[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,14,50,2846,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,213,225,237,249,261,273,285,297,309,321,333,345,357,365,377,389,401,413,425,434,445,453,461,473,485,497,509,520,532,544,556,568,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1125163,1,"单选题","一般情况下，管道的内横截面积至少应是预应力筋净截面积的（）倍。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1．0",false,{"key":24,"text":25,"correct":22},"B","1．5",{"key":27,"text":28,"correct":29},"C","2．0",true,{"key":31,"text":32,"correct":22},"D","2．5","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1125164,"在后张法预应力筋曲线孔道的最低部位宜留( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"压浆孔",{"key":24,"text":41,"correct":29},"排水孔",{"key":27,"text":43,"correct":22},"溢浆孔",{"key":31,"text":45,"correct":22},"排气孔",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1125165,"在同种材料和同一生产工艺条件下，锚具、夹片应以不超过（ ）套为一个验收批。",[50,52,54,56],{"key":20,"text":51,"correct":22},"500",{"key":24,"text":53,"correct":22},"600",{"key":27,"text":55,"correct":22},"800",{"key":31,"text":57,"correct":29},"1000",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1125166,"预应力混凝土不得使用（）水泥。",[62,64,66,68],{"key":20,"text":63,"correct":22},"硅酸盐",{"key":24,"text":65,"correct":22},"普通硅酸盐",{"key":27,"text":67,"correct":22},"矿渣硅酸盐",{"key":31,"text":69,"correct":29},"粉煤灰硅酸盐",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1125167,"预应力混凝土中严禁使用含( )的外加剂。",[74,76,78,80],{"key":20,"text":75,"correct":29},"氯化物",{"key":24,"text":77,"correct":22},"磷酸盐",{"key":27,"text":79,"correct":22},"氮化物",{"key":31,"text":81,"correct":22},"硫酸钠",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1125168,"预应力筋采用镦头锚固时，高强钢丝宜采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"液压冷镦",{"key":24,"text":89,"correct":22},"冷冲镦粗",{"key":27,"text":91,"correct":22},"电热镦粗",{"key":31,"text":93,"correct":22},"电热镦粗+热处理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1125169,"切断预应力筋不得采用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"砂轮锯",{"key":24,"text":101,"correct":22},"切断机",{"key":27,"text":103,"correct":22},"大力剪",{"key":31,"text":105,"correct":29},"电弧切割",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1125170,"用作预应力筋管道的平滑钢管和高密度聚乙烯管，其壁厚不得小于（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"2mm",{"key":24,"text":113,"correct":22},"2．5mm",{"key":27,"text":115,"correct":22},"3mm",{"key":31,"text":117,"correct":22},"3．5mm",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1125171,"土围堰内坡脚与基坑顶边缘的距离不得小于（）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"1．0m",{"key":24,"text":125,"correct":22},"1．1m",{"key":27,"text":127,"correct":22},"1．2m",{"key":31,"text":129,"correct":22},"1．5m",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1125172,"机械挖基时，土围堰堰顶的宽度不宜小于（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"3．5m",{"key":24,"text":137,"correct":29},"3．0m",{"key":27,"text":139,"correct":22},"2．5m",{"key":31,"text":141,"correct":22},"2．0m",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1125173,"现场填筑土围堰的填筑材料不应用（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"黏性土",{"key":24,"text":149,"correct":22},"粉质黏土",{"key":27,"text":151,"correct":22},"砂质黏土",{"key":31,"text":153,"correct":29},"砂土",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1125174,"关于沉入桩准备工作的说法，错误的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"沉桩前应掌握工程地质钻探资料、水文资料和打桩资料",{"key":24,"text":161,"correct":22},"处理地上(下)障碍物，平整场地，并应满足沉桩所需的地面承载力",{"key":27,"text":163,"correct":29},"在城区、居民区等人员密集的场所应根据现场环境状况采取降低噪声措施",{"key":31,"text":165,"correct":22},"用于地下水有侵蚀性的地区或腐蚀性土层的钢桩应按照设计要求做好防腐处理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1125175,"应通过试桩或做沉桩试验后会同监理及设计单位研究确定的沉入桩指标是（）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"贯入度",{"key":24,"text":173,"correct":22},"桩端标高",{"key":27,"text":175,"correct":22},"桩身强度",{"key":31,"text":177,"correct":22},"承载能力",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1125176,"在钻孔灌注桩钻孔过程中，护筒埋设深度应符合有关规定。其顶面宜高出施工水位或地下水位（ ）m,并宜高出施工地面0.3m。",[182,184,186,188],{"key":20,"text":183,"correct":22},"2.5",{"key":24,"text":185,"correct":22},"1.5",{"key":27,"text":187,"correct":22},"0.8",{"key":31,"text":189,"correct":29},"2.0",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1125177,"人工挖孔桩必须在保证施工（）前提下选用。",[194,196,198,200],{"key":20,"text":195,"correct":22},"质量",{"key":24,"text":197,"correct":29},"安全",{"key":27,"text":199,"correct":22},"进度",{"key":31,"text":201,"correct":22},"成本",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1125178,"应慎用射水沉桩的土层是（）。",[206,208,209,211],{"key":20,"text":207,"correct":22},"砂类土",{"key":24,"text":147,"correct":29},{"key":27,"text":210,"correct":22},"碎石土",{"key":31,"text":212,"correct":22},"风化岩",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1125179,"为确保灌注桩顶质量，在桩顶设计标高以上应加灌一定高度，一般不宜小于（）。",[217,219,221,223],{"key":20,"text":218,"correct":29},"0．5m",{"key":24,"text":220,"correct":22},"0．4m",{"key":27,"text":222,"correct":22},"0．3m",{"key":31,"text":224,"correct":22},"0．2m",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1125180,"钻孔埋桩宜用于（）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"砂类土、黏性土",{"key":24,"text":232,"correct":22},"密实的黏性土、砾石、风化岩",{"key":27,"text":234,"correct":22},"软黏土(标准贯入度N＜20)、淤泥质土",{"key":31,"text":236,"correct":29},"黏土、砂土、碎石土且河床覆土较厚的情况",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1125181,"关于承台施工要求的说法，正确的是（）。",[241,243,245,247],{"key":20,"text":242,"correct":29},"承台施工前应检查基桩位置，确认符合设计要求",{"key":24,"text":244,"correct":22},"承台基坑无水，设计无要求，基底可铺10cm厚碎石垫层",{"key":27,"text":246,"correct":22},"承台基坑有渗水，设计无要求，基底应浇筑10cm厚混凝土垫层",{"key":31,"text":248,"correct":22},"水中高桩承台采用套箱法施工时，套箱顶面高程可等于施工期间的最高水位",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1125182,"水平截面积300m2以内的墩台，分块浇筑混凝土时，分块数量不得超过（）块。",[253,255,257,259],{"key":20,"text":254,"correct":22},"6",{"key":24,"text":256,"correct":22},"5",{"key":27,"text":258,"correct":22},"4",{"key":31,"text":260,"correct":29},"3",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1125183,"关于重力式混凝土墩、台分块浇筑时接缝做法，正确的是（）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"应与墩台截面尺寸较小的一边平行，邻层分块接缝应错开，接缝宜做成斜口形",{"key":24,"text":268,"correct":29},"应与墩台截面尺寸较小的一边平行，邻层分块接缝应错开，接缝宜做成企口形",{"key":27,"text":270,"correct":22},"应与墩台截面尺寸较大的一边平行，邻层分块接缝应错开，接缝宜做成斜口形",{"key":31,"text":272,"correct":22},"应与墩台截面尺寸较大的一边平行，邻层分块接缝应错开，接缝宜做成企口形",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},1125184,"柱式墩台模板、支架除应满足强度、刚度要求外，稳定计算中应考虑（）影响。",[277,279,281,283],{"key":20,"text":278,"correct":22},"振捣",{"key":24,"text":280,"correct":22},"冲击",{"key":27,"text":282,"correct":29},"风力",{"key":31,"text":284,"correct":22},"水力",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1125185,"装配式梁，其构件应按安装的先后顺序编号存放，预应力混凝土梁的存放时间不宜超过（）个月，特殊情况下不应超过（）个月。",[289,291,293,295],{"key":20,"text":290,"correct":29},"3、5",{"key":24,"text":292,"correct":22},"4、5",{"key":27,"text":294,"correct":22},"5、6",{"key":31,"text":296,"correct":22},"5、7",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},1125186,"预应力混凝土连续梁合龙宜在一天中气温（ ）时进行。",[301,303,305,307],{"key":20,"text":302,"correct":22},"平均值",{"key":24,"text":304,"correct":22},"最高",{"key":27,"text":306,"correct":22},"为零",{"key":31,"text":308,"correct":29},"最低",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},1125187,"悬浇法施工时，预应力混凝土梁体一般分为（）大部分浇筑",[313,315,317,319],{"key":20,"text":314,"correct":22},"两",{"key":24,"text":316,"correct":22},"三",{"key":27,"text":318,"correct":29},"四",{"key":31,"text":320,"correct":22},"五",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1125188,"为确定悬臂浇筑段前端标高，施工过程中应加强监测，但监测项目不包括（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"挂篮前端的垂直变形值",{"key":24,"text":328,"correct":22},"预拱度",{"key":27,"text":330,"correct":22},"施工中已浇段的实际标高",{"key":31,"text":332,"correct":29},"温度影响",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1125189,"拱形涵施工中，拱上端墙的正确施工顺序是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"由上至下施工",{"key":24,"text":340,"correct":29},"两侧向中间同时、对称施工",{"key":27,"text":342,"correct":22},"由下至上施工",{"key":31,"text":344,"correct":22},"中间向两侧同时、对称施工",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":27,"analysis":33},1125190,"箱涵顶进设备安装的紧后工序是（）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"箱涵制作",{"key":24,"text":352,"correct":22},"监控量测",{"key":27,"text":354,"correct":29},"既有线加固",{"key":31,"text":356,"correct":22},"吃土顶进",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},1125191,"箱涵顶进作业应在地下水位降至基底下（）以下进行，并宜避开雨期施工。",[361,362,363,364],{"key":20,"text":218,"correct":29},{"key":24,"text":220,"correct":22},{"key":27,"text":222,"correct":22},{"key":31,"text":224,"correct":22},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1125192,"后张预应力梁吊装时，设计无要求，其孔道水泥浆的强度一般不低于（）MPa。",[369,371,373,375],{"key":20,"text":370,"correct":22},"22．5",{"key":24,"text":372,"correct":22},"25",{"key":27,"text":374,"correct":22},"27．5",{"key":31,"text":376,"correct":29},"30",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1125193,"地铁车站结构的施工方法不包括( )。",[381,383,385,387],{"key":20,"text":382,"correct":22},"明挖法",{"key":24,"text":384,"correct":22},"喷锚暗挖法",{"key":27,"text":386,"correct":29},"盾构法",{"key":31,"text":388,"correct":22},"盖挖法",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1125194,"下列地铁车站施工顺序中属于明挖法的是( )。",[393,395,397,399],{"key":20,"text":394,"correct":29},"由上向下开挖土石方至设计标高后，自基底由下向上进行结构施工",{"key":24,"text":396,"correct":22},"先建临时结构顶板，再向下开挖基坑至设计标高，由下而上建造主体结构",{"key":27,"text":398,"correct":22},"先建临时结构顶板，根据主体结构层数，自上而下分层挖土与建造主体结构",{"key":31,"text":400,"correct":22},"分块建筑临时结构顶板，再向下开挖基坑至设计标高，由下而上建造主体结构",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1125195,"用于城市街区施工时，可尽快恢复路面，施工难度大、费用高，对道路交通影响较小的施工方法是（）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"明挖顺作法",{"key":24,"text":408,"correct":22},"明挖逆作法",{"key":27,"text":410,"correct":22},"盖挖顺作法",{"key":31,"text":412,"correct":29},"盖挖逆作法",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1125196,"( )关系到明挖法实施的成败",[417,419,421,423],{"key":20,"text":418,"correct":29},"围护结构及其支撑体系",{"key":24,"text":420,"correct":22},"查明地质条件",{"key":27,"text":422,"correct":22},"盾构的性能与质量",{"key":31,"text":424,"correct":22},"盾构控制方法",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1125197,"( )是棚盖结构施做后开挖到基坑底，再从下至上施做底板、边墙，最后完成顶板的施工方法",[429,430,431,432],{"key":20,"text":410,"correct":29},{"key":24,"text":412,"correct":22},{"key":27,"text":406,"correct":22},{"key":31,"text":433,"correct":22},"盖挖半逆作法",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1125198,"下列地铁车站施工顺序中属于盖挖顺作法的是( )。",[438,440,442,443],{"key":20,"text":439,"correct":22},"盖挖顺做法是棚盖结构施做后开挖到基坑底，再从上至下工",{"key":24,"text":441,"correct":29},"先构筑连续墙、构筑中间支承柱，再构筑连续墙及覆盖板，开挖及支撑安装，开挖及构筑底板、构筑侧墙及顶板",{"key":27,"text":398,"correct":22},{"key":31,"text":444,"correct":22},"构筑连续墙中间支承柱及临时性挡土设备，再构筑顶板，打设中间桩、临时性挡土及构筑顶板",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},1125199,"为尽快恢复路面交通，城市街区地铁车站施工采用最多的方法是( )。",[449,450,451,452],{"key":20,"text":382,"correct":22},{"key":24,"text":410,"correct":22},{"key":27,"text":412,"correct":29},{"key":31,"text":433,"correct":22},{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},1125200,"基坑开挖一段后先浇筑顶板，在顶板保护下，自上而下开挖、浇筑结构内衬的施工方法称为( )。",[457,458,459,460],{"key":20,"text":406,"correct":22},{"key":24,"text":408,"correct":22},{"key":27,"text":410,"correct":22},{"key":31,"text":412,"correct":29},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1125201,"盖挖逆作法是基坑开挖一段后先浇筑顶板，在顶板的保护下，( )的施工方法。",[465,467,469,471],{"key":20,"text":466,"correct":22},"自上而下开挖、支撑，由下向上浇筑结构内衬",{"key":24,"text":468,"correct":29},"自上而下开挖、支撑和浇筑结构内衬",{"key":27,"text":470,"correct":22},"由一侧向另一侧开挖、支撑和浇筑结构内衬",{"key":31,"text":472,"correct":22},"由中间向两侧开挖、支撑和浇筑结构内衬",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":27,"analysis":33},1125202,"浅埋暗挖法与“新奥法”的主要区别在于是否( )。",[477,479,481,483],{"key":20,"text":478,"correct":22},"采用超前注浆加固",{"key":24,"text":480,"correct":22},"根据土质确定合适的开挖进尺",{"key":27,"text":482,"correct":29},"利用围岩的自承能力",{"key":31,"text":484,"correct":22},"及时支护",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1125203,"在城镇交通要道区域采用盖挖法施工的地铁车站多采用( )结构。",[489,491,493,495],{"key":20,"text":490,"correct":22},"拱形",{"key":24,"text":492,"correct":22},"双拱形",{"key":27,"text":494,"correct":22},"三拱形",{"key":31,"text":496,"correct":29},"矩形框架",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},1125204,"关于盾构法施工隧道存在问题的说法，正确的是( )。",[501,503,505,507],{"key":20,"text":502,"correct":29},"当隧道曲线半径过小时，施工较为困难",{"key":24,"text":504,"correct":22},"隧道的施工费用受覆土量多少影响",{"key":27,"text":506,"correct":22},"风雨等气候条件影响隧道施工",{"key":31,"text":508,"correct":22},"隧道穿过河底或其他建筑物时，影响施工",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},1125205,"明挖法施工的地铁区间隧道结构通常采用( )断面。",[513,515,517,519],{"key":20,"text":514,"correct":22},"梯形",{"key":24,"text":516,"correct":29},"矩形",{"key":27,"text":518,"correct":22},"圆形",{"key":31,"text":490,"correct":22},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":27,"analysis":33},1125206,"盾构在地层中沿着设计轴线推进，在推进的同时不断出土和安装（）衬砌。",[524,526,528,530],{"key":20,"text":525,"correct":22},"复合式",{"key":24,"text":527,"correct":22},"整体式",{"key":27,"text":529,"correct":29},"管片",{"key":31,"text":531,"correct":22},"喷锚支护",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":27,"analysis":33},1125207,"( )是盾构法隧道衬砌中最常用的管片类型",[536,538,540,542],{"key":20,"text":537,"correct":22},"A型管片",{"key":24,"text":539,"correct":22},"B型管片",{"key":27,"text":541,"correct":29},"钢筋混凝土管片",{"key":31,"text":543,"correct":22},"K型管片",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1125208,"属于盾构法修建的区间隧道的衬砌是( )。",[548,550,552,554],{"key":20,"text":549,"correct":22},"复合式衬砌",{"key":24,"text":551,"correct":29},"预制装配式衬砌",{"key":27,"text":553,"correct":22},"整体式衬砌",{"key":31,"text":555,"correct":22},"单层衬砌",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1125209,"喷锚暗挖法施工隧道的复合式衬砌结构中的主要承载单元是( )。",[560,562,564,566],{"key":20,"text":561,"correct":29},"初期支护",{"key":24,"text":563,"correct":22},"防水隔离层",{"key":27,"text":565,"correct":22},"二次衬砌",{"key":31,"text":567,"correct":22},"围岩",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},1125210,"喷锚暗挖（矿山）法施工隧道的衬砌主要为( )衬砌。",[572,573,575,577],{"key":20,"text":525,"correct":29},{"key":24,"text":574,"correct":22},"单层喷锚支护",{"key":27,"text":576,"correct":22},"等截面直墙式",{"key":31,"text":578,"correct":22},"变截面曲墙式",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":27,"analysis":33},1125211,"以下关于软土基坑开挖基本规定说法错误的是( )。",[583,585,587,589],{"key":20,"text":584,"correct":22},"必须分层、分块、均衡地开挖",{"key":24,"text":586,"correct":22},"分块开挖后必须及时施工支撑",{"key":27,"text":588,"correct":29},"必须按设计要求对围檩施加预应力",{"key":31,"text":590,"correct":22},"必须按设计要求施加预应力",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},1125212,"关于软土基坑开挖基本规定，说法错误的是( )。",[595,596,598,600],{"key":20,"text":584,"correct":22},{"key":24,"text":597,"correct":29},"分块开挖后可以不需要施工支撑",{"key":27,"text":599,"correct":22},"必须按设计要求对钢支撑施加预应力",{"key":31,"text":601,"correct":22},"对于有预应力要求的锚杆，必须按设计要求对锚杆施加预应力",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]