[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":574},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,15,50,2846,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,213,222,234,246,258,270,281,293,304,316,328,340,350,362,374,384,396,404,416,424,436,448,460,470,479,488,498,507,517,529,539,547,558,566],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1125213,1,"单选题","基坑边坡坡度是直接影响基坑稳定的重要因素，当基坑边坡土体中的剪应力大于土体的（）强度时，边坡就会失稳坍塌。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","抗扭",false,{"key":24,"text":25,"correct":22},"B","抗拉",{"key":27,"text":28,"correct":22},"C","抗压",{"key":30,"text":31,"correct":32},"D","抗剪",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1125214,"放坡基坑施工中，放坡应以控制分析（）为主",[38,40,42,44],{"key":20,"text":39,"correct":22},"土体剪应力",{"key":24,"text":41,"correct":22},"土体抗剪强度",{"key":27,"text":43,"correct":22},"土体拉应力",{"key":30,"text":45,"correct":32},"高度和坡度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1125215,"明挖基坑采用分级放坡施工，下级坡度宜( )上级坡度。",[50,52,54,56],{"key":20,"text":51,"correct":32},"缓于",{"key":24,"text":53,"correct":22},"等于",{"key":27,"text":55,"correct":22},"陡于",{"key":30,"text":57,"correct":22},"大于等于",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1125216,"挂网喷浆时，在人工修平坡面后，沿坡面挂钢筋网或钢丝网，然后喷射水泥砂浆或细石混凝土，厚度宜为( )，坡脚同样需要处理",[62,64,66,68],{"key":20,"text":63,"correct":22},"150～160mm",{"key":24,"text":65,"correct":22},"100～150mm",{"key":27,"text":67,"correct":22},"30～40mm",{"key":30,"text":69,"correct":32},"50～60mm",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1125217,"降水工程的长宽比大于（）时，归类为线状。",[74,76,78,80],{"key":20,"text":75,"correct":22},"20",{"key":24,"text":77,"correct":22},"30",{"key":27,"text":79,"correct":22},"40",{"key":30,"text":81,"correct":32},"50",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1125218,"下列降水井中降水深度不限的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"电渗井",{"key":24,"text":89,"correct":32},"管井",{"key":27,"text":91,"correct":22},"辐射井",{"key":30,"text":93,"correct":22},"潜埋井",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1125219,"关于基坑（槽）内明沟排水的说法，正确的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"排水主要为了提高土体强度",{"key":24,"text":101,"correct":32},"排水沟坡度宜为0.1%~0.5%",{"key":27,"text":103,"correct":22},"集水井底面应比沟底面低0.5m以上",{"key":30,"text":105,"correct":22},"沿排水沟每隔20m应设一座集水井",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1125220,"水泥土搅拌法地基加固适用于( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"障碍物较多的杂填土",{"key":24,"text":113,"correct":22},"欠固结的淤泥质土",{"key":27,"text":115,"correct":32},"可塑的黏性土",{"key":30,"text":117,"correct":22},"密实的砂类土",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1125221,"地基加固处理方法中，( )适用于较浅基坑，方法简单操作方便。",[122,124,126,128],{"key":20,"text":123,"correct":32},"换填材料",{"key":24,"text":125,"correct":22},"水泥土搅拌",{"key":27,"text":127,"correct":22},"高压喷射注浆",{"key":30,"text":129,"correct":22},"渗透注浆",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1125222,"用于深层搅拌法加固地基的喷粉搅拌机目前仅有（ ）搅拌机一种机型。",[134,136,138,140],{"key":20,"text":135,"correct":32},"单轴",{"key":24,"text":137,"correct":22},"双轴",{"key":27,"text":139,"correct":22},"三轴",{"key":30,"text":141,"correct":22},"多轴",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},1125223,"在中砂以上的砂性土和有裂隙的岩石，适用( )法加固地层。",[146,148,150,152],{"key":20,"text":147,"correct":22},"电动化学注浆",{"key":24,"text":149,"correct":22},"劈裂注浆",{"key":27,"text":151,"correct":22},"压密注浆",{"key":30,"text":129,"correct":32},{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1125224,"关于各种注浆法的适用范围，说法错误的是( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"渗透注浆只适用于中砂以上的砂性土和有裂隙的岩石",{"key":24,"text":160,"correct":32},"劈裂注浆适用于渗透系数k＜10^-4cm\u002Fs、靠静压力难以注入的土层",{"key":27,"text":162,"correct":22},"压密注浆常用于中砂地层，黏土地层中若有适宜的排水条件也可采用",{"key":30,"text":164,"correct":22},"压密注浆如遇地层排水困难时，就必须降低注浆速率",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},1125225,"单管法高压喷射注浆中喷射的介质是( )。",[169,171,173,175],{"key":20,"text":170,"correct":22},"高压水流和水泥浆液",{"key":24,"text":172,"correct":22},"高压水泥浆液和压缩空气",{"key":27,"text":174,"correct":32},"高压水泥浆液",{"key":30,"text":176,"correct":22},"高压水流、压缩空气及水泥浆液",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":30,"analysis":33},1125226,"关于高压喷射注浆加固地基施工的基本工序，说法正确的是( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"钻机就位→钻孔→喷射注浆",{"key":24,"text":184,"correct":22},"钻机就位→打入注浆管→喷射注浆→拔出注浆管",{"key":27,"text":186,"correct":22},"钻机就位→打入注浆管→钻孔→喷射注浆→拔出注浆管",{"key":30,"text":188,"correct":32},"钻机就位→钻孔→置入注浆管→喷射注浆→拔出注浆管",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},1125227,"主要材料可反复使用、止水性好的基坑围护结构是( )。",[193,195,197,199],{"key":20,"text":194,"correct":22},"钢管桩",{"key":24,"text":196,"correct":22},"灌注桩",{"key":27,"text":198,"correct":32},"SMW工法桩",{"key":30,"text":200,"correct":22},"型钢桩",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1125228,"特点是强度大，止水性好，内插的型钢可拔出反复使用，经济性好的地铁及轨道工程常见围护结构是( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"深层搅拌桩挡土结构",{"key":24,"text":208,"correct":32},"SMW工法围护结构",{"key":27,"text":210,"correct":22},"工字钢桩围护结构",{"key":30,"text":212,"correct":22},"钢板桩围护结构",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1125229,"地铁及轨道工程常见围护结构中，一般采用机械成孔的是( )。",[217,218,220,221],{"key":20,"text":212,"correct":22},{"key":24,"text":219,"correct":32},"钻孔灌注桩围护结构",{"key":27,"text":210,"correct":22},{"key":30,"text":206,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1125230,"SMW工法桩（型钢水泥土搅拌墙）复合围护结构多用于（）地层。",[226,228,230,232],{"key":20,"text":227,"correct":32},"软土",{"key":24,"text":229,"correct":22},"软岩",{"key":27,"text":231,"correct":22},"砂卵石",{"key":30,"text":233,"correct":22},"冻土",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},1125232,"基坑内支撑围护结构的档土应力传递路径是( )。",[238,240,242,244],{"key":20,"text":239,"correct":22},"围檩→支撑→围护墙",{"key":24,"text":241,"correct":22},"围护墙→支撑→围檩",{"key":27,"text":243,"correct":32},"围护墙→围檩→支撑",{"key":30,"text":245,"correct":22},"支撑→围护墙→围檩",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1125233,"布置形式灵活多样，有对撑、边桁架、环梁结合边桁架等形式的支撑体系是( )。",[250,252,254,256],{"key":20,"text":251,"correct":32},"现浇钢筋混凝土",{"key":24,"text":253,"correct":22},"预应力钢筋混凝土",{"key":27,"text":255,"correct":22},"钢结构",{"key":30,"text":257,"correct":22},"板桩结构",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1125234,"在深基坑的施工支护结构中，钢支撑体系平面布置形式一般不包括( )。",[262,264,266,268],{"key":20,"text":263,"correct":22},"对撑",{"key":24,"text":265,"correct":32},"斜撑",{"key":27,"text":267,"correct":22},"角撑",{"key":30,"text":269,"correct":22},"井字撑",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},1125235,"下列地铁基坑内支撑构件中，属于钢结构支撑体系特有的构件是( )。",[274,276,278,279],{"key":20,"text":275,"correct":22},"围檩",{"key":24,"text":277,"correct":22},"支撑",{"key":27,"text":267,"correct":22},{"key":30,"text":280,"correct":32},"预应力设备",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1125236,"设有支护的基坑土方开挖过程中，能够反映坑底土体隆起的监测项目是（）。",[285,287,289,291],{"key":20,"text":286,"correct":32},"立柱变形",{"key":24,"text":288,"correct":22},"冠梁变形",{"key":27,"text":290,"correct":22},"地表沉降",{"key":30,"text":292,"correct":22},"支撑梁变形",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":30,"analysis":33},1125237,"地铁基坑围护墙体竖向变位不会影响到( )。",[297,299,300,302],{"key":20,"text":298,"correct":22},"基坑稳定",{"key":24,"text":290,"correct":22},{"key":27,"text":301,"correct":22},"墙体稳定",{"key":30,"text":303,"correct":32},"坑底塌陷",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1125238,"不属于稳定深基坑坑底的方法是( )。",[308,310,312,314],{"key":20,"text":309,"correct":22},"增加围护结构入土深度",{"key":24,"text":311,"correct":32},"增加围护结构和支撑的刚度",{"key":27,"text":313,"correct":22},"坑底土体加固",{"key":30,"text":315,"correct":22},"坑内井点降水",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},1125239,"将结构断面分成两个部分，即上下两个工作面，分步开挖的浅埋暗挖施工方法称为( )。",[320,322,324,326],{"key":20,"text":321,"correct":32},"台阶法",{"key":24,"text":323,"correct":22},"全断面法",{"key":27,"text":325,"correct":22},"中洞法",{"key":30,"text":327,"correct":22},"单侧壁导坑法",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},1125240,"全断面法适用于地质条件好的地层，围岩必须有足够的（）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"强度",{"key":24,"text":335,"correct":32},"自稳能力",{"key":27,"text":337,"correct":22},"抵抗变形能力",{"key":30,"text":339,"correct":22},"不透水性",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},1125241,"优点是可以减少开挖对围岩的扰动次数，有利于围岩天然承载拱的形成，工序简单，便于组织小型机械化施工的浅埋暗挖法是( )。",[344,346,347,348],{"key":20,"text":345,"correct":22},"正台阶法",{"key":24,"text":323,"correct":32},{"key":27,"text":327,"correct":22},{"key":30,"text":349,"correct":22},"中隔壁法",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},1125242,"喷锚暗挖法中适用于土质稳定、断面较小的隧道施工，适宜人工开挖或小型机械作业的方法是( )。",[354,356,358,360],{"key":20,"text":355,"correct":32},"全断面开挖法",{"key":24,"text":357,"correct":22},"台阶开挖法",{"key":27,"text":359,"correct":22},"环形开挖预留核心土法",{"key":30,"text":361,"correct":22},"CRD法",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":30,"analysis":33},1125243,"关于隧道全断面暗挖法施工的说法，错误的是（）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"可减少开挖对围岩的扰动次数",{"key":24,"text":369,"correct":22},"围岩必须有足够的自稳能力",{"key":27,"text":371,"correct":22},"自上而下一次开挖成形并及时进行初期支护",{"key":30,"text":373,"correct":32},"适用于地表沉降难于控制的隧道施工",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":30,"analysis":33},1125244,"地下工程断面采用一次开挖成型的施工方法叫做( )。",[378,380,381,383],{"key":20,"text":379,"correct":22},"交叉中隔壁法",{"key":24,"text":327,"correct":22},{"key":27,"text":382,"correct":22},"双侧壁导坑法",{"key":30,"text":355,"correct":32},{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},1125245,"环形开挖预留核心土法，一般将断面分成( )部分。",[388,390,392,394],{"key":20,"text":389,"correct":22},"两",{"key":24,"text":391,"correct":32},"三",{"key":27,"text":393,"correct":22},"四",{"key":30,"text":395,"correct":22},"五",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1125246,"全断面法对地质条件要求严格，围岩必须有足够的( )。",[400,401,402,403],{"key":20,"text":333,"correct":22},{"key":24,"text":335,"correct":32},{"key":27,"text":337,"correct":22},{"key":30,"text":339,"correct":22},{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":27,"analysis":33},1125247,"关于台阶法的说法中，错误的是( )。",[408,410,412,414],{"key":20,"text":409,"correct":22},"灵活多变，适用性强",{"key":24,"text":411,"correct":22},"有足够的作业空间和较快的施工速度",{"key":27,"text":413,"correct":32},"当地层无水、洞跨小于12m时，均可采用该方法",{"key":30,"text":415,"correct":22},"适用于软弱围岩、第四纪沉积地层",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1125248,"适用于断面跨度大、地表沉陷难于控制的软弱松散围岩中的浅埋暗挖施工法是( )。",[420,421,422,423],{"key":20,"text":327,"correct":32},{"key":24,"text":382,"correct":22},{"key":27,"text":323,"correct":22},{"key":30,"text":325,"correct":22},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1125249,"在喷锚暗挖施工中，一般情况下单侧壁导坑法侧壁导坑宽度不宜超过( )倍洞宽，高度以到起拱线为宜。",[428,430,432,434],{"key":20,"text":429,"correct":22},"0.3",{"key":24,"text":431,"correct":32},"0.5",{"key":27,"text":433,"correct":22},"0.7",{"key":30,"text":435,"correct":22},"1.0",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1125250,"CRD工法是在CD工法基础上增设( )而形成的。",[440,442,444,446],{"key":20,"text":441,"correct":32},"临时仰拱",{"key":24,"text":443,"correct":22},"超前小导管",{"key":27,"text":445,"correct":22},"管棚",{"key":30,"text":447,"correct":22},"钢拱架",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},1125251,"双侧壁导坑宽度一般不宜超过断面最大跨度的( )。",[452,454,456,458],{"key":20,"text":453,"correct":32},"1\u002F3",{"key":24,"text":455,"correct":22},"2\u002F5",{"key":27,"text":457,"correct":22},"1\u002F2",{"key":30,"text":459,"correct":22},"2\u002F3",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":30,"analysis":33},1125252,"单侧壁导坑法，侧壁导坑宽度一般不宜超过( )倍洞宽。",[464,466,467,469],{"key":20,"text":465,"correct":22},"0.2",{"key":24,"text":429,"correct":22},{"key":27,"text":468,"correct":22},"0.4",{"key":30,"text":431,"correct":32},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1125253,"在浅埋暗挖法修建隧道及地下工程主要施工方法中，初期支护拆除量少的施工方法是( )。",[474,475,477,478],{"key":20,"text":327,"correct":32},{"key":24,"text":476,"correct":22},"侧洞法",{"key":27,"text":382,"correct":22},{"key":30,"text":379,"correct":22},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},1125254,"喷埋暗挖法的主要开挖方法中沉降大的是（）。",[483,485,486,487],{"key":20,"text":484,"correct":22},"正台阶环形开挖法",{"key":24,"text":361,"correct":22},{"key":27,"text":476,"correct":32},{"key":30,"text":382,"correct":22},{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},1125255,"开挖宽度小于10m的单跨隧道，可采用的施工方法是（）。",[492,493,495,497],{"key":20,"text":357,"correct":32},{"key":24,"text":494,"correct":22},"CD法",{"key":27,"text":496,"correct":22},"PBA法",{"key":30,"text":382,"correct":22},{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},1125256,"浅埋暗挖法中，( )工期最短。",[502,503,504,505],{"key":20,"text":323,"correct":32},{"key":24,"text":345,"correct":22},{"key":27,"text":325,"correct":22},{"key":30,"text":506,"correct":22},"CD工法",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":30,"analysis":33},1125257,"当地层条件差、断面特别大时，浅埋暗挖隧道施工不宜采用( )。",[511,512,514,516],{"key":20,"text":325,"correct":22},{"key":24,"text":513,"correct":22},"柱洞法",{"key":27,"text":515,"correct":22},"洞桩法",{"key":30,"text":323,"correct":32},{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1125258,"全断面法适用于地质条件好的地层、修建跨度不大于( )m的隧道。",[521,523,525,527],{"key":20,"text":522,"correct":22},"6",{"key":24,"text":524,"correct":32},"8",{"key":27,"text":526,"correct":22},"10",{"key":30,"text":528,"correct":22},"12",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":27,"analysis":33},1125259,"浅埋暗挖法的开挖方法中，沉降较大的是（）。",[533,535,537,538],{"key":20,"text":534,"correct":22},"正台阶",{"key":24,"text":536,"correct":22},"CRD工法",{"key":27,"text":506,"correct":32},{"key":30,"text":359,"correct":22},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1125260,"下列喷锚暗挖掘进方式中，结构防水效果差的是( )。",[543,544,545,546],{"key":20,"text":345,"correct":22},{"key":24,"text":476,"correct":32},{"key":27,"text":349,"correct":22},{"key":30,"text":327,"correct":22},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":30,"analysis":33},1125261,"交叉中隔壁法(CRD法)适用于地质条件差的地层、修建跨度不大于( )m的隧道。",[551,553,555,557],{"key":20,"text":552,"correct":22},"14",{"key":24,"text":554,"correct":22},"16",{"key":27,"text":556,"correct":22},"18",{"key":30,"text":75,"correct":32},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1125262,"浅埋暗挖法的主要开挖方法中沉降较小的是( )。",[562,563,564,565],{"key":20,"text":359,"correct":22},{"key":24,"text":361,"correct":32},{"key":27,"text":494,"correct":22},{"key":30,"text":382,"correct":22},{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":30,"analysis":33},1125263,"环形开挖预留核心土法适用于地质条件差的地层、修建跨度不大于( )m的隧道。",[570,571,572,573],{"key":20,"text":522,"correct":22},{"key":24,"text":524,"correct":22},{"key":27,"text":526,"correct":22},{"key":30,"text":528,"correct":32},[575,578,581,584,587,590],{"id":15,"name":576,"category":7,"favorite":577},"领导干部任职前廉政法规知识测试题",92,{"id":579,"name":580,"category":7,"favorite":15},595,"建筑结构与设备",{"id":582,"name":583,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":585,"name":586,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":588,"name":589,"category":7,"favorite":8},534,"BIM工程师",{"id":591,"name":589,"category":7,"favorite":8},535]