[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,11,50,2846,[13,34,46,57,68,80,92,104,116,127,139,151,163,175,187,199,211,223,235,247,259,270,280,292,304,316,325,337,349,361,373,385,397,405,417,429,441,453,465,477,489,501,510,522,530,538,550,560,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1125006,1,"单选题","1KV以下高压线线路与钻机的安全距离为（ ）m。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","4",true,{"key":24,"text":25,"correct":26},"B","6",false,{"key":28,"text":29,"correct":26},"C","8",{"key":31,"text":32,"correct":26},"D","10","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1125007,"以下说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"拆除梁或悬挑构件时，应采取有效的下落控制措施，方可切断两端的支撑",{"key":24,"text":41,"correct":22},"人工拆除挡土墙时，可采用掏掘或推倒的方法",{"key":28,"text":43,"correct":26},"人工拆除施工应从上至下、逐层拆除、分段进行，不得垂直交叉作业",{"key":31,"text":45,"correct":26},"拆除管道及容器时，必须在查清残留物的性质，并采取相应措施确保安全后，方可进行拆除施工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1125008,"施工技术文件应按国家规范要求，在工程竣工验收后（ ）个月内，由建设单位报当地建档案机构归档。",[50,52,54,55],{"key":20,"text":51,"correct":26},"1",{"key":24,"text":53,"correct":22},"3",{"key":28,"text":25,"correct":26},{"key":31,"text":56,"correct":26},"12",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":28,"analysis":33},1125009,"建设单位必须在竣工验收（ ）个工作日前将验收的时间、地点及验收组名单书面通知负责监督该工程的工程质量监督机构。",[61,63,64,66],{"key":20,"text":62,"correct":26},"15",{"key":24,"text":32,"correct":26},{"key":28,"text":65,"correct":22},"7",{"key":31,"text":67,"correct":26},"5",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":31,"analysis":33},1125010,"按《建设工程文件归档整理规范》GB\u002FT 50328--2001要求，建设单位应当在工程竣工验收后（ ）内，向城建档案馆报送一套符合规定的建设工程档案。",[72,74,76,78],{"key":20,"text":73,"correct":26},"15天",{"key":24,"text":75,"correct":26},"1个月",{"key":28,"text":77,"correct":26},"2个月",{"key":31,"text":79,"correct":22},"3个月",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1125011,"竣工验收前建设单位应请（ ）对施工技术资料进行预验收。",[84,86,88,90],{"key":20,"text":85,"correct":26},"城建主管部门",{"key":24,"text":87,"correct":22},"当地城建档案部门",{"key":28,"text":89,"correct":26},"监理单位",{"key":31,"text":91,"correct":26},"质量监督部门",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1125012,"关于分部工程、单位工程验收程序的说法，错误的是（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"分部工程应由施工单位项目经理组织监理单位和项目技术、质量负责人等进行验收",{"key":24,"text":99,"correct":26},"单位工程完工后，在施工单位自检合格基础上，由总监理工程师组织专业监理工程师对工程质量进行竣工预验收",{"key":28,"text":101,"correct":26},"预验收合格后，由施工单位向建设单位提交工程竣工报告，申请工程竣工验收",{"key":31,"text":103,"correct":26},"建设单位收到工程竣工报告后，其（项目）负责人组织施工、设计、勘察、监理等单位进行单位工程验收",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},1125013,"城市建设工程档案应分专业按（ ）组卷。",[108,110,112,114],{"key":20,"text":109,"correct":26},"分项工程",{"key":24,"text":111,"correct":26},"分部工程",{"key":28,"text":113,"correct":26},"单项工程",{"key":31,"text":115,"correct":22},"单位工程",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},1125014,"工程竣工验收合格之日起15日内，（ ）应向工程所在地的县级以上地方人民政府建设行政主管部门备案。",[120,122,124,126],{"key":20,"text":121,"correct":26},"设计单位",{"key":24,"text":123,"correct":26},"施工单位",{"key":28,"text":125,"correct":22},"建设单位",{"key":31,"text":89,"correct":26},{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1125015,"进度计划检查审核的目的为（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"实现进度目标纠正措施",{"key":24,"text":134,"correct":26},"满足施工合同工期的要求",{"key":28,"text":136,"correct":26},"保证工程施工质量和安全的需要",{"key":31,"text":138,"correct":26},"检查项目计划内容是否全面，有无泄漏",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},1125016,"技术标书的编制依据应该以（ ）为标准。",[143,145,147,149],{"key":20,"text":144,"correct":26},"施工图纸",{"key":24,"text":146,"correct":26},"技术规范",{"key":28,"text":148,"correct":22},"技术评分",{"key":31,"text":150,"correct":26},"评标办法",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},1125017,"投标人应当按照（ ）的要求编制投标文件。",[155,157,159,161],{"key":20,"text":156,"correct":26},"招标人",{"key":24,"text":158,"correct":26},"招标代理",{"key":28,"text":160,"correct":22},"招标文件",{"key":31,"text":162,"correct":26},"投标文件格式",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},1125018,"宜采用邀请招标的充足条件是（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":26},"招标人已依法成立",{"key":24,"text":170,"correct":26},"初步设计及概算已获批",{"key":28,"text":172,"correct":26},"招标范围.方法.组织形式等已进行核准",{"key":31,"text":174,"correct":22},"只有少数几家潜在投标人可供选择的",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},1125019,"近三年承担过类似工程项目施工，并有良好的工程业绩和履约记录的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":26},"资质要求",{"key":24,"text":182,"correct":22},"业绩要求",{"key":28,"text":184,"correct":26},"财务要求",{"key":31,"text":186,"correct":26},"政策要求",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1125020,"采用邀请招标方式的，招标人应当向（ ）家以上具备承担施工招标项目的能力、资信良好的特定法人或者其他组织发出投标邀请书。",[191,193,195,197],{"key":20,"text":192,"correct":26},"两",{"key":24,"text":194,"correct":22},"三",{"key":28,"text":196,"correct":26},"五",{"key":31,"text":198,"correct":26},"七",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1125021,"招标文件主要内容不包括（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":26},"技术条款",{"key":24,"text":206,"correct":26},"评标标准",{"key":28,"text":208,"correct":26},"投标辅助材料",{"key":31,"text":210,"correct":22},"市场价格信息",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":28,"analysis":33},1125022,"根据《建设工程工程量清单计价规范》（GB50500—2013），下列措施项目费中不能作为竞争性费用的是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"脚手架工程费",{"key":24,"text":218,"correct":26},"夜间施工增加费",{"key":28,"text":220,"correct":22},"安全文明施工费",{"key":31,"text":222,"correct":26},"冬.雨期施工增加费",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":28,"analysis":33},1125023,"当建设项目有多个单项工程时，应采用（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"一级预算编制形式",{"key":24,"text":230,"correct":26},"二级预算编制形式",{"key":28,"text":232,"correct":22},"三级预算编制形式",{"key":31,"text":234,"correct":26},"四级预算编制形式",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1125024,"工程量清单计价模式是指按照国家统一的工程量计算规则，工程数量采用（ ）的形式计算工程造价的方法。",[239,241,243,245],{"key":20,"text":240,"correct":22},"综合单价",{"key":24,"text":242,"correct":26},"企业定额",{"key":28,"text":244,"correct":26},"预算定额",{"key":31,"text":246,"correct":26},"市场价格",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1125025,"桥面与低水位之间的高差，或指桥面与桥下线路路面之间的距离称为（）",[251,253,255,257],{"key":20,"text":252,"correct":22},"桥梁高度",{"key":24,"text":254,"correct":26},"净跨径",{"key":28,"text":256,"correct":26},"净矢高",{"key":31,"text":258,"correct":26},"计算矢高",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},1125026,"总跨径是多孔桥梁中各孔( )的总和。",[263,265,266,268],{"key":20,"text":264,"correct":26},"标准跨径",{"key":24,"text":254,"correct":22},{"key":28,"text":267,"correct":26},"计算跨径",{"key":31,"text":269,"correct":26},"形心跨径",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},1125027,"桥梁两端两个桥台的侧墙或八字墙后端点之间的距离称为( )。",[274,276,277,278],{"key":20,"text":275,"correct":26},"总跨径",{"key":24,"text":267,"correct":26},{"key":28,"text":254,"correct":26},{"key":31,"text":279,"correct":22},"桥梁全长",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},1125028,"桥梁长度是指( )。",[284,286,288,290],{"key":20,"text":285,"correct":26},"多孔桥梁中各孔净跨径的总和",{"key":24,"text":287,"correct":26},"单孔拱桥两拱脚截面形心点之间的水平距离",{"key":28,"text":289,"correct":22},"桥梁两端两个桥台的侧墙或八字墙后端点之间的距离",{"key":31,"text":291,"correct":26},"单跨桥梁两个桥台之间的净距",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1125029,"按上部结构的行车道位置分，梁式桥通常属于( )桥。",[296,298,300,302],{"key":20,"text":297,"correct":22},"上承式",{"key":24,"text":299,"correct":26},"中承式",{"key":28,"text":301,"correct":26},"下承式",{"key":31,"text":303,"correct":26},"悬承式",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":31,"analysis":33},1125031,"关于桥梁模板及承重支架的设计与施工的说法，错误的是（）。",[308,310,312,314],{"key":20,"text":309,"correct":26},"模板及支架应具有足够的承载力、刚度和稳定性",{"key":24,"text":311,"correct":26},"支架立柱高于5m时，应在两横撑之间加双向剪刀撑",{"key":28,"text":313,"correct":26},"支架通行孔的两边应加护桩，夜间设警示灯",{"key":31,"text":315,"correct":22},"施工脚手架应与支架相连，以提高整体稳定性",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},1125033,"箍筋弯钩的弯曲直径应大于被箍主钢筋的直径，且HPB300不得小于箍筋直径的( )倍。",[320,322,323,324],{"key":20,"text":321,"correct":22},"2.5",{"key":24,"text":21,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":32,"correct":26},{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},1125034,"钢筋的级别、种类和直径应按设计要求采用，当需要代换时，应经( )同意，并履行相关程序。",[329,331,333,335],{"key":20,"text":330,"correct":22},"设计",{"key":24,"text":332,"correct":26},"监理",{"key":28,"text":334,"correct":26},"业主",{"key":31,"text":336,"correct":26},"建设行业主管部门",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":28,"analysis":33},1125035,"下列关于钢筋弯制的说法中，错误的是( )。",[341,343,345,347],{"key":20,"text":342,"correct":26},"钢筋宜在常温状态下弯制，不宜加热",{"key":24,"text":344,"correct":26},"钢筋宜从中部开始逐步向两端弯制，弯钩应一次弯成",{"key":28,"text":346,"correct":22},"用于抗震结构的箍筋，弯钩平直部分长度不得小于箍筋直径的5倍",{"key":31,"text":348,"correct":26},"受力钢筋弯制和末端弯钩均应符合设计要求",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},1125036,"钢筋宜优先选用( )调直。",[353,355,357,359],{"key":20,"text":354,"correct":26},"直线冷拉",{"key":24,"text":356,"correct":26},"反复拐弯延长",{"key":28,"text":358,"correct":26},"冷拔",{"key":31,"text":360,"correct":22},"机械方法",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1125037,"热轧钢筋焊接接头应优先选择( )。",[365,367,369,371],{"key":20,"text":366,"correct":26},"电阻点焊",{"key":24,"text":368,"correct":22},"闪光对焊",{"key":28,"text":370,"correct":26},"埋弧压力焊",{"key":31,"text":372,"correct":26},"电弧焊",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},1125038,"安装于预制构件上的吊环应采用( )。",[377,379,381,383],{"key":20,"text":378,"correct":22},"热轧光圆钢筋",{"key":24,"text":380,"correct":26},"热轧带肋钢筋",{"key":28,"text":382,"correct":26},"冷轧带肋钢筋",{"key":31,"text":384,"correct":26},"精轧螺纹钢筋",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},1125039,"关于钢筋验收的规定说法错误的有（）",[389,391,393,395],{"key":20,"text":390,"correct":22},"预制构件的吊环必须采用未经冷拉的热轧光圆钢筋制作，特殊情况下可以用其他钢筋替代",{"key":24,"text":392,"correct":26},"钢筋混凝土结构所用钢筋的品种、规格、性能等均应符合设计要求和现行国家标准等的规定",{"key":28,"text":394,"correct":26},"钢筋应按不同钢种、等级、牌号、规格及生产厂家分批验收，确认合格后方可使用",{"key":31,"text":396,"correct":26},"钢筋在运输、储存、加工过程中应防止锈蚀、污染和变形",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1125040,"钢筋骨架和钢筋网片的交叉点焊接宜采用( )。",[401,402,403,404],{"key":20,"text":366,"correct":22},{"key":24,"text":368,"correct":26},{"key":28,"text":370,"correct":26},{"key":31,"text":372,"correct":26},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},1125042,"下列钢筋接头设置的规定中，错误的是( )。",[409,411,413,415],{"key":20,"text":410,"correct":26},"在同一根钢筋上宜少设接头",{"key":24,"text":412,"correct":26},"钢筋接头应设在受力较小区段，不宜位于构件的最大弯矩处",{"key":28,"text":414,"correct":26},"接头末端至钢筋弯起点的距离不得小于钢筋直径的10倍",{"key":31,"text":416,"correct":22},"钢筋接头部位横向净距不得小于钢筋直径，且不得小于20mm",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1125043,"施工中钢筋受力分不清受拉、受压的，按受( )办理。",[421,423,425,427],{"key":20,"text":422,"correct":22},"拉",{"key":24,"text":424,"correct":26},"压",{"key":28,"text":426,"correct":26},"弯",{"key":31,"text":428,"correct":26},"扭",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":28,"analysis":33},1125044,"即使普通混凝土受拉构件中的主钢筋直径φ≤22mm，也不得采用( )连接。",[433,435,437,439],{"key":20,"text":434,"correct":26},"焊接",{"key":24,"text":436,"correct":26},"挤压套筒",{"key":28,"text":438,"correct":22},"绑扎",{"key":31,"text":440,"correct":26},"直螺纹",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1125045,"对C60及其以上的高强度混凝土，当混凝土方量较少时，宜( )评定混凝土强度。",[445,447,449,451],{"key":20,"text":446,"correct":22},"留取不少于10组的试件，采用方差未知统计方法",{"key":24,"text":448,"correct":26},"留取不少于10组的试件，采用方差已知统计方法",{"key":28,"text":450,"correct":26},"留取不少于20组的试件，采用方差未知统计方法",{"key":31,"text":452,"correct":26},"留取不少于20组的试件，采用非统计方法",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1125046,"市政公用工程水泥混凝土在施工配合比设计阶段进行配合比调整并提出施工配合比的依据是( )。",[457,459,461,463],{"key":20,"text":458,"correct":22},"实测砂石含水率",{"key":24,"text":460,"correct":26},"配制强度和设计强度间关系",{"key":28,"text":462,"correct":26},"施工条件差异和变化及材料质量的可能波动",{"key":31,"text":464,"correct":26},"强度验证原理和密度修正方法",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1125049,"水泥砼配合比设计步骤正确的是( )。",[469,471,473,475],{"key":20,"text":470,"correct":26},"初步配合比→试验室配合比→施工配合比→基准配合比",{"key":24,"text":472,"correct":22},"初步配合比→试验室配合比→基准配合比→施工配合比",{"key":28,"text":474,"correct":26},"初步配合比→基准配合比→试验室配合比→施工配合比",{"key":31,"text":476,"correct":26},"试验室配合比→初步配合比→基准配合比→施工配合比",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1125050,"混凝土配合比设计步骤是( )。",[481,483,485,487],{"key":20,"text":482,"correct":26},"初步配合比设计→基准配合比设计→试验室配合比设计→施工配合比设计",{"key":24,"text":484,"correct":22},"初步配合比设计→试验室配合比设计→基准配合比设计→施工配合比设计",{"key":28,"text":486,"correct":26},"试验室配合比设计→基准配合比设计→初步配合比设计→施工配合比设计",{"key":31,"text":488,"correct":26},"试验室配合比设计→初步配合比设计→基准配合比设计→施工配合比设计",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":28,"analysis":33},1125051,"施工配合比设计阶段，根据实测砂石( )进行配合比调整，提出施工配合比。",[493,495,497,499],{"key":20,"text":494,"correct":26},"重量",{"key":24,"text":496,"correct":26},"堆积密度",{"key":28,"text":498,"correct":22},"含水率",{"key":31,"text":500,"correct":26},"级配",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},1125052,"在混凝土生产过程中，对骨料含水率的检测，每一工作班不应少于( )次。",[505,506,508,509],{"key":20,"text":51,"correct":22},{"key":24,"text":507,"correct":26},"2",{"key":28,"text":53,"correct":26},{"key":31,"text":21,"correct":26},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1125053,"预应力筋切断不得采用( )切割。",[514,516,518,520],{"key":20,"text":515,"correct":26},"切断机",{"key":24,"text":517,"correct":26},"砂轮锯",{"key":28,"text":519,"correct":22},"电弧",{"key":31,"text":521,"correct":26},"乙炔－氧气",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1125054,"预应力筋和金属管道在室外存放时间不宜超过( )个月。",[526,527,528,529],{"key":20,"text":53,"correct":26},{"key":24,"text":21,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":25,"correct":22},{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},1125055,"23m长的钢绞线束移运时至少应设支点( )个。",[534,535,536,537],{"key":20,"text":67,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":65,"correct":26},{"key":31,"text":29,"correct":22},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1125056,"预应力筋采用镦头锚固时，高强钢丝宜采用( )。",[542,544,546,548],{"key":20,"text":543,"correct":22},"液压冷镦",{"key":24,"text":545,"correct":26},"冷冲镦粗",{"key":28,"text":547,"correct":26},"电热镦粗",{"key":31,"text":549,"correct":26},"电热镦粗+热处理",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1125057,"切断预应力筋不得采用( )。",[554,555,556,558],{"key":20,"text":517,"correct":26},{"key":24,"text":515,"correct":26},{"key":28,"text":557,"correct":26},"大力剪",{"key":31,"text":559,"correct":22},"电弧切割",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1125058,"钢绞线编束时，应逐根梳理直顺不扭转，( )，不得互相缠绕。",[564,566,568,570],{"key":20,"text":565,"correct":26},"每隔0.5m用火烧铁丝绑扎牢固",{"key":24,"text":567,"correct":22},"每隔1m用火烧铁丝绑扎牢固",{"key":28,"text":569,"correct":26},"每隔0.5m用镀锌铁丝绑扎牢固",{"key":31,"text":571,"correct":26},"每隔1m用镀锌铁丝绑扎牢固",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},1125059,"在同种材料和同一生产工艺条件下，锚具、夹具应以不超过( )套组为一个验收批。",[576,578,580,582],{"key":20,"text":577,"correct":22},"1000",{"key":24,"text":579,"correct":26},"500",{"key":28,"text":581,"correct":26},"100",{"key":31,"text":583,"correct":26},"50",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},1125060,"一般情况下，管道的内横截面积至少应是预应力筋净截面积的( )倍。",[588,590,592,594],{"key":20,"text":589,"correct":26},"1.0",{"key":24,"text":591,"correct":26},"1.5",{"key":28,"text":593,"correct":22},"2.0",{"key":31,"text":321,"correct":26},[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]