[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,2,50,2846,[13,34,44,55,67,79,88,100,112,124,135,147,159,171,183,191,203,215,227,239,248,257,269,281,293,305,317,329,341,353,365,377,389,400,412,422,434,446,458,470,480,492,504,516,528,540,548,560,572,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1124516,1,"单选题","泥浆护壁施工期间护筒内的泥浆面应高出地下水位（ ）m以上。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","0.5",false,{"key":24,"text":25,"correct":22},"B","1",{"key":27,"text":28,"correct":22},"C","1.5",{"key":30,"text":31,"correct":32},"D","2",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1124517,"预应力混凝土梁、板的存放时间不宜超过（ ）个月，特殊情况下不应超过5个月。",[38,39,40,42],{"key":20,"text":25,"correct":22},{"key":24,"text":31,"correct":22},{"key":27,"text":41,"correct":32},"3",{"key":30,"text":43,"correct":22},"4",{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":27,"analysis":33},1124518,"架桥机过孔时，其抗倾覆系数应不小于（ ）。",[48,50,52,53],{"key":20,"text":49,"correct":22},"1.0",{"key":24,"text":51,"correct":22},"1.3",{"key":27,"text":28,"correct":32},{"key":30,"text":54,"correct":22},"1.8",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":30,"analysis":33},1124519,"预应力混凝土构件吊装时，其孔道水泥浆的强度不应低于构件的设计要求，如设计无要求，一般不低于（ ）MPa。",[59,61,63,65],{"key":20,"text":60,"correct":22},"10",{"key":24,"text":62,"correct":22},"20",{"key":27,"text":64,"correct":22},"25",{"key":30,"text":66,"correct":32},"30",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":27,"analysis":33},1124520,"存放台座应坚固稳定，且宜高出地面（ ）以上。",[71,73,75,77],{"key":20,"text":72,"correct":22},"10cm",{"key":24,"text":74,"correct":22},"15cm",{"key":27,"text":76,"correct":32},"20cm",{"key":30,"text":78,"correct":22},"30cm",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},1124521,"采用悬臂浇筑法施工，挂篮设计的斜拉水平限位系统和上水平限位安全系数不得小于（ ）。",[83,84,85,86],{"key":20,"text":31,"correct":32},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":30,"text":87,"correct":22},"5",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":24,"analysis":33},1124522,"采用平卧重叠法浇筑构件混凝土时，上层构件须待下层构件混凝土强度达到（ ）后方可浇筑。",[92,94,96,98],{"key":20,"text":93,"correct":22},"2.5MPa",{"key":24,"text":95,"correct":32},"5MPa",{"key":27,"text":97,"correct":22},"设计强度的50%",{"key":30,"text":99,"correct":22},"设计强度的75%",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":27,"analysis":33},1124523,"在起吊桥梁构件时，吊绳与构件夹角小于（ ）时应设置吊架或吊装扁担。",[104,106,108,110],{"key":20,"text":105,"correct":22},"30°",{"key":24,"text":107,"correct":22},"45°",{"key":27,"text":109,"correct":32},"60°",{"key":30,"text":111,"correct":22},"75°",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":24,"analysis":33},1124524,"装配式桥梁构件在脱底模时，混凝土的强度不应低于设计要求的吊装强度，一般不应低于设计强度的（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"50%",{"key":24,"text":119,"correct":32},"75%",{"key":27,"text":121,"correct":22},"80%",{"key":30,"text":123,"correct":22},"100%",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},1124525,"装配式桥梁构件在脱底模、移运、堆放和吊装就位时，混凝土强度一般不应低于设计强度的（ ）。",[128,129,131,133],{"key":20,"text":119,"correct":32},{"key":24,"text":130,"correct":22},"70%",{"key":27,"text":132,"correct":22},"65%",{"key":30,"text":134,"correct":22},"60%",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":24,"analysis":33},1124526,"湿接头混凝土的养护时间应不少于（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"7d",{"key":24,"text":142,"correct":32},"14d",{"key":27,"text":144,"correct":22},"28d",{"key":30,"text":146,"correct":22},"42d",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":20,"analysis":33},1124527,"确定悬臂浇筑段前段高程时，不需要考虑的因素是（ ）。",[151,153,155,157],{"key":20,"text":152,"correct":32},"挂篮前端的水平变形值",{"key":24,"text":154,"correct":22},"预拱度设置",{"key":27,"text":156,"correct":22},"施工中已浇段的实际高程",{"key":30,"text":158,"correct":22},"温度影响",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":27,"analysis":33},1124528,"悬浇法施工时，预应力混凝土梁体一般分为（ ）大部分浇筑。",[163,165,167,169],{"key":20,"text":164,"correct":22},"两",{"key":24,"text":166,"correct":22},"三",{"key":27,"text":168,"correct":32},"四",{"key":30,"text":170,"correct":22},"五",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":27,"analysis":33},1124529,"下列装配式梁（板）安装方法中，不属于简支梁（板）架设方法的是（ ）。",[175,177,179,181],{"key":20,"text":176,"correct":22},"起重机架梁法",{"key":24,"text":178,"correct":22},"跨墩龙门吊架梁法",{"key":27,"text":180,"correct":32},"架桥机悬拼法",{"key":30,"text":182,"correct":22},"穿巷式架桥机架梁法",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":27,"analysis":33},1124530,"下列不属于装配式梁（板）架设方法的是（ ）。",[187,188,189,190],{"key":20,"text":176,"correct":22},{"key":24,"text":178,"correct":22},{"key":27,"text":180,"correct":32},{"key":30,"text":182,"correct":22},{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":20,"analysis":33},1124531,"在移动模架，上浇筑预应力混凝土连续梁时，浇筑分段工作缝必须设在（ ）附近。",[195,197,199,201],{"key":20,"text":196,"correct":32},"弯矩零点",{"key":24,"text":198,"correct":22},"1\u002F4最大弯矩点",{"key":27,"text":200,"correct":22},"1\u002F2最大弯矩点",{"key":30,"text":202,"correct":22},"弯矩最大点",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},1124532,"现浇预应力钢筋混凝土连续梁施工时，支架和模板完成后应进行预压，其作用是消除基础的沉陷和（ ）。",[207,209,211,213],{"key":20,"text":208,"correct":22},"支架弹性变形",{"key":24,"text":210,"correct":32},"支架非弹性变形",{"key":27,"text":212,"correct":22},"混凝土收缩及温度变形",{"key":30,"text":214,"correct":22},"混凝土连续梁预拱度",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},1124533,"涵洞两侧回填土时应对称进行，高差不宜超过（ ）mm。",[219,221,223,225],{"key":20,"text":220,"correct":22},"200",{"key":24,"text":222,"correct":32},"300",{"key":27,"text":224,"correct":22},"400",{"key":30,"text":226,"correct":22},"500",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":20,"analysis":33},1124534,"拱形涵、盖板涵施工遇有地下水时，应先将地下水降至基底以下（ ）方可施工。",[231,233,235,237],{"key":20,"text":232,"correct":32},"500mm",{"key":24,"text":234,"correct":22},"400mm",{"key":27,"text":236,"correct":22},"300mm",{"key":30,"text":238,"correct":22},"200mm",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":24,"analysis":33},1124536,"从经济角度讲，连续的盾构施工长度不宜小于（ ）m。",[243,244,245,246],{"key":20,"text":224,"correct":22},{"key":24,"text":222,"correct":32},{"key":27,"text":220,"correct":22},{"key":30,"text":247,"correct":22},"100",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1124537,"盾构法施工应有足够的埋深，覆土深度不宜小于（ ）m。",[252,254,255,256],{"key":20,"text":253,"correct":32},"6",{"key":24,"text":87,"correct":22},{"key":27,"text":43,"correct":22},{"key":30,"text":41,"correct":22},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},1124538,"喷锚暗挖法施工隧道的复合式衬砌结构中的主要承载单元是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":32},"初期支护",{"key":24,"text":264,"correct":22},"防水隔离层",{"key":27,"text":266,"correct":22},"二次衬砌",{"key":30,"text":268,"correct":22},"围岩",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1124539,"开挖宽度12～22m的单跨隧道（洞），可采用的方法是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"单侧壁导坑法",{"key":24,"text":276,"correct":32},"双侧壁导坑法",{"key":27,"text":278,"correct":22},"CRD法",{"key":30,"text":280,"correct":22},"PBA法",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1124540,"侧式车站一般采用（ ）结构。",[285,287,289,291],{"key":20,"text":286,"correct":22},"单跨",{"key":24,"text":288,"correct":32},"双跨",{"key":27,"text":290,"correct":22},"三跨",{"key":30,"text":292,"correct":22},"四跨",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1124541,"站台形式中，站台位于上、下行线路两侧的是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"岛式",{"key":24,"text":300,"correct":32},"侧式",{"key":27,"text":302,"correct":22},"岛侧混合式",{"key":30,"text":304,"correct":22},"普通式",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":30,"analysis":33},1124542,"城市轨道交通地面站台形式不包括（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"岛式站台",{"key":24,"text":312,"correct":22},"侧式站台",{"key":27,"text":314,"correct":22},"岛、侧混合式站台",{"key":30,"text":316,"correct":32},"中心站台",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":30,"analysis":33},1124543,"喷锚暗挖法施工车站结构，在（ ）底层中开挖时常需采用辅助施工措施。",[321,323,325,327],{"key":20,"text":322,"correct":22},"第一纪",{"key":24,"text":324,"correct":22},"第二纪",{"key":27,"text":326,"correct":22},"第三纪",{"key":30,"text":328,"correct":32},"第四纪",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1124544,"地铁工程施工常采用的方法中，自上而下的顶板、中隔板及水平支撑体系刚度大，可营造一个相对安全的作业环境的是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"盖挖顺作法",{"key":24,"text":336,"correct":32},"盖挖逆作法",{"key":27,"text":338,"correct":22},"明挖法",{"key":30,"text":340,"correct":22},"喷锚暗挖法",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":30,"analysis":33},1124545,"喷锚暗挖法隧道衬砌又称为（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"管棚结构",{"key":24,"text":348,"correct":22},"预加固结构",{"key":27,"text":350,"correct":22},"小导管结构",{"key":30,"text":352,"correct":32},"支护结构",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":30,"analysis":33},1124546,"下列关于地铁工程施工方法的说法中，正确的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"浅埋暗挖法允许带水作业",{"key":24,"text":360,"correct":22},"城市施工采用最多的是明挖法",{"key":27,"text":362,"correct":22},"盖挖逆作法施工中，一般都必须设置横撑并施加预应力",{"key":30,"text":364,"correct":32},"新奥法施工要求初期支护有一定刚度和柔度-",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},1124547,"以土压和塑流性改良控制为主，以排土量、盾构参数控制为辅的盾构属于（ ）盾构。",[369,371,373,375],{"key":20,"text":370,"correct":22},"手掘式",{"key":24,"text":372,"correct":22},"挤压式",{"key":27,"text":374,"correct":32},"土压式",{"key":30,"text":376,"correct":22},"泥水式",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},1124548,"不属于盖挖法施工优点的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"围护结构变形小",{"key":24,"text":384,"correct":22},"施工空间大",{"key":27,"text":386,"correct":22},"基坑底部隆起小",{"key":30,"text":388,"correct":32},"工程造价低",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":30,"analysis":33},1124549,"下列隧道施工方法中，当隧道穿过河底时不影响施工的是（ ）。",[393,395,396,398],{"key":20,"text":394,"correct":22},"新奥法",{"key":24,"text":338,"correct":22},{"key":27,"text":397,"correct":22},"浅埋暗挖法",{"key":30,"text":399,"correct":32},"盾构法",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":30,"analysis":33},1124550,"浅埋暗挖法中，二次衬砌时由于区间隧道的断面尺寸基本不变，多采用 ( )，可加快立模与拆模速度。",[404,406,408,410],{"key":20,"text":405,"correct":22},"预制装配式模板",{"key":24,"text":407,"correct":22},"定型钢模板",{"key":27,"text":409,"correct":22},"木模板",{"key":30,"text":411,"correct":32},"模板台车",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":30,"analysis":33},1124553,"降水工程的长宽比大于（ ）时，归类为线状。",[416,417,418,420],{"key":20,"text":62,"correct":22},{"key":24,"text":66,"correct":22},{"key":27,"text":419,"correct":22},"40",{"key":30,"text":421,"correct":32},"50",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1124554,"现浇壁板式地下连续墙施工中，控制挖槽精度的是（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"导沟",{"key":24,"text":429,"correct":32},"导墙",{"key":27,"text":431,"correct":22},"导管",{"key":30,"text":433,"correct":22},"接头管",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1124555,"宜用于郊区距居民点较远的地铁基坑施工中的围护结构是( )。",[438,440,442,444],{"key":20,"text":439,"correct":22},"地下连续墙",{"key":24,"text":441,"correct":32},"工字钢桩",{"key":27,"text":443,"correct":22},"SMW工法桩",{"key":30,"text":445,"correct":22},"灌注桩",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1124556,"下列降水井中降水深度不限的是（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"电渗井",{"key":24,"text":453,"correct":32},"管井",{"key":27,"text":455,"correct":22},"辐射井",{"key":30,"text":457,"correct":22},"潜埋井",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1124558,"基坑内被动区加固形式有很多种，当基坑面积较大时，宜采用（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"墩式加固",{"key":24,"text":465,"correct":32},"裙边加固",{"key":27,"text":467,"correct":22},"抽条加固",{"key":30,"text":469,"correct":22},"格栅式加固",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1124560,"强度大、变位小，同时可兼作主体结构的一部分的深基坑围护结构是（ ）。",[474,475,476,478],{"key":20,"text":445,"correct":22},{"key":24,"text":439,"correct":32},{"key":27,"text":477,"correct":22},"墙板式桩",{"key":30,"text":479,"correct":22},"自立式水泥土挡墙",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":27,"analysis":33},1124561,"某管道沟槽开挖宽度为5m，含水层构造较简单，裂隙较发育，工程环境无明确要求。按地下水控制复杂程度划分，属于（ ）降水工程。",[484,486,488,490],{"key":20,"text":485,"correct":22},"简单",{"key":24,"text":487,"correct":22},"中等简单",{"key":27,"text":489,"correct":32},"中等复杂",{"key":30,"text":491,"correct":22},"复杂",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},1124562,"关于真空井点施工安装的说法，正确的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"井点管的成孔达到设计孔深后，应减小泵量、冲洗钻孔、稀释泥浆",{"key":24,"text":499,"correct":32},"井点管安装到位后，向孔内投放的滤料粒径宜为0.4mm~0.6mm",{"key":27,"text":501,"correct":22},"井点管严禁与水泵连接安装，抽水系统不应漏水、漏气",{"key":30,"text":503,"correct":22},"真空井点布设完成后立即开始进行降水作业",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},1124563,"关于基坑（槽）内集水明排的说法，正确的是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"排水主要为了提高土体强度",{"key":24,"text":511,"correct":22},"沿排水沟宜每隔10m~30m设置一口集水井",{"key":27,"text":513,"correct":32},"集水井底面应比沟底面低1m以上，集水井尺寸和数量应根据汇水量确定",{"key":30,"text":515,"correct":22},"排水管道的直径应根据管道长度确定",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":27,"analysis":33},1124564,"在中砂以上的砂性土和有裂隙的岩石中进行注浆时应选用（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"劈裂注浆",{"key":24,"text":523,"correct":22},"压密注浆",{"key":27,"text":525,"correct":32},"渗透注浆",{"key":30,"text":527,"correct":22},"电动化学注浆",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":30,"analysis":33},1124565,"小导管注浆施工应根据土质条件选择注浆法，在淤泥质软土层中宜采用（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"渗入注浆法",{"key":24,"text":535,"correct":22},"劈裂注浆法",{"key":27,"text":537,"correct":22},"电动硅化注浆法",{"key":30,"text":539,"correct":32},"高压喷射注浆法",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":30,"analysis":33},1124566,"当采用一般静压力难以使浆液注入土的孔隙的地层，应采用（ ）方法进行地基处理。",[544,545,546,547],{"key":20,"text":525,"correct":22},{"key":24,"text":521,"correct":22},{"key":27,"text":523,"correct":22},{"key":30,"text":527,"correct":32},{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1124567,"双管法高压喷射注浆中喷射的介质是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"水泥浆液和高压水流",{"key":24,"text":555,"correct":32},"水泥浆液和压缩空气",{"key":27,"text":557,"correct":22},"压缩空气和高压水流",{"key":30,"text":559,"correct":22},"水泥浆液和固化剂",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":27,"analysis":33},1124568,"地基加固处理中，基坑外加固的目的主要是（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"提高土体的强度",{"key":24,"text":567,"correct":22},"提高土体的侧向抗力",{"key":27,"text":569,"correct":32},"止水",{"key":30,"text":571,"correct":22},"保护地下管线",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":30,"analysis":33},1124569,"基坑地基分为基坑内加固和基坑外加固，其中基坑外加固的目的主要是（ ），并可减少围护结构承受的主动土压力。",[576,578,580,582],{"key":20,"text":577,"correct":22},"提高土体强度",{"key":24,"text":579,"correct":22},"减少围护结构位移",{"key":27,"text":581,"correct":22},"保护基坑周边建筑物",{"key":30,"text":569,"correct":32},{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":30,"analysis":33},1124570,"下列地铁基坑内支撑构件中，属于钢结构支撑体系特有的构件是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"围檩",{"key":24,"text":590,"correct":22},"支撑",{"key":27,"text":592,"correct":22},"角撑",{"key":30,"text":594,"correct":32},"预应力设备",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]