[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,12,50,2846,[13,34,46,57,69,81,91,100,112,124,136,148,160,172,184,195,207,219,231,243,255,267,279,288,296,308,316,328,340,352,364,376,388,400,412,423,435,447,459,471,482,494,506,518,529,541,553,565,577,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1125061,1,"单选题","用作预应力筋管道的平滑钢管和高密度聚乙烯管，其壁厚不得小于( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2mm",true,{"key":24,"text":25,"correct":26},"B","2.5mm",false,{"key":28,"text":29,"correct":26},"C","3mm",{"key":31,"text":32,"correct":26},"D","3.5mm","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1125062,"在桥梁的某些特殊部位，设计无要求时，可采用符合要求的平滑钢管或高密度聚 乙烯管，其管壁厚不得小于( )mm",[38,40,42,44],{"key":20,"text":39,"correct":26},"3",{"key":24,"text":41,"correct":26},"4",{"key":28,"text":43,"correct":26},"5",{"key":31,"text":45,"correct":22},"2",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1125063,"预应力锚具夹具和连接器进行外观检查时，应从每批中抽取10％的锚具且不少于( )套，检查其外观和尺寸。",[50,51,53,55],{"key":20,"text":43,"correct":26},{"key":24,"text":52,"correct":26},"20",{"key":28,"text":54,"correct":22},"10",{"key":31,"text":56,"correct":26},"30",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":20,"analysis":33},1125064,"配制预应力结构的砼时应优先采用( )。",[61,63,65,67],{"key":20,"text":62,"correct":22},"普通硅酸盐水泥",{"key":24,"text":64,"correct":26},"矿渣硅酸盐水泥",{"key":28,"text":66,"correct":26},"火山灰质硅酸盐灰水泥",{"key":31,"text":68,"correct":26},"粉煤灰质硅酸盐灰水泥",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},1125065,"预应力混凝土不得使用( )水泥。",[73,75,77,79],{"key":20,"text":74,"correct":26},"硅酸盐",{"key":24,"text":76,"correct":26},"普通硅酸盐",{"key":28,"text":78,"correct":26},"矿渣硅酸盐",{"key":31,"text":80,"correct":22},"粉煤灰硅酸盐",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":20,"analysis":33},1125066,"配制预应力混凝土时应优先采用( )。",[85,86,87,89],{"key":20,"text":62,"correct":22},{"key":24,"text":64,"correct":26},{"key":28,"text":88,"correct":26},"火山灰质硅酸盐水泥",{"key":31,"text":90,"correct":26},"粉煤灰质硅酸盐水泥",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},1125067,"预应力混凝土应优先采用（）水泥。",[95,97,98,99],{"key":20,"text":96,"correct":26},"火山灰质硅酸盐",{"key":24,"text":74,"correct":22},{"key":28,"text":78,"correct":26},{"key":31,"text":80,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":31,"analysis":33},1125068,"预应力混凝土中的水泥用量不宜大于( )㎏\u002Fm3。",[104,106,108,110],{"key":20,"text":105,"correct":26},"300",{"key":24,"text":107,"correct":26},"350",{"key":28,"text":109,"correct":26},"400",{"key":31,"text":111,"correct":22},"550",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":31,"analysis":33},1125070,"后张法预应力混凝土梁施工中，曲线预应力孔道最低点宜设置( )。",[116,118,120,122],{"key":20,"text":117,"correct":26},"压浆孔",{"key":24,"text":119,"correct":26},"溢浆孔",{"key":28,"text":121,"correct":26},"排气孔",{"key":31,"text":123,"correct":22},"排水孔",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":24,"analysis":33},1125071,"关于预应力施工的说法，错误的是（）。",[128,130,132,134],{"key":20,"text":129,"correct":26},"预应力筋实际伸长值与理论伸长值之差应控制在±6%以内",{"key":24,"text":131,"correct":22},"后张法张拉台座应具有足够的强度和刚度，抗滑移安全系数不得小于1.6",{"key":28,"text":133,"correct":26},"后张法曲线孔道的波峰部位应留排气孔",{"key":31,"text":135,"correct":26},"曲线预应力筋宜在两端张拉",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1125073,"桥梁施工中后张预应力筋不包括( )。",[140,142,144,146],{"key":20,"text":141,"correct":26},"高强度钢丝",{"key":24,"text":143,"correct":22},"热轧带肋钢筋",{"key":28,"text":145,"correct":26},"精轧螺纹钢筋",{"key":31,"text":147,"correct":26},"钢绞线",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},1125074,"当空气中盐分过大时，从穿完预应力筋至孔道灌浆完成的时间应控制在( )之内。",[152,154,156,158],{"key":20,"text":153,"correct":22},"7d",{"key":24,"text":155,"correct":26},"10d",{"key":28,"text":157,"correct":26},"15d",{"key":31,"text":159,"correct":26},"20d",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":24,"analysis":33},1125075,"预应力筋张拉后，应及时进行孔道压浆。孔道压浆宜采用( )。",[164,166,168,170],{"key":20,"text":165,"correct":26},"石灰浆液",{"key":24,"text":167,"correct":22},"水泥浆",{"key":28,"text":169,"correct":26},"水泥砂浆",{"key":31,"text":171,"correct":26},"水玻璃浆",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1125076,"后张法预应力施工中，预应力筋张拉后应及时进行孔道压浆，下列关于孔道压浆说法错误的是( )。",[176,178,180,182],{"key":20,"text":177,"correct":26},"当白天气温高于35℃时，压浆宜在夜间进行",{"key":24,"text":179,"correct":22},"压浆完成24h以后，结构混凝土的温度可以低于5℃",{"key":28,"text":181,"correct":26},"压浆作业每一工班应留取不少于3组砂浆试块，标养28d",{"key":31,"text":183,"correct":26},"水泥浆的强度应符合设计要求，设计无要求时不得低于30MPa",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":31,"analysis":33},1125077,"对孔道已压浆的预应力混凝土构件，其孔道水泥浆的强度不应低于设计要求，如无设计规定时，不得低于( )MPa。",[188,190,192,194],{"key":20,"text":189,"correct":26},"17.6",{"key":24,"text":191,"correct":26},"25",{"key":28,"text":193,"correct":26},"27.8",{"key":31,"text":56,"correct":22},{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":20,"analysis":33},1125078,"孔道压浆宜采用水泥浆。水泥浆的强度应符合设计要求，设计无要求时不得低于( )。",[199,201,203,205],{"key":20,"text":200,"correct":22},"30MPa",{"key":24,"text":202,"correct":26},"25MPa",{"key":28,"text":204,"correct":26},"20MPa",{"key":31,"text":206,"correct":26},"15MPa",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},1125079,"当铺设防水卷材时，环境气温和卷材的温度应高于（ ）",[211,213,215,217],{"key":20,"text":212,"correct":26},"-10℃",{"key":24,"text":214,"correct":26},"-5℃",{"key":28,"text":216,"correct":26},"0℃",{"key":31,"text":218,"correct":22},"5℃",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1125080,"下列关于铺设防水卷材的做法，错误的是（ ）",[223,225,227,229],{"key":20,"text":224,"correct":26},"防水卷材应平整顺直，搭接尺寸应准确，不得扭曲、皱褶",{"key":24,"text":226,"correct":22},"卷材的展开方向应与车车辆的运行方向垂直",{"key":28,"text":228,"correct":26},"卷材应采用沿桥梁纵、横坡从低处向高处的铺设方法",{"key":31,"text":230,"correct":26},"高处卷材应压在低处卷材之上",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},1125081,"混凝土基层检测一般项目是( ）",[235,237,239,241],{"key":20,"text":236,"correct":26},"含水率",{"key":24,"text":238,"correct":26},"粗糙度",{"key":28,"text":240,"correct":26},"平整度",{"key":31,"text":242,"correct":22},"外观质量",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1125082,"土围堰内坡脚与基坑项边缘的距离根据河床土质及基坑开挖深度而定，但不得小于( )。",[247,249,251,253],{"key":20,"text":248,"correct":22},"1m",{"key":24,"text":250,"correct":26},"1.1m",{"key":28,"text":252,"correct":26},"1.2m",{"key":31,"text":254,"correct":26},"1.5m",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},1125083,"大型河流的深水基础，覆盖层较薄、平坦的岩石河床宜使用( )。",[259,261,263,265],{"key":20,"text":260,"correct":26},"土袋围堰",{"key":24,"text":262,"correct":26},"堆石土围堰",{"key":28,"text":264,"correct":26},"钢板桩围堰",{"key":31,"text":266,"correct":22},"双壁围堰",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":28,"analysis":33},1125084,"适用于黏性土、砂类土及碎石类土河床的围堰是( )。",[271,273,275,277],{"key":20,"text":272,"correct":26},"竹、铅丝笼围堰",{"key":24,"text":274,"correct":26},"双壁钢围堰",{"key":28,"text":276,"correct":22},"钢筋混凝土板桩围堰",{"key":31,"text":278,"correct":26},"套箱围堰",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":28,"analysis":33},1125085,"适用于各类土（包括强风化岩）的深水基坑围堰是( )。",[283,284,286,287],{"key":20,"text":278,"correct":26},{"key":24,"text":285,"correct":26},"土围堰",{"key":28,"text":264,"correct":22},{"key":31,"text":276,"correct":26},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},1125086,"适用于水深3m以内，水流流速1.5m\u002Fs以内，河床土质渗水较小时的围堰是( )。",[292,293,294,295],{"key":20,"text":260,"correct":22},{"key":24,"text":264,"correct":26},{"key":28,"text":278,"correct":26},{"key":31,"text":276,"correct":26},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},1125087,"在深水和深基坑、流速较大的坚硬河床进行基础工程施工时，应采用( )围堰。",[300,302,304,306],{"key":20,"text":301,"correct":26},"土",{"key":24,"text":303,"correct":26},"土袋",{"key":28,"text":305,"correct":26},"铅丝笼",{"key":31,"text":307,"correct":22},"钢板桩",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1125088,"土围堰内坡脚与基坑顶边缘的距离不得小于( )。",[312,313,314,315],{"key":20,"text":248,"correct":22},{"key":24,"text":250,"correct":26},{"key":28,"text":252,"correct":26},{"key":31,"text":254,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1125089,"机械挖基时，土围堰堰顶的宽度不宜小于( )。",[320,322,324,326],{"key":20,"text":321,"correct":26},"3.5m",{"key":24,"text":323,"correct":22},"3.0m",{"key":28,"text":325,"correct":26},"2.5m",{"key":31,"text":327,"correct":26},"2.0m",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},1125090,"现场填筑土围堰的填筑材料不应用( )。",[332,334,336,338],{"key":20,"text":333,"correct":26},"黏性土",{"key":24,"text":335,"correct":26},"粉质黏土",{"key":28,"text":337,"correct":26},"砂质黏土",{"key":31,"text":339,"correct":22},"砂土",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":28,"analysis":33},1125091,"围堰使用期间河流的常水位为+2.0m，可能出现的最高水位（包括浪高）为+3.0m，则该围堰顶的最低标高应为( )。",[344,346,348,350],{"key":20,"text":345,"correct":26},"+2.5m",{"key":24,"text":347,"correct":26},"+3.0m",{"key":28,"text":349,"correct":22},"+3.5m",{"key":31,"text":351,"correct":26},"+4.0m",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":28,"analysis":33},1125092,"钢板桩围堰施打顺序按施工组织设计规定进行，一般( )。",[356,358,360,362],{"key":20,"text":357,"correct":26},"由下游分两头向上游施打至合龙",{"key":24,"text":359,"correct":26},"由上游开始逆时针施打至合龙",{"key":28,"text":361,"correct":22},"由上游向下游合龙",{"key":31,"text":363,"correct":26},"由上游开始顺时针施打至合龙",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},1125093,"宜采用锤击沉桩的情况是( )。",[368,370,372,374],{"key":20,"text":369,"correct":26},"在黏土、砂土、碎石土，且较厚的河床覆土中沉桩",{"key":24,"text":371,"correct":26},"在密实的黏性土、砾石、风化岩中沉桩",{"key":28,"text":373,"correct":26},"在软黏土(标准贯入度N＜20)、淤泥质土中沉桩",{"key":31,"text":375,"correct":22},"在砂类土、黏性土中沉桩",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},1125094,"关于沉入桩准备工作，说法错误的是( )。",[380,382,384,386],{"key":20,"text":381,"correct":26},"沉桩前应掌握工程地质钻探资料、水文资料和打桩资料",{"key":24,"text":383,"correct":26},"处理地上（下）障碍物，平整场地，并应满足沉桩所需的地面承载力",{"key":28,"text":385,"correct":22},"在城区、居民区等人员密集的场所应根据现场环境状况采取降低噪声措施",{"key":31,"text":387,"correct":26},"用于地下水有侵蚀性的地区或腐蚀性土层的钢桩应按照设计要求做好防腐处理",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":28,"analysis":33},1125095,"城市桥梁工程常用的桩基础按成桩施工方法不包括( )。",[392,394,396,398],{"key":20,"text":393,"correct":26},"沉入桩",{"key":24,"text":395,"correct":26},"钻孔灌注桩",{"key":28,"text":397,"correct":22},"水泥搅拌桩",{"key":31,"text":399,"correct":26},"人工挖孔桩",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},1125096,"应通过试桩或做沉桩试验后会同监理及设计单位研究确定的沉入桩指标是( )。",[404,406,408,410],{"key":20,"text":405,"correct":22},"贯入度",{"key":24,"text":407,"correct":26},"桩端标高",{"key":28,"text":409,"correct":26},"桩身强度",{"key":31,"text":411,"correct":26},"承载能力",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},1125097,"应慎用射水沉桩的土层是( )。",[416,418,419,421],{"key":20,"text":417,"correct":26},"砂类土",{"key":24,"text":333,"correct":22},{"key":28,"text":420,"correct":26},"碎石土",{"key":31,"text":422,"correct":26},"风化岩",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},1125098,"钻孔埋桩宜用于( )。",[427,429,431,433],{"key":20,"text":428,"correct":26},"砂类土、黏性土",{"key":24,"text":430,"correct":26},"密实的黏性土、砾石、风化岩",{"key":28,"text":432,"correct":26},"软黏土（标准贯入度N＜20）、淤泥质土",{"key":31,"text":434,"correct":22},"黏土、砂土、碎石土且河床覆土较厚的情况",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":28,"analysis":33},1125099,"在桩的打入过程中，应始终保持锤、桩帽和桩身在( )上。",[439,441,443,445],{"key":20,"text":440,"correct":26},"同一水平面",{"key":24,"text":442,"correct":26},"同一横截面",{"key":28,"text":444,"correct":22},"同一中心线",{"key":31,"text":446,"correct":26},"同一中心轴",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1125100,"关于沉人桩施工的说法，错误的是( )。",[451,453,455,457],{"key":20,"text":452,"correct":26},"宜先沉大桩，后沉小桩",{"key":24,"text":454,"correct":22},"桩身垂直度偏差不得超过1%",{"key":28,"text":456,"correct":26},"对于密集桩群，沉桩顺序宜由中间向两端或向四周施工",{"key":31,"text":458,"correct":26},"沉桩过程中应加强对邻近建筑物、地下管线等的观测、监护",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},1125101,"只能用于地下水位以上的钻孔灌注桩成孔机械是( )。",[463,465,467,469],{"key":20,"text":464,"correct":26},"旋挖钻",{"key":24,"text":466,"correct":22},"长螺旋钻",{"key":28,"text":468,"correct":26},"冲抓钻",{"key":31,"text":470,"correct":26},"冲击钻",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":31,"analysis":33},1125102,"在钻孔灌注桩钻孔过程中，护筒顶面宜高出施工水位或地下水位（）",[475,477,479,481],{"key":20,"text":476,"correct":26},"0.5m",{"key":24,"text":478,"correct":26},"0.6m",{"key":28,"text":480,"correct":26},"0.8m",{"key":31,"text":327,"correct":22},{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1125103,"人工挖孔桩必须在保证施工( )前提下选用。",[486,488,490,492],{"key":20,"text":487,"correct":26},"质量",{"key":24,"text":489,"correct":22},"安全",{"key":28,"text":491,"correct":26},"进度",{"key":31,"text":493,"correct":26},"成本",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},1125104,"关于承台施工要求，说法正确的是( )。",[498,500,502,504],{"key":20,"text":499,"correct":22},"承台施工前应检查基桩位置，确认符合设计要求",{"key":24,"text":501,"correct":26},"承台基坑无水，设计无要求，基底可铺10cm厚碎石垫层",{"key":28,"text":503,"correct":26},"承台基坑有渗水，设计无要求，基底应浇筑10cm厚混凝土垫层",{"key":31,"text":505,"correct":26},"水中高桩承台采用套箱法施工时，套箱顶面高程可等于施工期间的最高水位",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},1125105,"钻孔灌注桩浇筑水下混凝土时，导管埋入混凝土深度最多为( )。",[510,512,514,516],{"key":20,"text":511,"correct":26},"2m",{"key":24,"text":513,"correct":26},"4m",{"key":28,"text":515,"correct":22},"6m",{"key":31,"text":517,"correct":26},"8m",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1125106,"为确保灌注桩顶质量，在桩顶设计标高以上应加灌一定高度，一般不宜小于( )。",[522,523,525,527],{"key":20,"text":476,"correct":22},{"key":24,"text":524,"correct":26},"0.4m",{"key":28,"text":526,"correct":26},"0.3m",{"key":31,"text":528,"correct":26},"0.2m",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":28,"analysis":33},1125107,"钻孔灌注桩水下混凝土灌注时，桩顶混凝土浇筑完成后应高出设计标高( )m，确保桩头浮浆层凿除后桩基面混凝土达到设计强度。",[533,535,537,539],{"key":20,"text":534,"correct":26},"0.0～0.3",{"key":24,"text":536,"correct":26},"0.3～0.5",{"key":28,"text":538,"correct":22},"0.5～1.0",{"key":31,"text":540,"correct":26},"1.0～1.5",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":28,"analysis":33},1125108,"钻孔灌注桩所用的水下混凝土须具备良好的和易性，坍落度至少宜为( )mm。",[545,547,549,551],{"key":20,"text":546,"correct":26},"220",{"key":24,"text":548,"correct":26},"200",{"key":28,"text":550,"correct":22},"180",{"key":31,"text":552,"correct":26},"160",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1125109,"采用预制混凝土管做柱身外模时，安装预制管要求错误的是()。",[557,559,561,563],{"key":20,"text":558,"correct":22},"基础面宜采用凹槽接头，凹槽深度不得小于30mm",{"key":24,"text":560,"correct":26},"管柱四周用四根竖方木对称绑扎牢固",{"key":28,"text":562,"correct":26},"混凝土管柱外模应设斜撑",{"key":31,"text":564,"correct":26},"管节接缝应采用水泥砂浆等材料密封",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":28,"analysis":33},1125110,"关于城镇桥梁柱式墩台施工的说法，错误的是( )。",[569,571,573,575],{"key":20,"text":570,"correct":26},"模板、支架稳定性验算中应考虑风力影响",{"key":24,"text":572,"correct":26},"墩台柱与承台基础接触面应凿毛处理，清除钢筋污锈",{"key":28,"text":574,"correct":22},"柱身高度内有系梁连接时，系梁应与柱分步浇筑",{"key":31,"text":576,"correct":26},"V形墩柱混凝土应对称浇筑",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":28,"analysis":33},1125111,"柱身混凝土浇筑应一次到顶，铺设与混凝土配比相同的( )。",[581,582,584,585],{"key":20,"text":167,"correct":26},{"key":24,"text":583,"correct":26},"石棉水泥浆",{"key":28,"text":169,"correct":22},{"key":31,"text":586,"correct":26},"粉煤灰水泥砂浆",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},1125112,"墩台混凝土分块浇筑时，墩台水平截面积在200㎡内分块不得超过( )块。",[591,593,594,595],{"key":20,"text":592,"correct":26},"1",{"key":24,"text":45,"correct":22},{"key":28,"text":39,"correct":26},{"key":31,"text":41,"correct":26},[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]