[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":588},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,18,50,2846,[13,34,46,58,70,82,94,106,118,128,140,152,164,176,188,200,212,223,235,247,259,271,279,291,303,311,319,331,339,351,363,375,384,396,408,419,431,443,455,467,479,489,500,508,520,532,544,556,568,580],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1125366,1,"单选题","水处理构筑物满水试验( )之后进行。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","对混凝土结构，是在防水层施工",false,{"key":24,"text":25,"correct":22},"B","对混凝土结构，是在防腐层施工",{"key":27,"text":28,"correct":22},"C","对装配式预应力混凝土结构，是在保护层喷涂",{"key":30,"text":31,"correct":32},"D","对砌体结构，是在防水层施工",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1125367,"关于有盖水池的构筑物满水试验程序，排列正确的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":32},"试验准备→水池注水→水池内水位观测→有关资料整理",{"key":24,"text":41,"correct":22},"水池注水→试验准备→水池内水位观测→有关资料整理",{"key":27,"text":43,"correct":22},"试验准备→水池注水→水池内水位观测→蒸发量测定→有关资料整理",{"key":30,"text":45,"correct":22},"水池注水→试验准备→水池内水位观测→蒸发量测定→有关资料整理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1125368,"构筑物水池满水试验程序应为( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"水池注水→水池内水位观测→蒸发量测定→整理试验结论",{"key":24,"text":53,"correct":32},"试验准备→水池注水→水池内水位观测→蒸发量测定→整理试验结论",{"key":27,"text":55,"correct":22},"试验准备→水池注水→蒸发量测定，同时测水池内水位→整理试验结论",{"key":30,"text":57,"correct":22},"根据有关资料→水池注水→蒸发量测定→水池内水位观测→整理试验结论",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1125369,"满水试验中，水位测针的读数精确度应达到( )。",[62,64,66,68],{"key":20,"text":63,"correct":32},"0.1mm",{"key":24,"text":65,"correct":22},"0.01mm",{"key":27,"text":67,"correct":22},"0.1cm",{"key":30,"text":69,"correct":22},"0.2mm",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1125370,"构筑物水池满水试验，池内水位注至设计水位24h后，开始测读水位测针的初读数。水位观测的正确做法是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"测读水位末读数与初读数的时间间隔应不小于24h。水位测针读数精度应达到0.01mm",{"key":24,"text":77,"correct":22},"测读水位末读数与初读数的时间间隔可以根据现场情况而定。水位测针读数精度应达到0.1mm",{"key":27,"text":79,"correct":22},"测读水位末读数与初读数的时间间隔应不小于48h。水位测针读数精度应达到0.1mm",{"key":30,"text":81,"correct":32},"测读水位末读数与初读数的时间间隔应不小于24h。水位测针的读数精度应达到0.1mm",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1125371,"钢筋混凝土水池满水试验标准中规定：允许渗水量不得超过( )L\u002F(㎡·d)。",[86,88,90,92],{"key":20,"text":87,"correct":32},"2",{"key":24,"text":89,"correct":22},"2.5",{"key":27,"text":91,"correct":22},"3",{"key":30,"text":93,"correct":22},"3.5",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1125372,"对大中型水池，做满水试验进行外观观测时，要求( )。",[98,100,102,104],{"key":20,"text":99,"correct":32},"充水至池壁底部的施工缝以上，检查底板的抗渗质量",{"key":24,"text":101,"correct":22},"充水至设计水深的1\u002F3处，检查池壁四周及池底的抗渗质量",{"key":27,"text":103,"correct":22},"充水至池底一定高度后，检查池底部抗渗质量",{"key":30,"text":105,"correct":22},"必须充水至设计水深的1\u002F2处，检查池底的抗渗质量",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1125373,"无盖水池满水试验的蒸发量，可设现场蒸发水箱，并在水箱内设水位测针进行测定( )，测定水箱中的水位。",[110,112,114,116],{"key":20,"text":111,"correct":22},"测定水池中水位之前12h",{"key":24,"text":113,"correct":22},"测定水池中水位之后12h",{"key":27,"text":115,"correct":32},"测定水池中水位的同时",{"key":30,"text":117,"correct":22},"测定水池中水位之后8h",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1125374,"水池构筑物满水试验，其允许渗水量按设计水位浸湿的池壁和池底总面积(㎡）计算，砖石砌体水池不得超过( )L\u002F(㎡·d)。",[122,123,124,126],{"key":20,"text":87,"correct":22},{"key":24,"text":91,"correct":32},{"key":27,"text":125,"correct":22},"4",{"key":30,"text":127,"correct":22},"5",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":30,"analysis":33},1125376,"供热钢管对口焊接时，当壁厚≥15mm，其对口错边量应不大于( )mm。",[132,134,136,138],{"key":20,"text":133,"correct":22},"0.5",{"key":24,"text":135,"correct":22},"1.0",{"key":27,"text":137,"correct":22},"1.5",{"key":30,"text":139,"correct":32},"2.0",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1125377,"当地表水的浊度小于3mg\u002FL时，给水处理厂多采用的工艺流程是（）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"原水→初沉→混凝→沉淀→过滤→消毒→出水",{"key":24,"text":147,"correct":32},"原水→混凝→沉淀或澄清→过滤→消毒→出水",{"key":27,"text":149,"correct":22},"原水→曝气装置→氧化反应池→砂滤池→出水",{"key":30,"text":151,"correct":22},"原水→混凝→直接过滤→消毒→出水",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1125378,"城市污水处理厂典型的工艺流程是（）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"污水→格栅→沉砂池→二沉池→生物处理池→出水",{"key":24,"text":159,"correct":32},"污水→格栅→沉砂池→初沉池→生物处理池→二沉池→出水",{"key":27,"text":161,"correct":22},"污水→格栅→混凝→沉淀→过滤→消毒",{"key":30,"text":163,"correct":22},"污水→格栅→曝气氧化→混凝沉淀→消毒→出水",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":30,"analysis":33},1125379,"下列给水方法中，属于化学氧化法的是（）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"生物滤池法",{"key":24,"text":171,"correct":22},"TOC生物降解法",{"key":27,"text":173,"correct":22},"粉末活性炭吸附法",{"key":30,"text":175,"correct":32},"紫外光氧化法",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":27,"analysis":33},1125380,"城市污水处理方法，按原理可分为物理处理法、化学处理法和（ ）三类。",[180,182,184,186],{"key":20,"text":181,"correct":22},"沉淀法",{"key":24,"text":183,"correct":22},"氧化还原法",{"key":27,"text":185,"correct":32},"生物处理法",{"key":30,"text":187,"correct":22},"吸附法",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},1125381,"城镇污水二级处理工艺中采用的构筑物是（）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"格栅",{"key":24,"text":195,"correct":22},"沉砂池",{"key":27,"text":197,"correct":32},"二次沉淀池",{"key":30,"text":199,"correct":22},"接触池",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1125382,"城市污水处理厂常采用的生物处理法，其作用原理是（ ）的处理方法。",[204,206,208,210],{"key":20,"text":205,"correct":22},"利用微生物的物理作用，分离污水中呈悬浮状的固体污染物",{"key":24,"text":207,"correct":32},"利用微生物的代谢作用，去除污水中有机物质",{"key":27,"text":209,"correct":22},"利用投加药剂后的化学反应作用，使污水中溶解性物质生成沉淀物、络合物",{"key":30,"text":211,"correct":22},"利用微生物的吸附作用，去除污水中不溶性有机污染物",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},1125383,"下列厂站构筑物中，属于给水处理构筑物的是（）。",[216,218,219,221],{"key":20,"text":217,"correct":22},"初沉池",{"key":24,"text":197,"correct":22},{"key":27,"text":220,"correct":32},"过滤池",{"key":30,"text":222,"correct":22},"曝气池",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1125384,"关于厂站水处理工艺管线所采用新型管材的特性，说法有误的是（）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"水流性能好",{"key":24,"text":230,"correct":32},"抗弯性能好",{"key":27,"text":232,"correct":22},"抗腐蚀性能高",{"key":30,"text":234,"correct":22},"抗地层变位性好",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":30,"analysis":33},1125385,"单元组合式现浇钢筋混凝土水池工艺流程中，不含（ ）工序。",[239,241,243,245],{"key":20,"text":240,"correct":22},"土方开挖及地基处理",{"key":24,"text":242,"correct":22},"中心支柱浇筑",{"key":27,"text":244,"correct":22},"底板分块浇筑",{"key":30,"text":246,"correct":32},"顶板浇筑",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1125386,"分节制作、分次下沉的沉井，后续各节的模板底部应距地面不小于（）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"0.9m",{"key":24,"text":254,"correct":32},"1.0m",{"key":27,"text":256,"correct":22},"0.8m",{"key":30,"text":258,"correct":22},"0.7m",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":30,"analysis":33},1125387,"沉井下沉时工人6h换班一次，沉井的标高、轴线位移至少（）测量一次。",[263,265,267,269],{"key":20,"text":264,"correct":22},"1h",{"key":24,"text":266,"correct":22},"2h",{"key":27,"text":268,"correct":22},"4h",{"key":30,"text":270,"correct":32},"6h",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},1125388,"为严格控制超沉，沉井终沉时，沉井的标高、轴线位移至少( )测量一次。",[275,276,277,278],{"key":20,"text":264,"correct":32},{"key":24,"text":266,"correct":22},{"key":27,"text":268,"correct":22},{"key":30,"text":270,"correct":22},{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":20,"analysis":33},1125389,"沉井封底前自沉速率应小于( )。",[283,285,287,289],{"key":20,"text":284,"correct":32},"10mm／8h",{"key":24,"text":286,"correct":22},"15mm／8h",{"key":27,"text":288,"correct":22},"20mm／8h",{"key":30,"text":290,"correct":22},"25mm／8h",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":30,"analysis":33},1125390,"当地下水位高于水池基坑底面时，必须把水位降至基坑底下不少于（）处。",[295,297,299,301],{"key":20,"text":296,"correct":22},"200mm",{"key":24,"text":298,"correct":22},"300mm",{"key":27,"text":300,"correct":22},"400mm",{"key":30,"text":302,"correct":32},"500mm",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":33},1125391,"构筑物水池满水试验程序应为（ ）。",[307,308,309,310],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":32},{"key":27,"text":55,"correct":22},{"key":30,"text":57,"correct":22},{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},1125392,"砌体结构水池满水试验标准中，允许渗水量不得超过（）L\u002F(m2·d)。",[315,316,317,318],{"key":20,"text":91,"correct":32},{"key":24,"text":125,"correct":22},{"key":27,"text":87,"correct":22},{"key":30,"text":127,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":30,"analysis":33},1125393,"构筑物水池满水试验，池内水位注至设计水位24h后，开始测读水位测针的初读数。水位观测的正确做法是（）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"测读水位末读数与初读数的时间间隔应不小于24h。水位测针读数精度应达到0．01mm",{"key":24,"text":326,"correct":22},"测读水位末读数与初读数的时间间隔可以根据现场情况而定。水位测针读数精度应达到0．1mm",{"key":27,"text":328,"correct":22},"测读水位末读数与初读数的时间间隔应不小于48h。水位测针读数精度应达到0．1mm",{"key":30,"text":330,"correct":32},"测读水位末读数与初读数的时间间隔应不小于24h。水位测针的读数精度应达到0．1mm",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},1125394,"无盖水池满水试验的蒸发量，可设现场蒸发水箱，并在水箱内设水位测针进行测定。（ ）测定水箱中的水位。",[335,336,337,338],{"key":20,"text":111,"correct":22},{"key":24,"text":113,"correct":22},{"key":27,"text":115,"correct":32},{"key":30,"text":117,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1125395,"相同条件下放坡开挖沟槽，可采用最陡边坡的土层是( )。",[343,345,347,349],{"key":20,"text":344,"correct":22},"经井点降水后的软土",{"key":24,"text":346,"correct":22},"中密砂土",{"key":27,"text":348,"correct":32},"硬塑黏土",{"key":30,"text":350,"correct":22},"硬塑粉土",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},1125396,"管道沟槽底部的开挖宽度的计算公式为：B=D0+2×(b1+b2+b3)，则D0代表：( )。",[355,357,359,361],{"key":20,"text":356,"correct":22},"管道内径",{"key":24,"text":358,"correct":32},"管道外径",{"key":27,"text":360,"correct":22},"管道一侧的工作面宽度",{"key":30,"text":362,"correct":22},"管道一侧的支撑厚度",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":20,"analysis":33},1125397,"沟槽开挖下列说法错误的是( )。",[367,369,371,373],{"key":20,"text":368,"correct":32},"当沟槽挖深较大时，应按每层2.5m进行分层开挖",{"key":24,"text":370,"correct":22},"采用机械挖沟槽时，沟槽分层的深度按机械性能确定",{"key":27,"text":372,"correct":22},"在沟槽边坡稳固后设置供施工人员上下沟槽的安全梯",{"key":30,"text":374,"correct":22},"槽底原状地基土不得扰动",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1125398,"在软土或其他不稳定土层中采用横排撑板支撑时，开始支撑的沟槽开挖深度不得超过( )m，开挖与支撑交替进行，每次交替的深度宜为0.4-0.8m。",[379,381,382,383],{"key":20,"text":380,"correct":32},"1",{"key":24,"text":87,"correct":22},{"key":27,"text":91,"correct":22},{"key":30,"text":125,"correct":22},{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},1125399,"沟槽支撑施工时不符合施工质量规定或要求的是( )。",[388,390,392,394],{"key":20,"text":389,"correct":32},"沟槽开始支撑的开挖深度不得超过3.0m",{"key":24,"text":391,"correct":22},"撑板安装应与沟槽槽壁紧贴，有空隙时应填实",{"key":27,"text":393,"correct":22},"支撑后沟槽中心线每侧的净宽不应小于施工设计的规定",{"key":30,"text":395,"correct":22},"支撑不得妨碍下管和稳管",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":30,"analysis":33},1125400,"给水排水管道采用开槽施工时，沟槽开挖应按规定进行，以下关于沟槽开挖的规定说法错误的是( )。",[400,402,404,406],{"key":20,"text":401,"correct":22},"地质条件良好、土质均匀、地下水位低于沟槽底面高程、开挖深度在5m以内可按规定坡度放坡开挖",{"key":24,"text":403,"correct":22},"人工开挖多层沟槽的层间留台宽度，放坡开槽时不应小于0.8m",{"key":27,"text":405,"correct":22},"安装井点设备，多层沟槽的层间留台宽度不应小于1.5m。",{"key":30,"text":407,"correct":32},"当沟槽挖深较大时，应合理确定分层开挖的深度，每层深度不宜超过3m",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},1125401,"关于沟槽开挖下列说法中错误的是( )。",[412,414,416,417],{"key":20,"text":413,"correct":32},"人工开挖沟槽的挖深较大时，应按每层3m进行分层开挖",{"key":24,"text":415,"correct":22},"机械挖槽时，沟槽分层深度按机械性能确定",{"key":27,"text":374,"correct":22},{"key":30,"text":418,"correct":22},"槽底不得受水浸泡或受冻",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":30,"analysis":33},1125402,"钢管采用焊接接口时，内壁错边量不宜超过( )。",[423,425,427,429],{"key":20,"text":424,"correct":22},"管壁厚度的15%，且不得大于3mm",{"key":24,"text":426,"correct":22},"管壁厚度的15%，且不得大于2mm",{"key":27,"text":428,"correct":22},"管壁厚度的10%，且不得大于3mm",{"key":30,"text":430,"correct":32},"管壁厚度的10%，且不得大于2mm",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1125403,"采用手掘式顶管机时，应将地下水位降至管底( )以下。",[435,437,439,441],{"key":20,"text":436,"correct":32},"0.5m",{"key":24,"text":438,"correct":22},"0.4m",{"key":27,"text":440,"correct":22},"0.3m",{"key":30,"text":442,"correct":22},"0.2m",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1125404,"给水排水开槽管道施工，安管采用( )接口时，两端管的环向焊缝处应齐平，错口的允许偏差应为0.2倍壁厚，内壁错边量不宜超过管壁厚度的10%，且不得大于2㎜。",[447,449,451,453],{"key":20,"text":448,"correct":32},"焊接",{"key":24,"text":450,"correct":22},"胶圈",{"key":27,"text":452,"correct":22},"法兰",{"key":30,"text":454,"correct":22},"热熔连接",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":30,"analysis":33},1125405,"当无地层变形控制要求且顶力满足施工要求时，小口径金属管道可采用（）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"手掘式顶管机",{"key":24,"text":462,"correct":22},"土压平衡顶管机",{"key":27,"text":464,"correct":22},"水泥平衡顶管机",{"key":30,"text":466,"correct":32},"挤密土层顶管机",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1125406,"施工速度快、成本较低的不开槽管道施工方法是( )。",[471,473,475,477],{"key":20,"text":472,"correct":22},"盾构法",{"key":24,"text":474,"correct":32},"夯管法",{"key":27,"text":476,"correct":22},"定向钻法",{"key":30,"text":478,"correct":22},"浅埋暗挖法",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":30,"analysis":33},1125407,"当周围环境要求控制地层变形或无降水条件时，顶钢筋混凝土管宜采用( )。",[483,484,486,488],{"key":20,"text":460,"correct":22},{"key":24,"text":485,"correct":22},"挤密土层顶管法",{"key":27,"text":487,"correct":22},"夯管",{"key":30,"text":462,"correct":32},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":27,"analysis":33},1125408,"施工精度高，适用各种土层的不开槽管道施工方法是（）。",[493,494,496,498],{"key":20,"text":487,"correct":22},{"key":24,"text":495,"correct":22},"定向钻",{"key":27,"text":497,"correct":32},"浅埋暗挖",{"key":30,"text":499,"correct":22},"密闭式顶管",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},1125409,"城镇区域下穿较窄道路的小口径金属管道施工宜采用( )。",[504,505,506,507],{"key":20,"text":460,"correct":22},{"key":24,"text":495,"correct":22},{"key":27,"text":487,"correct":32},{"key":30,"text":462,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1125410,"采用混凝土砌块砌筑拱形管渠或管渠的弯道时，宜采用( )。",[512,514,516,518],{"key":20,"text":513,"correct":22},"楔形或梯形砌块",{"key":24,"text":515,"correct":32},"楔形或扇形砌块",{"key":27,"text":517,"correct":22},"楔形或方形砌块",{"key":30,"text":519,"correct":22},"条形或扇形砌块",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},1125411,"用于砌筑结构的石材强度等级应符合设计要求，设计无要求时不得小于( )。",[524,526,528,530],{"key":20,"text":525,"correct":32},"30MPa",{"key":24,"text":527,"correct":22},"25MPa",{"key":27,"text":529,"correct":22},"20MPa",{"key":30,"text":531,"correct":22},"15MPa",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":27,"analysis":33},1125413,"抹面砂浆终凝后，应及时保持湿润养护，养护时间不宜少于( )。",[536,538,540,542],{"key":20,"text":537,"correct":22},"8d",{"key":24,"text":539,"correct":22},"10d",{"key":27,"text":541,"correct":32},"14d",{"key":30,"text":543,"correct":22},"12d",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1125414,"给水排水压力管道的水压试验分为( )。",[548,550,552,554],{"key":20,"text":549,"correct":22},"强度试验和严密性试验",{"key":24,"text":551,"correct":32},"预试验和主试验",{"key":27,"text":553,"correct":22},"闭水试验和闭气试验",{"key":30,"text":555,"correct":22},"满水试验和严密性试验",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":30,"analysis":33},1125415,"给水管道应进行( )试验，合格后方可通水投入运行。",[560,562,564,566],{"key":20,"text":561,"correct":22},"强度",{"key":24,"text":563,"correct":22},"满水",{"key":27,"text":565,"correct":22},"严密性",{"key":30,"text":567,"correct":32},"水压",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},1125416,"关于无压管道功能性试验的说法，正确的是（）。",[572,574,576,578],{"key":20,"text":573,"correct":32},"当管道内径大于700㎜时，可抽取1\u002F3井段数量进行试验",{"key":24,"text":575,"correct":22},"污水管段长度300m时，可不做试验",{"key":27,"text":577,"correct":22},"可采用水压试验",{"key":30,"text":579,"correct":22},"试验期间渗水量的观测时间不得小于20min",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":30,"analysis":33},1125417,"压力管道水压试验的管段长度不宜大于( )km。",[584,585,586,587],{"key":20,"text":125,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":87,"correct":22},{"key":30,"text":380,"correct":32},[589,592,595,598,601,604],{"id":15,"name":590,"category":7,"favorite":591},"领导干部任职前廉政法规知识测试题",92,{"id":593,"name":594,"category":7,"favorite":15},595,"建筑结构与设备",{"id":596,"name":597,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":599,"name":600,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":602,"name":603,"category":7,"favorite":8},534,"BIM工程师",{"id":605,"name":603,"category":7,"favorite":8},535]