[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,22,50,2846,[13,34,46,58,70,82,94,102,114,126,138,150,162,173,185,197,209,219,231,243,254,266,278,290,302,314,326,338,347,359,371,383,395,407,419,428,440,452,463,475,487,499,511,523,535,546,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1125571,1,"单选题","填埋库区与敞开式渗沥液处理区边界距居民居住区或人畜供水点的卫生防护距离应大于等于( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","2000m",false,{"key":24,"text":25,"correct":22},"B","1500m",{"key":27,"text":28,"correct":22},"C","1000m",{"key":30,"text":31,"correct":32},"D","500m",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1125572,"泥质防水层施工流程中，土样现场摊铺和压实的紧后工序是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"分层施工同步检验",{"key":24,"text":41,"correct":22},"验收场地基础",{"key":27,"text":43,"correct":22},"土样渗水试验",{"key":30,"text":45,"correct":22},"选择抗渗达标又经济的施工配合比",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1125573,"HDPE膜不得在（）季施工。",[50,52,54,56],{"key":20,"text":51,"correct":22},"春",{"key":24,"text":53,"correct":22},"夏",{"key":27,"text":55,"correct":22},"秋",{"key":30,"text":57,"correct":32},"冬",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1125574,"现场到货36000m2HDPE膜，材料质量抽样检验应分（）批进行。",[62,64,66,68],{"key":20,"text":63,"correct":22},"2",{"key":24,"text":65,"correct":22},"3",{"key":27,"text":67,"correct":32},"4",{"key":30,"text":69,"correct":22},"5",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1125575,"垃圾填埋场泥质防水技术的核心是（ ）施工技术。",[74,76,78,80],{"key":20,"text":75,"correct":22},"选择原材料配合比",{"key":24,"text":77,"correct":22},"严格控制压实度",{"key":27,"text":79,"correct":32},"掺加膨润土的拌合土层",{"key":30,"text":81,"correct":22},"分层压实",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1125576,"在HDPE膜焊缝上涂肥皂水，检测焊缝有无泄漏的方法是（）检测法。",[86,88,90,92],{"key":20,"text":87,"correct":22},"气压",{"key":24,"text":89,"correct":22},"电火花",{"key":27,"text":91,"correct":32},"真空",{"key":30,"text":93,"correct":22},"拉力",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1125577,"生活垃圾填埋场与居民区的最短距离应为（）。",[98,99,100,101],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":32},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},1125578,"填土(方)路基，填方段内应事先找平，当地面坡度陡于( )时，需修成台阶形式。",[106,108,110,112],{"key":20,"text":107,"correct":22},"1:4",{"key":24,"text":109,"correct":22},"1:6",{"key":27,"text":111,"correct":32},"1:5",{"key":30,"text":113,"correct":22},"1:3",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},1125579,"某道路填方路基含一座φ1000管涵，局部原地面坡度达1：4，合适的施工方法是( )。",[118,120,122,124],{"key":20,"text":119,"correct":32},"地面坡度1:4处修筑台阶",{"key":24,"text":121,"correct":22},"当填土达一定长度(100m)时，只检查平整度合格后即开始碾压",{"key":27,"text":123,"correct":22},"在管涵处，待其顶面覆土达200mm时，用压路机碾压",{"key":30,"text":125,"correct":22},"路基填筑最后的碾压选用8t级压路机",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},1125580,"路基工程地下管线的施工应遵循( )的原则。",[130,132,134,136],{"key":20,"text":131,"correct":22},"先地上再地下先浅后深",{"key":24,"text":133,"correct":32},"先地下再地上先深后浅",{"key":27,"text":135,"correct":22},"先地上再地下先深后浅",{"key":30,"text":137,"correct":22},"先地下在地上先浅后深",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":30,"analysis":33},1125581,"路基工程中，地下管线施工必须依照( )的原则进行。",[142,144,146,148],{"key":20,"text":143,"correct":22},"先地下，后地上，先浅后深",{"key":24,"text":145,"correct":22},"先地上，后地下，先深后浅",{"key":27,"text":147,"correct":22},"先地上，后地下，先浅后深",{"key":30,"text":149,"correct":32},"先地下，后地上，先深后浅",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},1125582,"路基施工程序是准备工作、( )、路基（土、石方）施工、质量检查与验收等。",[154,156,158,160],{"key":20,"text":155,"correct":32},"修建附属构筑物",{"key":24,"text":157,"correct":22},"路基施工测量",{"key":27,"text":159,"correct":22},"排除地面积水",{"key":30,"text":161,"correct":22},"清除地表腐殖土",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":30,"analysis":33},1125583,"填方路基应事先找平，当地面坡度陡于( )时，需修成台阶形式。",[166,168,170,172],{"key":20,"text":167,"correct":22},"1:10",{"key":24,"text":169,"correct":22},"1:8",{"key":27,"text":171,"correct":22},"1:7",{"key":30,"text":111,"correct":32},{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1125584,"填方路段太陡，事先找平修成台阶形式时，每层台阶宽度不宜小于( )m。",[177,179,181,183],{"key":20,"text":178,"correct":32},"1",{"key":24,"text":180,"correct":22},"0.8",{"key":27,"text":182,"correct":22},"0.7",{"key":30,"text":184,"correct":22},"0.6",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":30,"analysis":33},1125585,"填方路基在碾压时应先轻后重，最后碾压机械应为不小于( )级的压路机。",[189,191,193,195],{"key":20,"text":190,"correct":22},"6t",{"key":24,"text":192,"correct":22},"8t",{"key":27,"text":194,"correct":22},"10t",{"key":30,"text":196,"correct":32},"12t",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":24,"analysis":33},1125586,"城镇道路路基填料可用（）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"沼泽土",{"key":24,"text":204,"correct":32},"砾石土",{"key":27,"text":206,"correct":22},"泥炭土",{"key":30,"text":208,"correct":22},"有机土",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":20,"analysis":33},1125587,"城镇主干路土路基填料的CBR值应符合设计要求，其路床顶面0-300mm以下强度最小值应为( )%。",[213,215,217,218],{"key":20,"text":214,"correct":32},"8",{"key":24,"text":216,"correct":22},"6",{"key":27,"text":69,"correct":22},{"key":30,"text":67,"correct":22},{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1125588,"下列城镇道路路基施工质量验收项目中，属于主控项目的是( )。",[223,225,227,229],{"key":20,"text":224,"correct":22},"平整度",{"key":24,"text":226,"correct":32},"压实度",{"key":27,"text":228,"correct":22},"路堤边坡",{"key":30,"text":230,"correct":22},"宽度",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":30,"analysis":33},1125589,"土路基填土宽度应比设计宽度宽( )。",[235,237,239,241],{"key":20,"text":236,"correct":22},"200mm",{"key":24,"text":238,"correct":22},"300mm",{"key":27,"text":240,"correct":22},"400mm",{"key":30,"text":242,"correct":32},"500mm",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1125590,"土路基质量检查与验收的主控项目是（）。",[247,249,250,252],{"key":20,"text":248,"correct":32},"弯沉值",{"key":24,"text":224,"correct":22},{"key":27,"text":251,"correct":22},"中线偏位",{"key":30,"text":253,"correct":22},"路基宽度",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},1125591,"下列原则中，不属于土质路基压实原则的是( )。",[258,260,262,264],{"key":20,"text":259,"correct":22},"先低后高",{"key":24,"text":261,"correct":32},"先快后慢",{"key":27,"text":263,"correct":22},"先轻后重",{"key":30,"text":265,"correct":22},"先静后振",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},1125592,"某新建道路，全线经过农田，腐殖土厚度0.3m，该道路地表土属于( )。",[270,272,274,276],{"key":20,"text":271,"correct":32},"一类土（松软土）",{"key":24,"text":273,"correct":22},"二类土（普通土）",{"key":27,"text":275,"correct":22},"三类土（坚土）",{"key":30,"text":277,"correct":22},"四类土（砂砾坚土）",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":30,"analysis":33},1125593,"工程用土按坚实系数分类，一类土的坚实系数为（）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"1.0~1.5",{"key":24,"text":285,"correct":22},"0.8~1.0",{"key":27,"text":287,"correct":22},"0.6~0.8",{"key":30,"text":289,"correct":32},"0.5~0.6",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1125594,"某城市新建主干路经过一处淤泥深1.2m水塘，路基施工时，对淤泥应用( )处理。",[294,296,298,300],{"key":20,"text":295,"correct":22},"强夯法",{"key":24,"text":297,"correct":32},"换填法",{"key":27,"text":299,"correct":22},"排水固结法",{"key":30,"text":301,"correct":22},"堆载预压法",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1125595,"土中放入抗拉强度高的补强材料形成复合路基以加强和改善路基土的剪切特性，这种加固处理方法属于( )。",[306,308,310,312],{"key":20,"text":307,"correct":32},"土的补强",{"key":24,"text":309,"correct":22},"置换法",{"key":27,"text":311,"correct":22},"挤密法",{"key":30,"text":313,"correct":22},"土质改良",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},1125596,"路基土液限指数IL=0，则该土属于（）状态。",[318,320,322,324],{"key":20,"text":319,"correct":22},"流塑",{"key":24,"text":321,"correct":22},"软塑",{"key":27,"text":323,"correct":32},"硬塑",{"key":30,"text":325,"correct":22},"半坚硬",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},1125597,"土的含水量是指（）。",[330,332,334,336],{"key":20,"text":331,"correct":32},"土中水的质量与干土粒质量之比",{"key":24,"text":333,"correct":22},"土中水的质量与湿土粒质量之比",{"key":27,"text":335,"correct":22},"土中水的质量与干土粒表现密度之比",{"key":30,"text":337,"correct":22},"土中水的质量与湿土粒密度之比",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1125598,"为保证湿陷性黄土路基的稳定，宜采取的加固措施是( )。",[342,344,345,346],{"key":20,"text":343,"correct":32},"振密挤密",{"key":24,"text":297,"correct":22},{"key":27,"text":299,"correct":22},{"key":30,"text":301,"correct":22},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},1125599,"路基施工常以机械施工为主，人工配合为辅，采用( )或分段平行作业。",[351,353,355,357],{"key":20,"text":352,"correct":22},"集中",{"key":24,"text":354,"correct":22},"点面结合",{"key":27,"text":356,"correct":32},"流水",{"key":30,"text":358,"correct":22},"轮流",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},1125600,"石灰稳定土宜在春末和气温较高的季节施工，养护温度低于( )时强度几乎不增长。",[363,365,367,369],{"key":20,"text":364,"correct":22},"4℃",{"key":24,"text":366,"correct":32},"5℃",{"key":27,"text":368,"correct":22},"6℃",{"key":30,"text":370,"correct":22},"8℃",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":27,"analysis":33},1125601,"下列无机结合料中能用作高级路面基层的是( )。",[375,377,379,381],{"key":20,"text":376,"correct":22},"石灰土",{"key":24,"text":378,"correct":22},"水泥土",{"key":27,"text":380,"correct":32},"二灰稳定粒料",{"key":30,"text":382,"correct":22},"二灰土",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":20,"analysis":33},1125602,"水泥稳定土、石灰土、工业废渣稳定土基层施工技术中具有相同要求的有( )",[387,389,391,393],{"key":20,"text":388,"correct":32},"具有良好的板体性",{"key":24,"text":390,"correct":22},"初期强度一致",{"key":27,"text":392,"correct":22},"水稳性的程度一致",{"key":30,"text":394,"correct":22},"抗冻性的程度一致",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},1125603,"下列关于水泥稳定土基层的说法中，错误的是( )。",[399,401,403,405],{"key":20,"text":400,"correct":22},"有良好的板体性",{"key":24,"text":402,"correct":32},"初期强度比石灰土低",{"key":27,"text":404,"correct":22},"低温时会冷缩",{"key":30,"text":406,"correct":22},"水稳性比石灰土好",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1125604,"在粉碎的或原状松散的土中，按配合比要求掺入一定量的水泥和水拌合而成的混合料，被称为（）",[411,413,415,417],{"key":20,"text":412,"correct":32},"水泥稳定土（或水泥稳定粒料）",{"key":24,"text":414,"correct":22},"贫混凝土",{"key":27,"text":416,"correct":22},"水泥粒料",{"key":30,"text":418,"correct":22},"水泥混合粒料",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":27,"analysis":33},1125605,"水泥稳定土施工，宜在春末和气温较高的季节。施工期的日最低气温应在( )以上。",[423,425,426,427],{"key":20,"text":424,"correct":22},"3℃",{"key":24,"text":364,"correct":22},{"key":27,"text":366,"correct":32},{"key":30,"text":368,"correct":22},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":27,"analysis":33},1125606,"道路无机结合料稳定基层中，二灰稳定土的（）高于石灰土。",[432,434,436,438],{"key":20,"text":433,"correct":22},"板体性",{"key":24,"text":435,"correct":22},"早期强度",{"key":27,"text":437,"correct":32},"抗冻性",{"key":30,"text":439,"correct":22},"干缩性",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":30,"analysis":33},1125607,"关于二灰稳定土的说法，正确的是( )。",[444,446,448,450],{"key":20,"text":445,"correct":22},"抗冻性能比石灰土低",{"key":24,"text":447,"correct":22},"粉煤灰用量越多早期强度越高",{"key":27,"text":449,"correct":22},"收缩性大于水泥土和石灰土",{"key":30,"text":451,"correct":32},"被禁止用于高等级路面的基层",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},1125608,"石灰稳定土基层施工期间的日最低气温为( )。",[456,458,459,461],{"key":20,"text":457,"correct":22},"0℃",{"key":24,"text":366,"correct":32},{"key":27,"text":460,"correct":22},"10℃",{"key":30,"text":462,"correct":22},"15℃",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1125609,"级配砾石基层采用沥青乳液进行养护时，养护期为（）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"7d以内",{"key":24,"text":470,"correct":32},"7～14d",{"key":27,"text":472,"correct":22},"14～28d",{"key":30,"text":474,"correct":22},"28d以上",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":27,"analysis":33},1125610,"下面关于水泥稳定土说法错误的是( )。",[479,481,483,485],{"key":20,"text":480,"correct":22},"宜在春末和气温较高季节施工，施工期的日最低气温应在5°C以上",{"key":24,"text":482,"correct":22},"下雨时停止施工，已摊铺的水泥稳定土结构层应尽快碾压密实",{"key":27,"text":484,"correct":32},"应在混合料处于最佳含水量+5%时进行碾压",{"key":30,"text":486,"correct":22},"压实成活后立即洒水养护，保持湿润",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1125611,"路基土压实操作中，土的含水量达到( )时，压实效果最好。",[491,493,495,497],{"key":20,"text":492,"correct":22},"液性界限",{"key":24,"text":494,"correct":32},"最佳含水量",{"key":27,"text":496,"correct":22},"饱和含水量",{"key":30,"text":498,"correct":22},"塑性界限",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1125612,"在道路小半径曲线超高路段，正确的路基碾压方式是( )。",[503,505,507,509],{"key":20,"text":504,"correct":32},"由内侧向外侧",{"key":24,"text":506,"correct":22},"由外侧向内侧",{"key":27,"text":508,"correct":22},"由中心向两边",{"key":30,"text":510,"correct":22},"由两边向中心",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},1125613,"二灰混合料拌合顺序是( )。",[515,517,519,521],{"key":20,"text":516,"correct":22},"先将石灰、粉煤灰、砾（碎石）拌合均匀，再加入水均匀拌合",{"key":24,"text":518,"correct":32},"先将石灰、粉煤灰拌合均匀，再加入砂砾（碎石）和水均匀拌合",{"key":27,"text":520,"correct":22},"先将砂砾（碎石）、石灰拌合均匀，再加入粉煤灰和水均匀拌合",{"key":30,"text":522,"correct":22},"先将砂砾（碎石）、粉煤灰拌合均匀，再加入石灰和水均匀拌合",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":30,"analysis":33},1125614,"常温季节，石灰土基层需洒水养护( )，养护期应封闭交通。",[527,529,531,533],{"key":20,"text":528,"correct":22},"28d",{"key":24,"text":530,"correct":22},"21d",{"key":27,"text":532,"correct":22},"14d",{"key":30,"text":534,"correct":32},"直至上层结构施工为止",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1125615,"为压实石灰土、水泥土、石灰粉煤灰砂砾基层，必须掌握的一个关键因素是( )。",[539,540,542,544],{"key":20,"text":494,"correct":32},{"key":24,"text":541,"correct":22},"湿密度",{"key":27,"text":543,"correct":22},"天然含水量",{"key":30,"text":545,"correct":22},"压实密度",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":30,"analysis":33},1125616,"关于级配碎石基层，下列说法中不正确的是( )。",[550,552,554,556],{"key":20,"text":551,"correct":22},"碎石颗粒级配组成曲线是顺滑曲线",{"key":24,"text":553,"correct":22},"应拌合均匀，没有粗细颗粒离析现象",{"key":27,"text":555,"correct":22},"未洒透层沥青或未铺封层时，禁止开放交通",{"key":30,"text":557,"correct":32},"应用15t以上压路机碾压，压实厚度可超过200mm",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":27,"analysis":33},1125617,"在沥青混凝土面层与水泥混凝土路面之间洒布的沥青材料薄层，称为( )。",[562,564,566,568],{"key":20,"text":563,"correct":22},"透层",{"key":24,"text":565,"correct":22},"封层",{"key":27,"text":567,"correct":32},"粘层",{"key":30,"text":569,"correct":22},"复合层",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1125618,"为保证土工合成材料的整体性，应采用搭接法连接，搭接长度宜为( )m。",[574,576,578,580],{"key":20,"text":575,"correct":22},"0.1～0.6",{"key":24,"text":577,"correct":32},"0.3～0.9",{"key":27,"text":579,"correct":22},"0.3～1.0",{"key":30,"text":581,"correct":22},"0.5～1.2",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":30,"analysis":33},1125619,"垫隔土工布加固地基时，当采用缝接法连接，粘接宽度不小于（）mm。",[586,588,590,592],{"key":20,"text":587,"correct":22},"35",{"key":24,"text":589,"correct":22},"40",{"key":27,"text":591,"correct":22},"45",{"key":30,"text":593,"correct":32},"50",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":27,"analysis":33},1125620,"关于垫隔土工布加固地基的说法，错误的是( )。",[598,600,602,604],{"key":20,"text":599,"correct":22},"在软基上垫隔土工布可使荷载分布均匀",{"key":24,"text":601,"correct":22},"所选土工布技术参数应满足设计要求",{"key":27,"text":603,"correct":32},"采用缝接法连接土工布时，粘结强度不高于土工布的抗拉强度",{"key":30,"text":605,"correct":22},"铺设质量应符合规范要求",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]