[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,17,50,2846,[13,34,46,58,70,82,94,106,118,129,141,153,164,176,188,200,211,223,234,246,258,270,282,294,305,317,329,341,353,365,377,389,401,413,422,431,443,455,467,479,487,499,511,520,532,544,556,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1125314,1,"单选题","地铁基坑围护墙体竖向变位不会影响到（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","基坑稳定",false,{"key":24,"text":25,"correct":22},"B","地表沉降",{"key":27,"text":28,"correct":22},"C","墙体稳定",{"key":30,"text":31,"correct":32},"D","坑底沉降",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1125315,"地铁基坑内支撑围护结构的挡土应力传递路径是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"围檩→支撑→围护墙",{"key":24,"text":41,"correct":22},"围护墙→支撑→围檩",{"key":27,"text":43,"correct":32},"围护墙→围檩→支撑",{"key":30,"text":45,"correct":22},"支撑→围护墙→围檩",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1125316,"支护结构破坏、土体失稳或过大变形对基坑周边环境及地下结构施工影响（ ），则基坑侧壁安全等级定为一级。",[50,52,54,56],{"key":20,"text":51,"correct":32},"严重",{"key":24,"text":53,"correct":22},"一般",{"key":27,"text":55,"correct":22},"轻微",{"key":30,"text":57,"correct":22},"很大",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1125317,"基坑开挖方案应根据（）确定。",[62,64,66,68],{"key":20,"text":63,"correct":32},"支护结构设计、降排水要求",{"key":24,"text":65,"correct":22},"基坑平面尺寸、深度",{"key":27,"text":67,"correct":22},"基坑深度、周边环境要求",{"key":30,"text":69,"correct":22},"基坑深度、降排水要求",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1125318,"给水处理工艺中，设置消毒工序的目的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"去除水中某些有机化合物，保障人体健康",{"key":24,"text":77,"correct":32},"去除水中病毒和细菌，保证饮水卫生和生产用水安全",{"key":27,"text":79,"correct":22},"与水中某些物质发生反应，以降低有毒物浓度",{"key":30,"text":81,"correct":22},"杀死水中浮游生物，提高饮用水水质",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1125319,"地表水作为饮用水源时，给水处理中主要的去除对象是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"金属离子",{"key":24,"text":89,"correct":22},"有益细菌",{"key":27,"text":91,"correct":32},"悬浮物和胶体物质",{"key":30,"text":93,"correct":22},"有机物和铁、锰",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1125320,"以地下水为水源的饮用水处理工艺中，用于除铁、锰处理的构筑物为( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"澄清池",{"key":24,"text":101,"correct":32},"淹没式生物滤池",{"key":27,"text":103,"correct":22},"预沉池",{"key":30,"text":105,"correct":22},"沉淀池",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1125321,"某一水库的原水悬浮物一般在50～80mg\u002FL，水质稳定，合理的给水处理工艺流程是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"原水→沉淀→消毒",{"key":24,"text":113,"correct":32},"原水→接触过滤→消毒",{"key":27,"text":115,"correct":22},"原水→澄清→过滤→消毒",{"key":30,"text":117,"correct":22},"原水→混凝、沉淀→过滤→消毒",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1125322,"对浊度小于3mg\u002FL的河水，一般给水处理厂广泛采用的常规处理流程是( )。",[122,124,125,127],{"key":20,"text":123,"correct":22},"原水→过滤→消毒",{"key":24,"text":113,"correct":22},{"key":27,"text":126,"correct":32},"原水→混凝、沉淀或澄清→过滤→消毒",{"key":30,"text":128,"correct":22},"原水→预沉淀→混凝、沉淀→过滤→消毒",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":30,"analysis":33},1125323,"当地表水的浊度小于3mg\u002FL时，给水处理厂多采用的工艺流程是( )。",[133,135,137,139],{"key":20,"text":134,"correct":22},"原水→初沉→混凝→沉淀→过滤→消毒→出水",{"key":24,"text":136,"correct":22},"原水→过滤→混凝、沉淀或澄清→消毒→出水",{"key":27,"text":138,"correct":22},"原水→曝气装置→氧化反应池→砂滤池→出水",{"key":30,"text":140,"correct":32},"原水→混凝、沉淀或澄清→过滤→消毒→出水",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1125324,"以地表水处理后作为饮用水，当原水的浊度很高时，往往要在混凝前设置( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"过滤池",{"key":24,"text":148,"correct":32},"调蓄预沉",{"key":27,"text":150,"correct":22},"曝气氧化池和沉淀池",{"key":30,"text":152,"correct":22},"氧化或砂滤池",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":30,"analysis":33},1125325,"水中铁、锰含量超过生活饮用水卫生标准时，要采用( )去除铁、锰。",[157,159,161,163],{"key":20,"text":158,"correct":22},"投加混凝剂",{"key":24,"text":160,"correct":22},"增设预沉池或沉淀池",{"key":27,"text":162,"correct":22},"加氯接触消毒",{"key":30,"text":101,"correct":32},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},1125326,"现代城市污水处理技术，按照处理程度可分( )。",[168,170,172,174],{"key":20,"text":169,"correct":22},"一级和二级处理",{"key":24,"text":171,"correct":22},"普通处理及特殊处理",{"key":27,"text":173,"correct":32},"一级、二级和三级处理",{"key":30,"text":175,"correct":22},"排放处理和回用处理",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":27,"analysis":33},1125327,"城市污水处理方法，按原理可分为物理处理法、化学处理法和( )三类。",[180,182,184,186],{"key":20,"text":181,"correct":22},"沉淀法",{"key":24,"text":183,"correct":22},"氧化还原法",{"key":27,"text":185,"correct":32},"生物处理法",{"key":30,"text":187,"correct":22},"吸附法",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":30,"analysis":33},1125328,"城市污水处理采用一级处理时，通常其工艺流程为( )。",[192,194,196,198],{"key":20,"text":193,"correct":22},"污水→格栅→沉砂池→生物处理池→二沉池",{"key":24,"text":195,"correct":22},"污水→沉砂池→初沉池→二沉池→消毒",{"key":27,"text":197,"correct":22},"污水→格栅→沉淀池→过滤池→出水",{"key":30,"text":199,"correct":32},"污水→格栅→沉砂池→沉淀池→接触池→出水",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":27,"analysis":33},1125329,"下列不属于污水处理中一级处理工艺所采用的构筑物的是( )。",[204,206,207,209],{"key":20,"text":205,"correct":22},"沉砂池",{"key":24,"text":105,"correct":22},{"key":27,"text":208,"correct":32},"二沉池",{"key":30,"text":210,"correct":22},"格栅",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1125330,"城市污水处理厂常采用的生物处理法，其作用原理是( )的处理方法。",[215,217,219,221],{"key":20,"text":216,"correct":22},"利用微生物的物理作用，分离污水中呈悬浮状的固体污染物",{"key":24,"text":218,"correct":32},"利用微生物的代谢作用，去除污水中有机物质",{"key":27,"text":220,"correct":22},"利用投加药剂后的化学反应作用，使污水中溶解性物质生成沉淀物、络合物",{"key":30,"text":222,"correct":22},"利用微生物的吸附作用，去除污水中不溶性有机污染物",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1125331,"城市污水处理厂典型的工艺流程是( )。",[227,229,230,232],{"key":20,"text":228,"correct":22},"污水→格栅→沉砂池→污泥消化→沉淀池→出水",{"key":24,"text":199,"correct":32},{"key":27,"text":231,"correct":22},"污水→格栅→混凝→沉淀→过滤→消毒",{"key":30,"text":233,"correct":22},"污水→格栅→曝气氧化→混凝沉淀→消毒→出水",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},1125332,"现代处理污水工艺技术，在一级、二级处理后，三级处理用来进一步处理难以降解的有机物、磷和氮等能够导致水体富营养化的( )等。",[238,240,242,244],{"key":20,"text":239,"correct":32},"可溶性无机物",{"key":24,"text":241,"correct":22},"不可溶性无机物",{"key":27,"text":243,"correct":22},"可溶性有机物",{"key":30,"text":245,"correct":22},"不可溶性有机物",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":30,"analysis":33},1125333,"下列选项中，属于给水处理构筑物的是（）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"消化池",{"key":24,"text":253,"correct":22},"曝气池",{"key":27,"text":255,"correct":22},"氧化沟",{"key":30,"text":257,"correct":32},"混凝沉淀池",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1125334,"再生水回用处理是指将经过( )处理后的污水再进行深度处理，以去除剩余的污染物，使净化后的污水达到各种回用目的的水质要求。",[262,264,266,268],{"key":20,"text":263,"correct":22},"一级",{"key":24,"text":265,"correct":32},"二级",{"key":27,"text":267,"correct":22},"三级",{"key":30,"text":269,"correct":22},"化学",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},1125335,"城市污水处理厂采用三级处理工艺，其目的是用来进一步处理难以降解的有机物、( )等导致水体富营养化的可溶性无机物等。",[274,276,278,280],{"key":20,"text":275,"correct":22},"细菌及病原菌",{"key":24,"text":277,"correct":22},"重金属离子",{"key":27,"text":279,"correct":22},"铁和锰离子",{"key":30,"text":281,"correct":32},"氮和磷",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":30,"analysis":33},1125336,"关于厂站水处理构筑物的特点，说法有误的是( )。",[286,288,290,292],{"key":20,"text":287,"correct":22},"构件多采用薄板或薄壳型结构，断面薄，配筋率高",{"key":24,"text":289,"correct":22},"较高抗渗性",{"key":27,"text":291,"correct":22},"良好整体性",{"key":30,"text":293,"correct":32},"高耐腐蚀性",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},1125337,"下列厂站构筑物中，属于污水处理构筑物的是( )。",[298,300,301,303],{"key":20,"text":299,"correct":22},"配水井",{"key":24,"text":257,"correct":22},{"key":27,"text":302,"correct":22},"反应池",{"key":30,"text":304,"correct":32},"生物塘",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1125338,"水处理构筑物和泵房多数采用地下或半地下钢筋混凝土结构，不属于其特点的是( )。",[309,311,313,315],{"key":20,"text":310,"correct":32},"构件断面较厚",{"key":24,"text":312,"correct":22},"配筋率较高",{"key":27,"text":314,"correct":22},"具有较高的抗渗性",{"key":30,"text":316,"correct":22},"具有良好的整体性要求",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1125339,"关于厂站水处理工艺管线的特点，说法有误的是( )。",[321,323,325,327],{"key":20,"text":322,"correct":22},"水流性能好",{"key":24,"text":324,"correct":32},"抗弯性能好",{"key":27,"text":326,"correct":22},"抗腐蚀性能高",{"key":30,"text":328,"correct":22},"抗地层变位性好",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1125340,"在下列结构形式中，属于水处理构筑物常用结构的是( )。",[333,335,337,339],{"key":20,"text":334,"correct":32},"钢筋混凝土结构",{"key":24,"text":336,"correct":22},"砖砌结构",{"key":27,"text":338,"correct":22},"钢结构",{"key":30,"text":340,"correct":22},"土膜结构",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},1125341,"给水与污水处理厂试运行内容不包括( )。",[345,347,349,351],{"key":20,"text":346,"correct":32},"性能标定",{"key":24,"text":348,"correct":22},"单机试车",{"key":27,"text":350,"correct":22},"联机运行",{"key":30,"text":352,"correct":22},"空载运行",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1125342,"给水与污水处理厂试运转单机试车，一般空车试运行不少于( )。",[357,359,361,363],{"key":20,"text":358,"correct":22},"1h",{"key":24,"text":360,"correct":32},"2h",{"key":27,"text":362,"correct":22},"3h",{"key":30,"text":364,"correct":22},"5h",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1125343,"水池施工中，橡胶止水带的接头方法是( )。",[369,371,373,375],{"key":20,"text":370,"correct":32},"热接",{"key":24,"text":372,"correct":22},"搭接",{"key":27,"text":374,"correct":22},"粘接",{"key":30,"text":376,"correct":22},"叠接",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},1125344,"跨径不小于4m的现浇钢筋混凝土梁、板，其模板应按设计要求砌拱，设计无具体要求时，砌拱高度宜为跨度的( )。",[381,383,385,387],{"key":20,"text":382,"correct":22},"1\u002F1000—2\u002F1000",{"key":24,"text":384,"correct":22},"2\u002F1000—3\u002F1000",{"key":27,"text":386,"correct":22},"1\u002F1000—3\u002F2000",{"key":30,"text":388,"correct":32},"1\u002F1000—3\u002F1000",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1125345,"关于现浇预应力水池施工的说法，错误的是( )。",[393,395,397,399],{"key":20,"text":394,"correct":22},"在安装池壁的最下一层模板时，应在适当位置预留清扫杂物用的窗口",{"key":24,"text":396,"correct":32},"池壁与顶板连续施工时，池壁内模立柱可同时作为顶板模板立柱",{"key":27,"text":398,"correct":22},"应在混凝土浇筑之前对安装完毕的钢筋进行隐蔽验收",{"key":30,"text":400,"correct":22},"预应力筋外包层材料，应采用聚乙烯或聚丙烯，严禁使用聚氯乙烯",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":30,"analysis":33},1125346,"单元组合式现浇钢筋混凝土水池工艺流程中，不含( )工序。",[405,407,409,411],{"key":20,"text":406,"correct":22},"土方开挖及地基处理",{"key":24,"text":408,"correct":22},"中心支柱浇筑",{"key":27,"text":410,"correct":22},"底板分块浇筑",{"key":30,"text":412,"correct":32},"顶板浇筑",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":27,"analysis":33},1125347,"塑料或橡胶止水带接头应采用( )。",[417,418,419,420],{"key":20,"text":374,"correct":22},{"key":24,"text":376,"correct":22},{"key":27,"text":370,"correct":32},{"key":30,"text":421,"correct":22},"咬接",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1125348,"整体式现浇钢筋混凝土池体结构施工流程中，不含( )工序。",[426,427,428,430],{"key":20,"text":406,"correct":22},{"key":24,"text":408,"correct":32},{"key":27,"text":429,"correct":22},"底板浇筑",{"key":30,"text":412,"correct":22},{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":30,"analysis":33},1125349,"关于安装张拉设备时张拉力作用线与预应力筋中心线关系的说法，正确的是( )。",[435,437,439,441],{"key":20,"text":436,"correct":22},"对直线无粘结预应力筋，应使张拉力的作用线与预应力筋中心线末端重合",{"key":24,"text":438,"correct":22},"对曲线无粘结预应力筋，应使张拉力的作用线与预应力筋中心线重合",{"key":27,"text":440,"correct":22},"对曲线无粘结预应力筋，应使张拉力的作用线与预应力筋中心线始端重合",{"key":30,"text":442,"correct":32},"对直线无粘结预应力筋，应使张拉力的作用线与预应力筋中心线重合",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1125350,"预应力筋外包层材料，严禁使用( )。",[447,449,451,453],{"key":20,"text":448,"correct":32},"聚氯乙烯",{"key":24,"text":450,"correct":22},"聚乙烯",{"key":27,"text":452,"correct":22},"聚丙烯",{"key":30,"text":454,"correct":22},"HDPE",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":20,"analysis":33},1125351,"无粘结预应力筋宜采用一端张拉的是( )。",[459,461,463,465],{"key":20,"text":460,"correct":32},"20m",{"key":24,"text":462,"correct":22},"30m",{"key":27,"text":464,"correct":22},"40m",{"key":30,"text":466,"correct":22},"50m",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},1125352,"现浇预应力混凝土设计强度等级为C35，则封锚混凝土强度等级不得低于( )。",[471,473,475,477],{"key":20,"text":472,"correct":22},"C30",{"key":24,"text":474,"correct":22},"C35",{"key":27,"text":476,"correct":32},"C40",{"key":30,"text":478,"correct":22},"C45",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},1125353,"现浇预应力混凝土水池施工要求封锚混凝土强度等级不得低于( )。",[483,484,485,486],{"key":20,"text":472,"correct":22},{"key":24,"text":474,"correct":22},{"key":27,"text":476,"correct":32},{"key":30,"text":478,"correct":22},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},1125354,"给排水厂站中，对钢筋（预应力）混凝土水池（构筑物），设计上不作要求的混凝土性能是( )。",[491,493,495,497],{"key":20,"text":492,"correct":32},"防腐",{"key":24,"text":494,"correct":22},"抗渗",{"key":27,"text":496,"correct":22},"抗裂",{"key":30,"text":498,"correct":22},"抗冻",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":30,"analysis":33},1125355,"整体现浇混凝土悬臂构件的悬臂长为3m的时候，底模板拆模时所需混凝土强度应达到设计强度的( )。",[503,505,507,509],{"key":20,"text":504,"correct":22},"50%",{"key":24,"text":506,"correct":22},"65%",{"key":27,"text":508,"correct":22},"75%",{"key":30,"text":510,"correct":32},"100%",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":30,"analysis":33},1125356,"给水排水场站中，对钢筋混凝土水池，设计上不作要求的混凝土性能是( )。",[515,516,517,518],{"key":20,"text":498,"correct":22},{"key":24,"text":494,"correct":22},{"key":27,"text":496,"correct":22},{"key":30,"text":519,"correct":32},"抗碳化",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":30,"analysis":33},1125357,"沉井刃脚的垫层采用砂垫层上铺垫木方案时，以下说法中错误的是( )。",[524,526,528,530],{"key":20,"text":525,"correct":22},"砂垫层分布在刃脚中心线两侧，应考虑方便抽除垫木",{"key":24,"text":527,"correct":22},"砂垫层宜采用中粗砂，并应分层铺设、分层夯实",{"key":27,"text":529,"correct":22},"垫木铺设应使刃脚底面在同一水平面上，并符合设计起沉标高的要求",{"key":30,"text":531,"correct":32},"定位垫木的布置应使沉井成三点着力状态",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},1125358,"分节制作、分次下沉的沉井，后续各节的模板底部应距地面不小于( )。",[536,538,540,542],{"key":20,"text":537,"correct":22},"0.9m",{"key":24,"text":539,"correct":32},"1m",{"key":27,"text":541,"correct":22},"0.8m",{"key":30,"text":543,"correct":22},"0.7m",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1125359,"沉井下沉出现倾斜偏差时，可采用( )措施进行纠偏。",[548,550,552,554],{"key":20,"text":549,"correct":22},"高压射水",{"key":24,"text":551,"correct":32},"调整开挖顺序和方式",{"key":27,"text":553,"correct":22},"抽水减浮",{"key":30,"text":555,"correct":22},"炮振",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1125361,"关于沉井下沉监控测量的说法，错误的是( )。",[560,562,564,566],{"key":20,"text":561,"correct":22},"下沉时标高、轴线位移每班至少测量一次",{"key":24,"text":563,"correct":32},"封底前自沉速率应大于10mm\u002F8h",{"key":27,"text":565,"correct":22},"如发生异常情况应加密量测",{"key":30,"text":567,"correct":22},"大型沉井应进行结构变形和裂缝观测",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":30,"analysis":33},1125362,"当地下水位高于水池基坑底面时，必须把水位降至基坑底下不少于( )处。",[572,574,576,578],{"key":20,"text":573,"correct":22},"200mm",{"key":24,"text":575,"correct":22},"300mm",{"key":27,"text":577,"correct":22},"400mm",{"key":30,"text":579,"correct":32},"500mm",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1125363,"沉井下沉过程中，不可用于减少摩阻力的措施是（）。",[584,586,588,590],{"key":20,"text":585,"correct":32},"排水下沉",{"key":24,"text":587,"correct":22},"空气幕助沉",{"key":27,"text":589,"correct":22},"在井外壁与土体间灌人黄砂",{"key":30,"text":591,"correct":22},"触变泥浆套助沉",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":30,"analysis":33},1125364,"沉井下沉时工人6小时换班一次，沉井的标高、轴线位移至少( )测量一次。",[596,597,598,600],{"key":20,"text":358,"correct":22},{"key":24,"text":360,"correct":22},{"key":27,"text":599,"correct":22},"4h",{"key":30,"text":601,"correct":32},"6h",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]