[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,13,50,2846,[13,34,46,58,69,81,93,105,117,129,141,153,165,176,188,200,212,222,234,246,256,268,280,292,304,316,328,340,352,364,376,388,400,412,424,436,446,458,470,482,494,506,515,527,537,545,557,569,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1125113,1,"单选题","关于重力式混凝土墩、台分块浇筑时接缝做法，正确的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","应与墩台截面尺寸较小的一边平行，邻层分块接缝应错开，接缝宜做成斜口形",false,{"key":24,"text":25,"correct":26},"B","应与墩台截面尺寸较小的一边平行,邻层分块接缝应错开，接缝宜做成企口形",true,{"key":28,"text":29,"correct":22},"C","应与墩台截面尺寸较大的一边平行,邻层分块接缝应错开，接缝宜做成斜口形",{"key":31,"text":32,"correct":22},"D","应与墩台截面尺寸较大的一边平行,邻层分块接缝应错开，接缝宜做成企口形","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1125114,"水平截面积300㎡以内的墩台，分块浇筑混凝土时，分块数量不得超过( )块。",[38,40,42,44],{"key":20,"text":39,"correct":22},"6",{"key":24,"text":41,"correct":22},"5",{"key":28,"text":43,"correct":22},"4",{"key":31,"text":45,"correct":26},"3",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1125115,"钢管混凝土墩柱应采用( )混凝土，一次连续浇筑完成。",[50,52,54,56],{"key":20,"text":51,"correct":26},"补偿收缩",{"key":24,"text":53,"correct":22},"自流平",{"key":28,"text":55,"correct":22},"速凝",{"key":31,"text":57,"correct":22},"早强",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1125116,"桥梁的钢管混凝土墩柱应采用( )混凝土，一次连续浇筑完成。",[62,64,66,67],{"key":20,"text":63,"correct":22},"高强",{"key":24,"text":65,"correct":22},"高性能",{"key":28,"text":51,"correct":26},{"key":31,"text":68,"correct":22},"免振捣",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1125117,"墩台水平截面积为280m2，在进行分块的时候可以划分为（）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"2块",{"key":24,"text":76,"correct":26},"3块",{"key":28,"text":78,"correct":22},"4块",{"key":31,"text":80,"correct":22},"5块",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},1125118,"在城镇交通繁华路段施工盖梁时，宜采用( )，以减少占路时间。",[85,87,89,91],{"key":20,"text":86,"correct":22},"快装组合模板、门式支架",{"key":24,"text":88,"correct":26},"整体组装模板、快装组合支架",{"key":28,"text":90,"correct":22},"整体组装模板、碗扣式支架",{"key":31,"text":92,"correct":22},"快装组合模板、贝雷支架",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":28,"analysis":33},1125119,"预应力悬臂盖梁混凝土浇筑和底模拆除要求，说法正确的是( )。",[97,99,101,103],{"key":20,"text":98,"correct":22},"混凝土浇筑从固定端开始；孔道压浆强度达到设计强度后，拆除底模板",{"key":24,"text":100,"correct":22},"混凝土浇筑从固定端开始；孔道压浆强度达到设计强度80%后，拆除底模板",{"key":28,"text":102,"correct":26},"混凝土浇筑从悬臂端开始；孔道压浆强度达到设计强度后，拆除底模板",{"key":31,"text":104,"correct":22},"混凝土浇筑从悬臂端开始；孔道压浆强度达到设计强度80%后，拆除底模板",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1125120,"柱式墩台模板、支架除应满足强度、刚度要求外，稳定计算中应考虑( )影响。",[109,111,113,115],{"key":20,"text":110,"correct":22},"振捣",{"key":24,"text":112,"correct":22},"冲击",{"key":28,"text":114,"correct":26},"风力",{"key":31,"text":116,"correct":22},"水力",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},1125121,"下列装配式梁（板）安装方法中，不属于梁板架设方法的是( )。",[121,123,125,127],{"key":20,"text":122,"correct":22},"起重机架梁法",{"key":24,"text":124,"correct":22},"跨墩龙门吊架梁法",{"key":28,"text":126,"correct":26},"架桥机悬拼法",{"key":31,"text":128,"correct":22},"穿巷式架桥机架梁法",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},1125122,"吊装预制梁时，吊绳与梁的夹宜采（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"10°～30°",{"key":24,"text":136,"correct":22},"20°～40°",{"key":28,"text":138,"correct":22},"30°～60°",{"key":31,"text":140,"correct":26},"60°～90°",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1125123,"吊装梁长25m以上的预应力简支梁前，应验算裸梁的( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"抗弯性能",{"key":24,"text":148,"correct":26},"稳定性能",{"key":28,"text":150,"correct":22},"抗剪性能",{"key":31,"text":152,"correct":22},"抗扭性能",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},1125124,"吊装时构件的吊环应顺直，吊绳与起吊构件的交角小于（）度时，应设置吊架或吊装扁担。",[157,159,161,163],{"key":20,"text":158,"correct":22},"30°",{"key":24,"text":160,"correct":22},"40°",{"key":28,"text":162,"correct":22},"50°",{"key":31,"text":164,"correct":26},"60°",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},1125125,"预制梁板吊装时，吊绳与梁板的交角为( )时，应设置吊架或吊装扁担。",[169,171,172,174],{"key":20,"text":170,"correct":26},"45°",{"key":24,"text":164,"correct":22},{"key":28,"text":173,"correct":22},"75°",{"key":31,"text":175,"correct":22},"90°",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1125126,"吊装移运装配式桥梁构件时，吊绳与起吊构件的交角( )时应设置吊架或扁担，尽可能使吊环垂直受力。",[180,182,184,186],{"key":20,"text":181,"correct":22},"大于60°",{"key":24,"text":183,"correct":26},"小于60°",{"key":28,"text":185,"correct":22},"不大于60°",{"key":31,"text":187,"correct":22},"不小于60°",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},1125127,"装配式桥梁构件在脱底模、移运、吊装时，混凝土的强度不应低于设计所要求的吊装强度，一般不得低于设计强度的( )。",[192,194,196,198],{"key":20,"text":193,"correct":22},"65%",{"key":24,"text":195,"correct":22},"70%",{"key":28,"text":197,"correct":26},"75%",{"key":31,"text":199,"correct":22},"80%",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1125128,"预应力混凝土构件吊装时，其孔道水泥浆的强度不应低于构件的设计要求，如设计无要求，一般不低于( )MPa。",[204,206,208,210],{"key":20,"text":205,"correct":22},"10",{"key":24,"text":207,"correct":22},"20",{"key":28,"text":209,"correct":22},"25",{"key":31,"text":211,"correct":26},"30",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},1125129,"后张预应力梁吊装时，设计无要求，其孔道水泥浆的强度一般不低于( )MPa。",[216,218,219,221],{"key":20,"text":217,"correct":22},"22.5",{"key":24,"text":209,"correct":22},{"key":28,"text":220,"correct":22},"27.5",{"key":31,"text":211,"correct":26},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1125130,"用移动模架法浇筑预应力混凝土连续梁时，分段工作缝必须设在( )附近。",[226,228,230,232],{"key":20,"text":227,"correct":26},"弯矩零点",{"key":24,"text":229,"correct":22},"弯矩最大点",{"key":28,"text":231,"correct":22},"剪力零点",{"key":31,"text":233,"correct":22},"扭矩零点",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},1125131,"下列关于支架法现浇预应力混凝土连续梁施工技术表述中，错误的是（）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"支架的地基承载力应符合要求",{"key":24,"text":241,"correct":22},"架底部应有良好的排水措施，不得被水浸泡",{"key":28,"text":243,"correct":26},"安装支架时，应根据架消除拼装间隙和地基沉降等，设置预拱度",{"key":31,"text":245,"correct":22},"各种支架和模板安装后，宜采取预压力法消除拼装间隙和地基沉降等非弹性变形",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1125132,"在移动模架上浇筑预应力混凝土连续梁时，浇筑分段工作缝必须设在( )附近。",[250,251,253,255],{"key":20,"text":227,"correct":26},{"key":24,"text":252,"correct":22},"1\u002F4最大弯矩点",{"key":28,"text":254,"correct":22},"1\u002F2最大弯矩点",{"key":31,"text":229,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},1125133,"现浇预应力钢筋混凝土连续梁，支架和模板安装后，宜采取预压方法消除( )。",[260,262,264,266],{"key":20,"text":261,"correct":26},"非弹性变形",{"key":24,"text":263,"correct":22},"弹性变形",{"key":28,"text":265,"correct":22},"塑性变形",{"key":31,"text":267,"correct":22},"支架空隙",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},1125134,"关于桥梁悬臂浇筑法施工的说法，错误的是（）。",[272,274,276,278],{"key":20,"text":273,"correct":26},"浇筑混凝土时，宜从与前段混凝土连接端开始，最后结束于悬臂前端",{"key":24,"text":275,"correct":22},"中跨合龙段应最后浇筑，混凝土强度宜提高一级",{"key":28,"text":277,"correct":22},"桥墩两侧梁段悬臂施工应对称进行",{"key":31,"text":279,"correct":22},"连续梁的梁跨体系转换应在解除各墩临时固结后进行",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},1125135,"现浇预应力混凝土连续梁采用悬臂浇筑施工，合龙顺序一般是( )。",[284,286,288,290],{"key":20,"text":285,"correct":22},"先中跨、后次跨、再边跨",{"key":24,"text":287,"correct":22},"先次跨、后边跨、再中跨",{"key":28,"text":289,"correct":26},"先边跨、后次跨、再中跨",{"key":31,"text":291,"correct":22},"先边跨、后中跨、再次跨",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1125136,"关于悬臂浇筑混凝土连续梁合龙的说法，错误的是( )。",[296,298,300,302],{"key":20,"text":297,"correct":22},"合龙顺序一般是先边跨，后次跨，再中跨",{"key":24,"text":299,"correct":22},"合龙段长度宜为2m",{"key":28,"text":301,"correct":26},"合龙宜在一天中气温最高时进行",{"key":31,"text":303,"correct":22},"合龙段混凝土强度宜提高一级",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":31,"analysis":33},1125137,"预应力混凝土连续梁悬臂浇筑施工中，顶、腹板纵向预应力筋的张拉顺序一般为( )张拉，设计有要求时按设计要求。",[308,310,312,314],{"key":20,"text":309,"correct":22},"上左、下右对称",{"key":24,"text":311,"correct":22},"左右对称",{"key":28,"text":313,"correct":22},"右上、左下对称",{"key":31,"text":315,"correct":26},"上下、左右对称",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1125138,"为确定悬臂浇筑段前段标高，施工过程中应加强监测，但监测项目不包括( )。",[320,322,324,326],{"key":20,"text":321,"correct":22},"挂篮前端的垂直变形值",{"key":24,"text":323,"correct":22},"预拱度",{"key":28,"text":325,"correct":22},"施工中已浇段的实际标高",{"key":31,"text":327,"correct":26},"温度影响",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":28,"analysis":33},1125139,"悬浇法施工时，预应力混凝土梁体一般分为( )大部分浇筑。",[332,334,336,338],{"key":20,"text":333,"correct":22},"两",{"key":24,"text":335,"correct":22},"三",{"key":28,"text":337,"correct":26},"四",{"key":31,"text":339,"correct":22},"五",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},1125140,"拱形涵拱圈和拱上端墙应( )施工。",[344,346,348,350],{"key":20,"text":345,"correct":22},"由中间向两侧同时、对称",{"key":24,"text":347,"correct":26},"由两侧向中间同时、对称",{"key":28,"text":349,"correct":22},"顺时针方向",{"key":31,"text":351,"correct":22},"逆时针方向",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1125141,"在填土路堤涵洞两侧填土，应采用( )分层仔细夯实。",[356,358,360,362],{"key":20,"text":357,"correct":22},"膨胀土、对称",{"key":24,"text":359,"correct":26},"非膨胀土、对称",{"key":28,"text":361,"correct":22},"膨胀土、单侧偏推",{"key":31,"text":363,"correct":22},"非膨胀土、单侧偏推",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},1125142,"拱形涵、盖板涵两侧主结构防水层的保护层砌筑砂浆强度达到( )才能回填土。",[368,370,372,374],{"key":20,"text":369,"correct":22},"1.5MPa",{"key":24,"text":371,"correct":22},"2MPa",{"key":28,"text":373,"correct":22},"2.5MPa",{"key":31,"text":375,"correct":26},"3MPa",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1125143,"涵洞两侧的回填土应对称进行，高差不宜超过( )。",[380,382,384,386],{"key":20,"text":381,"correct":26},"300mm",{"key":24,"text":383,"correct":22},"350mm",{"key":28,"text":385,"correct":22},"400mm",{"key":31,"text":387,"correct":22},"450mm",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},1125144,"当新辟道路必须从铁路、道路路基下通过时，对原有路线采取必要的加固措施后，可采取( )施工通道管涵。",[392,394,396,398],{"key":20,"text":393,"correct":26},"顶进法",{"key":24,"text":395,"correct":22},"顶入法",{"key":28,"text":397,"correct":22},"支撑法",{"key":31,"text":399,"correct":22},"承插法",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},1125145,"箱涵顶进作业应在地下水位降至基底以下( )进行，并宜避开雨期施工。",[404,406,408,410],{"key":20,"text":405,"correct":26},"0.5m",{"key":24,"text":407,"correct":22},"0.4m",{"key":28,"text":409,"correct":22},"0.3m",{"key":31,"text":411,"correct":22},"0.2m",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},1125146,"测量工作对箱涵顶进很重要，必须( )，做好记录并报告现场指挥。",[416,418,420,422],{"key":20,"text":417,"correct":22},"每一顶程测量一次各观测点高程偏差值",{"key":24,"text":419,"correct":22},"每一顶程测量一次各观测点左、右偏差值",{"key":28,"text":421,"correct":22},"每一顶程测量一次各观测点高程偏差值和左、右偏差值",{"key":31,"text":423,"correct":26},"每一顶程测量一次各观测点高程偏差值，左、右偏差值和顶程及总进尺",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1125147,"按上部结构的行车道位置分，桥可以分为（ ）",[428,430,432,434],{"key":20,"text":429,"correct":26},"上承式、中承式、下承式",{"key":24,"text":431,"correct":22},"跨河桥、跨线桥",{"key":28,"text":433,"correct":22},"高架桥、栈桥",{"key":31,"text":435,"correct":22},"人行桥、运水桥",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1125148,"多孔跨径的全长不到（ ）m的泄水结构物，称为涵洞。",[440,441,442,444],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":28,"text":443,"correct":22},"7",{"key":31,"text":445,"correct":26},"8",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1125149,"下列桥梁类型中，属于按用途进行分类的是（）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"石拱桥",{"key":24,"text":453,"correct":26},"人行桥",{"key":28,"text":455,"correct":22},"特大桥",{"key":31,"text":457,"correct":22},"刚架桥",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1125150,"钢框胶合板模板的组配面板宜采用( )布置。",[462,464,466,468],{"key":20,"text":463,"correct":22},"通缝",{"key":24,"text":465,"correct":22},"直缝",{"key":28,"text":467,"correct":22},"斜缝",{"key":31,"text":469,"correct":26},"错缝",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1125151,"对用于搭设支架的地基的要求中，错误的是( )。",[474,476,478,480],{"key":20,"text":475,"correct":22},"必须有足够承载力",{"key":24,"text":477,"correct":22},"严禁被水浸泡",{"key":28,"text":479,"correct":26},"必须满铺钢板",{"key":31,"text":481,"correct":22},"冬期施工必须采取防冻胀措施",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},1125152,"即使普通混凝土受拉构件中的主钢筋直径Φ≤22mm，也不得采用( )连接。",[486,488,490,492],{"key":20,"text":487,"correct":22},"焊接",{"key":24,"text":489,"correct":22},"挤压套筒",{"key":28,"text":491,"correct":26},"绑扎",{"key":31,"text":493,"correct":22},"直螺纹",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},1125153,"下列钢筋骨架制作和组装的规定中，不符合规范要求的是( )。",[498,500,502,504],{"key":20,"text":499,"correct":22},"钢筋骨架的焊接应在坚固的工作台上进行",{"key":24,"text":501,"correct":22},"组装时应按设计图纸放大样，放样时应考虑骨架预拱度",{"key":28,"text":503,"correct":22},"简支梁钢筋骨架预拱度应符合设计和规范规定",{"key":31,"text":505,"correct":26},"骨架接长焊接时，不同直径钢筋的边线应在同一平面上",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},1125154,"钢筋接头部位横向净距不得小于钢筋直径，且不得小于（ ）mm。",[510,511,513,514],{"key":20,"text":207,"correct":22},{"key":24,"text":512,"correct":22},"15",{"key":28,"text":209,"correct":26},{"key":31,"text":205,"correct":22},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1125155,"热轧钢筋焊接接头应优先选择（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":22},"电阻点焊",{"key":24,"text":522,"correct":26},"闪光对焊",{"key":28,"text":524,"correct":22},"埋弧压力焊",{"key":31,"text":526,"correct":22},"电弧焊",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},1125156,"在混凝土生产过程中，对砂石料的含水率的检测，每一工作班不应少于( )次。",[531,533,535,536],{"key":20,"text":532,"correct":26},"1",{"key":24,"text":534,"correct":22},"2",{"key":28,"text":45,"correct":22},{"key":31,"text":43,"correct":22},{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1125157,"混凝土拌合物坍落度的检测，每一工作班或每一单元结构物不应少于( )次。",[541,542,543,544],{"key":20,"text":532,"correct":22},{"key":24,"text":534,"correct":26},{"key":28,"text":45,"correct":22},{"key":31,"text":43,"correct":22},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1125158,"混凝土运输、浇筑及间歇的全部时间不应超过混凝土的（）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"养护时间",{"key":24,"text":552,"correct":26},"初凝时间",{"key":28,"text":554,"correct":22},"振捣延续时间",{"key":31,"text":556,"correct":22},"终凝时间",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1125159,"搅拌时间是混凝土拌合时的重要控制参数，在使用机械搅拌时，它是指( )。",[561,563,565,567],{"key":20,"text":562,"correct":22},"自全部骨料装入搅拌机开始搅拌起，至开始卸料时止，延续搅拌的最短时间",{"key":24,"text":564,"correct":22},"自水泥装入搅拌机开始搅拌起，至开始卸料时止，延续搅拌的最短时间",{"key":28,"text":566,"correct":22},"自全部胶结料装入搅拌机开始搅拌起，至开始卸料时止，延续搅拌的最短时间",{"key":31,"text":568,"correct":26},"自全部材料装入搅拌机开始搅拌起，至开始卸料时止，延续搅拌的最短时间",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},1125160,"对掺用缓凝型外加剂或有抗渗等要求的混凝土，洒水养护时间应不少于（ ）d。",[573,574,575,577],{"key":20,"text":205,"correct":22},{"key":24,"text":443,"correct":22},{"key":28,"text":576,"correct":22},"28",{"key":31,"text":578,"correct":26},"14",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},1125161,"当空气中盐分过大时，从穿完预应力筋至孔道灌浆完成的时间应控制在（）之内。",[583,585,587,589],{"key":20,"text":584,"correct":26},"7d",{"key":24,"text":586,"correct":22},"10d",{"key":28,"text":588,"correct":22},"15d",{"key":31,"text":590,"correct":22},"20d",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":31,"analysis":33},1125162,"23m长的钢绞线束移运时至少应设支点（）个。",[595,596,597,598],{"key":20,"text":41,"correct":22},{"key":24,"text":39,"correct":22},{"key":28,"text":443,"correct":22},{"key":31,"text":445,"correct":26},[600,603,606,609,612,615],{"id":15,"name":601,"category":7,"favorite":602},"领导干部任职前廉政法规知识测试题",92,{"id":604,"name":605,"category":7,"favorite":15},595,"建筑结构与设备",{"id":607,"name":608,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":610,"name":611,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":613,"name":614,"category":7,"favorite":8},534,"BIM工程师",{"id":616,"name":614,"category":7,"favorite":8},535]