correct":22},"物理",{"key":28,"text":255,"correct":22},"化学",{"key":31,"text":257,"correct":22},"力学",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1125791,"压力管道水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于( )。",[262,264,266,268],{"key":20,"text":263,"correct":26},"0.5m",{"key":24,"text":265,"correct":22},"0.4m",{"key":28,"text":267,"correct":22},"0.3m",{"key":31,"text":269,"correct":22},"0.2m",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1125792,"对不同级别、不同熔体流动速率的聚乙烯原料制造的管材或管件，不同标准尺寸比（SDR值）的聚乙烯燃气管道连接时，必须采用( )连接。",[274,276,278,280],{"key":20,"text":275,"correct":26},"电熔",{"key":24,"text":277,"correct":22},"热熔",{"key":28,"text":279,"correct":22},"卡箍",{"key":31,"text":281,"correct":22},"法兰",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},1125793,"下列聚乙烯燃气管道中，非必须采用电熔连接的是( )。",[286,288,290,292],{"key":20,"text":287,"correct":22},"不同级别的聚乙烯原料制造的管材或管件",{"key":24,"text":289,"correct":22},"不同熔体流动速率的聚乙烯原料制造的管材或管件",{"key":28,"text":291,"correct":22},"不同标准尺寸比（SDR值）的聚乙烯燃气管道",{"key":31,"text":293,"correct":26},"直径90mm以上的聚乙烯燃气管材或管件",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},1125794,"承担燃气钢质管道、设备焊接的人员，不能上岗的条件是( )。",[298,300,302,304],{"key":20,"text":299,"correct":22},"具有锅炉压力容器、压力管道特种设备操作人员资格证（焊接）焊工合格证书",{"key":24,"text":301,"correct":22},"焊接范围在证书注明的合格范围内",{"key":28,"text":303,"correct":22},"证书在有效期内",{"key":31,"text":305,"correct":26},"间断焊接时间超过6个月",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1125795,"燃气管道的安装人员必须经过培训并考试合格，当间断安装时间超过( )，再次上岗前应重新考试和进行技术评定。",[310,312,314,316],{"key":20,"text":311,"correct":22},"3个月",{"key":24,"text":313,"correct":26},"6个月",{"key":28,"text":315,"correct":22},"12个月",{"key":31,"text":317,"correct":22},"18个月",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1125796,"关于聚乙烯燃气管道连接的说法，错误的是( )。",[322,324,326,328],{"key":20,"text":323,"correct":26},"不同标准尺寸比（SDR值）的材料，应使用热熔连接",{"key":24,"text":325,"correct":22},"不同级别材料，必须使用电熔连接",{"key":28,"text":327,"correct":22},"施工前应进行试验",{"key":31,"text":329,"correct":22},"在热熔连接组对前，应清除表皮的氧化层",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1125797,"基坑工程的现场监测应采取（）的方法。",[334,336,338,340],{"key":20,"text":335,"correct":26},"仪器监测与巡视检查相结合",{"key":24,"text":337,"correct":22},"仪器监测",{"key":28,"text":339,"correct":22},"巡视检查",{"key":31,"text":341,"correct":22},"监理巡视",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1125798,"下列关于水准测量主要技术要求的说法，错误的是（）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"水准测量的最高等级是Ⅱ等",{"key":24,"text":349,"correct":26},"各等级附合或环线水准测量的观测次数均为往返各一次",{"key":28,"text":351,"correct":22},"结点之间或结点与高级点之间,其路线的长度，不应大于表中规定的0.7倍",{"key":31,"text":353,"correct":22},"数字水准仪测量的技术要求和同等级的光学水准仪相同",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1125799,"明挖法施工中，下列（）均属于工程监测等级为一级、二级、三级应测项目",[358,360,362,364],{"key":20,"text":359,"correct":22},"立体结构竖向偏移",{"key":24,"text":361,"correct":22},"立体结构应力",{"key":28,"text":363,"correct":26},"支撑轴力",{"key":31,"text":365,"correct":22},"土钉拉力",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},1125800,"因建设或其他原因需要临时占用城市绿化用地时，须经城市人民政府（）部门批准，办理临时用地手续。",[370,371,372,373],{"key":20,"text":113,"correct":22},{"key":24,"text":115,"correct":22},{"key":28,"text":117,"correct":22},{"key":31,"text":111,"correct":26},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},1125801,"根据《城市桥梁工程施工与质量验收规范》(CJJ2—2008)的有关规定，对涉及结构安全和使用功能的分部工程应进行（）检测。",[378,380,382,384],{"key":20,"text":379,"correct":22},"见证取样",{"key":24,"text":381,"correct":26},"抽样",{"key":28,"text":383,"correct":22},"巡视",{"key":31,"text":385,"correct":22},"平行",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},1125802,"建设工程合同包含多个专业工程时，（ ）负责该工程施工管理文件签章。",[390,391,392,393],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1125803,"市政公用工程注册建造师签章文件表格中施工单位是指（ ）。",[398,399,400,401],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":57,"correct":22},{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},1125804,"城市燃气工程不包括（）的建设与维修。",[406,407,408,409],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},1125805,"任何单位和个人都不得擅自改变城市（ ）的性质。",[414,415,416,417],{"key":20,"text":131,"correct":22},{"key":24,"text":133,"correct":22},{"key":28,"text":135,"correct":26},{"key":31,"text":137,"correct":22},{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1125806,"砍伐城市树木，必须经城市人民政府（）部门批准，并按规定补植或采取补救措施。",[422,423,424,425],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":22},{"key":28,"text":115,"correct":22},{"key":31,"text":117,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1125807,"《城镇道路工程施工与质量验收规范》(CJJ1—2008)规定，水泥混凝土路面在面层混凝土（ ）强度达到设计强度且填缝完成前不得开放交通。",[430,432,434,436],{"key":20,"text":431,"correct":22},"抗拉",{"key":24,"text":433,"correct":22},"抗压",{"key":28,"text":435,"correct":26},"弯拉",{"key":31,"text":437,"correct":22},"抗剪",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1125808,"《城市桥梁工程施工与质量验收规范》(CJJ2—2008)规定，隐蔽工程在隐蔽前，应由（ ）单位通知监理工程师和相关单位进行隐蔽验收，确认合格后，形成隐蔽验收文件。",[442,444,446,448],{"key":20,"text":443,"correct":26},"施工",{"key":24,"text":445,"correct":22},"设计",{"key":28,"text":447,"correct":22},"勘察",{"key":31,"text":449,"correct":22},"建设",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1125809,"给水构筑物工程中所用的接触饮用水的产品必须符合有关（ ）性能要求。",[454,455,456,457],{"key":20,"text":251,"correct":26},{"key":24,"text":253,"correct":22},{"key":28,"text":255,"correct":22},{"key":31,"text":257,"correct":22},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":28,"analysis":33},1125810,"市政公用工程专业二级注册建造师可以承接单项工程合同额3000万元以下的轻轨交通工程，但不包括（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"路基工程",{"key":24,"text":465,"correct":22},"桥涵工程",{"key":28,"text":467,"correct":26},"轨道铺设",{"key":31,"text":469,"correct":22},"地上车站",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1125811,"填写市政公用工程注册建造师施工管理签章文件时，表格中的施工项目负责人指的是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"受聘于企业担任施工项目负责人的注册建造师",{"key":24,"text":477,"correct":22},"该项目的施工技术负责人",{"key":28,"text":479,"correct":22},"受聘于企业担任质量监督的人员",{"key":31,"text":481,"correct":22},"该项目中的担任施工安全管理的注册建造师",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1125812,"城市供热工程不包括（）的建设与维修。",[486,488,489,491],{"key":20,"text":487,"correct":22},"热源",{"key":24,"text":65,"correct":22},{"key":28,"text":490,"correct":22},"储备场站",{"key":31,"text":492,"correct":26},"采暖工程",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1125813,"分包企业签署质量合格的文件上，必须由（ ）的注册建造师签章。",[497,498,499,500],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1125814,"某市政工程估价为5000万元招标人可要求每个投标人提供保证金最高额为()。",[505,507,509,511],{"key":20,"text":506,"correct":22},"100万元",{"key":24,"text":508,"correct":26},"50万元",{"key":28,"text":510,"correct":22},"60万元",{"key":31,"text":512,"correct":22},"40万元",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":28,"analysis":33},1125815,"技术标书的编制依据应该以()为标准。",[517,519,521,523],{"key":20,"text":518,"correct":22},"施工图纸",{"key":24,"text":520,"correct":22},"技术规范",{"key":28,"text":522,"correct":26},"技术评分",{"key":31,"text":524,"correct":22},"评标办法",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},1125816,"根据《必须招标的工程项目规定》(中华人民共和国国家发展改革委员会令第16号，从2018年6月1日起凡项目施工单项合同估算大于()万元的必须进行招标。",[529,531,533,535],{"key":20,"text":530,"correct":26},"400",{"key":24,"text":532,"correct":22},"300",{"key":28,"text":534,"correct":22},"200",{"key":31,"text":536,"correct":22},"100",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},1125817,"宜采用邀请招标的充足条件是（）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"招标人已依法成立",{"key":24,"text":544,"correct":22},"初步设计及概算已获批",{"key":28,"text":546,"correct":22},"招标范围、方法、在投新形式等已经核准",{"key":31,"text":548,"correct":26},"只有少数几家潜在投标人可供选择的",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":28,"analysis":33},1125818,"投标人应当按照()的要求编制投标文件。",[553,555,557,559],{"key":20,"text":554,"correct":22},"招标人",{"key":24,"text":556,"correct":22},"招标代理",{"key":28,"text":558,"correct":26},"招标文件",{"key":31,"text":560,"correct":22},"投标文件格式",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1125819,"投标人不需响应招标文件对投标人资格条件的要求是()。",[565,567,569,571],{"key":20,"text":566,"correct":26},"所有制",{"key":24,"text":568,"correct":22},"项目负责人资格",{"key":28,"text":570,"correct":22},"财务状况",{"key":31,"text":572,"correct":22},"经营范围",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},1125820,"有效控制工程造价就是要做到()。",[577,579,581,583],{"key":20,"text":578,"correct":26},"投资估算>设计概算>施工图预算>竣工结算",{"key":24,"text":580,"correct":22},"设计概算>投资估算>施工图预算>竣工结算",{"key":28,"text":582,"correct":22},"竣工结算>施工图预算>设计概算>投资估算",{"key":31,"text":584,"correct":22},"投资估算>施工图预算>设计概算>竣工结算",[586,589,592,595,598,601],{"id":15,"name":587,"category":7,"favorite":588},"领导干部任职前廉政法规知识测试题",92,{"id":590,"name":591,"category":7,"favorite":15},595,"建筑结构与设备",{"id":593,"name":594,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":596,"name":597,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":599,"name":600,"category":7,"favorite":8},534,"BIM工程师",{"id":602,"name":600,"category":7,"favorite":8},535]