[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,10,50,2846,[13,34,42,54,66,78,90,102,114,122,134,146,156,168,180,192,203,215,227,239,251,263,275,287,299,311,323,335,347,359,371,378,390,402,410,422,431,443,454,466,478,490,502,514,525,537,549,558,570,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1124950,1,"单选题","施工准备阶段质量管理的内容之一图纸会审，应由项目（ ）主持。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","质量负责人",false,{"key":24,"text":25,"correct":26},"B","技术负责人",true,{"key":28,"text":29,"correct":22},"C","负责人",{"key":31,"text":32,"correct":22},"D","生产负责人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1124951,"施工项目质量保证计划应由项目（ ）主持编制。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":24,"analysis":33},1124952,"钻孔灌注桩单桩混凝土灌注时间宜控制在（ ）内。",[46,48,50,52],{"key":20,"text":47,"correct":22},"1.2倍混凝土初凝时间",{"key":24,"text":49,"correct":26},"1.5倍混凝土初凝时间",{"key":28,"text":51,"correct":22},"1.2倍混凝土终凝时间",{"key":31,"text":53,"correct":22},"1.5倍混凝土终凝时间",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":28,"analysis":33},1124953,"钢格栅、钢架、钢筋网的喷射混凝土保护层不应小于（ ）mm。",[58,60,62,64],{"key":20,"text":59,"correct":22},"10",{"key":24,"text":61,"correct":22},"15",{"key":28,"text":63,"correct":26},"20",{"key":31,"text":65,"correct":22},"25",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":28,"analysis":33},1124954,"在拌制石灰稳定土时，宜用1～3级的新石灰，磨细生石灰可不经消解直接使用，块灰应在使用前（ ）完成消解。",[70,72,74,76],{"key":20,"text":71,"correct":22},"12h",{"key":24,"text":73,"correct":22},"当天",{"key":28,"text":75,"correct":26},"2～3d",{"key":31,"text":77,"correct":22},"15d",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":28,"analysis":33},1124955,"柔性管道变形检测时，每试验段检测数量最少是（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":22},"1处",{"key":24,"text":85,"correct":22},"2处",{"key":28,"text":87,"correct":26},"3处",{"key":31,"text":89,"correct":22},"4处",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":20,"analysis":33},1124956,"路基填方地段施工，应留（ ）%到（ ）%的横坡整平压实，以防积水。",[94,96,98,100],{"key":20,"text":95,"correct":26},"2；3",{"key":24,"text":97,"correct":22},"1；2",{"key":28,"text":99,"correct":22},"3；4",{"key":31,"text":101,"correct":22},"3；5",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":28,"analysis":33},1124957,"水泥稳定土基层选用级配碎石作底基层粒料时，城镇快速路、主干路上的最大粒径不得超过（ ）mm。",[106,108,110,112],{"key":20,"text":107,"correct":22},"26.5",{"key":24,"text":109,"correct":22},"31.5",{"key":28,"text":111,"correct":26},"37.5",{"key":31,"text":113,"correct":22},"53",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},1124958,"关于水泥混凝土面层，粗集料采用碎砾石时，最大公称粒径不得大于（ ）mm。",[118,119,120,121],{"key":20,"text":107,"correct":26},{"key":24,"text":109,"correct":22},{"key":28,"text":111,"correct":22},{"key":31,"text":113,"correct":22},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":28,"analysis":33},1124959,"当白天气温高于（ ）时，压浆宜在夜间进行。",[126,128,130,132],{"key":20,"text":127,"correct":22},"30℃",{"key":24,"text":129,"correct":22},"45℃",{"key":28,"text":131,"correct":26},"35℃",{"key":31,"text":133,"correct":22},"40℃",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":24,"analysis":33},1124960,"城镇快速路、主干路的路基不得用含有冻土块的土料填筑。次干路以下道路填土材料中冻土块最大尺寸不应大于（ ）mm。",[138,140,142,144],{"key":20,"text":139,"correct":22},"50",{"key":24,"text":141,"correct":26},"100",{"key":28,"text":143,"correct":22},"150",{"key":31,"text":145,"correct":22},"200",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":28,"analysis":33},1124961,"焊接工程中，管道开孔边缘与管道焊缝的间距不应小于（ ）mm。",[150,151,153,154],{"key":20,"text":139,"correct":22},{"key":24,"text":152,"correct":22},"80",{"key":28,"text":141,"correct":26},{"key":31,"text":155,"correct":22},"300",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":24,"analysis":33},1124962,"供热管道蒸汽吹洗压力不应大于管道工作压力的（ ）。",[160,162,164,166],{"key":20,"text":161,"correct":22},"50%",{"key":24,"text":163,"correct":26},"75%",{"key":28,"text":165,"correct":22},"100%",{"key":31,"text":167,"correct":22},"115%",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":28,"analysis":33},1124963,"在0～80cm深度范围内的主干路填土路基最低压实度（按重型击实标准）应为（ ）。",[172,174,176,178],{"key":20,"text":173,"correct":22},"90%",{"key":24,"text":175,"correct":22},"93%",{"key":28,"text":177,"correct":26},"95%",{"key":31,"text":179,"correct":22},"98%",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":24,"analysis":33},1124964,"下列关于供热管道保护层的说法，错误的是（ ）。",[184,186,188,190],{"key":20,"text":185,"correct":22},"保护层的接缝方向应与设备的坡度方向一致",{"key":24,"text":187,"correct":26},"保护层的不圆度不得大于20mm",{"key":28,"text":189,"correct":22},"缠绕式保护层的搭接部位为120mm",{"key":31,"text":191,"correct":22},"保护层的环向接缝应与管道轴向保持垂直",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":31,"analysis":33},1124965,"预应力钢筋张拉应由项目（ ）主持。",[196,198,200,202],{"key":20,"text":197,"correct":22},"操作班长",{"key":24,"text":199,"correct":22},"施工员",{"key":28,"text":201,"correct":22},"技术员",{"key":31,"text":25,"correct":26},{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":31,"analysis":33},1124966,"关于沥青混凝土面层，下列说法错误的是（ ）。",[207,209,211,213],{"key":20,"text":208,"correct":22},"城镇快速路.主干路的沥青混合料面层严禁冬期施工",{"key":24,"text":210,"correct":22},"运输中应覆盖保温，并应达到摊铺和碾压的温度要求",{"key":28,"text":212,"correct":22},"下承层表面应干燥.清洁.无冰.雪.霜等",{"key":31,"text":214,"correct":26},"摊铺时间宜安排在一日内气温较低时进行",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":31,"analysis":33},1124967,"城镇管道工程焊接质量检验次序为（ ）。",[219,221,223,225],{"key":20,"text":220,"correct":22},"对口质量检验→表面质量检验→强度和严密性试验→无损探伤检验",{"key":24,"text":222,"correct":22},"表面质量检验→对口质量检验→无损探伤检验→强度和严密性试验",{"key":28,"text":224,"correct":22},"表面质量检验→对口质量检验→强度和严密性试验→无损探伤检验",{"key":31,"text":226,"correct":26},"对口质量检验→表面质量检验→无损探伤检验→强度和严密性试验",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":31,"analysis":33},1124968,"下列关于燃气工程质量验收的说法正确的是（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":22},"工程质量验收分为“优良”.“合格”.“返修”和“不合格”",{"key":24,"text":234,"correct":22},"工程质量验收按检验批.分项工程.分部工程.单位工程划分",{"key":28,"text":236,"correct":22},"分项工程包括土建分项和安装分项工程",{"key":31,"text":238,"correct":26},"当工程规模较小时，分部工程可不划分",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":20,"analysis":33},1124969,"根据《沥青路面施工及验收规范》（GB50092-96）规定，城市道路沥青混合料路面抗滑表层还应检查（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":26},"构造深度、摩擦系数摆值",{"key":24,"text":246,"correct":22},"构造深度、摩擦系数",{"key":28,"text":248,"correct":22},"构造深度、摩擦力",{"key":31,"text":250,"correct":22},"粗糙度、摩擦系数摆值",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":28,"analysis":33},1124970,"下列检测方法中，不属于现场实测土路基干密度和含水量的是（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":22},"灌水法",{"key":24,"text":258,"correct":22},"灌砂法",{"key":28,"text":260,"correct":26},"蜡封法",{"key":31,"text":262,"correct":22},"环刀法",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":20,"analysis":33},1124971,"沥青混凝土面层施工质量验收主控项目不包括（ ）。",[267,269,271,273],{"key":20,"text":268,"correct":26},"含水量",{"key":24,"text":270,"correct":22},"压实度",{"key":28,"text":272,"correct":22},"面层厚度",{"key":31,"text":274,"correct":22},"弯沉值",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":28,"analysis":33},1124972,"地铁车站主体工程后浇带做法正确的是（ ）。",[279,281,283,285],{"key":20,"text":280,"correct":22},"后浇带位置应设于受力和变形较大处",{"key":24,"text":282,"correct":22},"后浇混凝土施工应在其两侧混凝土龄期达到28d后进行",{"key":28,"text":284,"correct":26},"后浇缝应采用补偿收缩混凝土灌注，并不得低于两侧混凝土强度",{"key":31,"text":286,"correct":22},"后浇带间距宜为100m",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":31,"analysis":33},1124973,"关于路基雨期施工的说法，不正确的是（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":22},"集中力量，快速施工，分段开挖，切忌全面开花或挖段过长",{"key":24,"text":294,"correct":22},"坚持当天挖完.填完.压完，不留后患",{"key":28,"text":296,"correct":22},"填土路基应按2%～3%以上的横坡整平压实",{"key":31,"text":298,"correct":26},"因雨翻浆，用重型压路机重新压实",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":20,"analysis":33},1124974,"钻孔灌注桩施工时，为防止塌孔与缩径，通常采取措施之一是（ ）。",[303,305,307,309],{"key":20,"text":304,"correct":26},"控制进尺速度",{"key":24,"text":306,"correct":22},"部分回填黏性土",{"key":28,"text":308,"correct":22},"全部回填黏性土",{"key":31,"text":310,"correct":22},"上下反复提钻扫孔",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},1124975,"关于路基压实标准的检验频率：每1000m2的点数（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"每层2点",{"key":24,"text":318,"correct":26},"每层3点",{"key":28,"text":320,"correct":22},"每层4点",{"key":31,"text":322,"correct":22},"每层5点",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":31,"analysis":33},1124976,"人工施工水泥混凝土路面时，振动器的振动顺序为（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"平板式振捣器→插入式振捣器→振动梁（轻）→振动梁（重）→无缝钢管滚杆提浆赶浆",{"key":24,"text":330,"correct":22},"平板式振捣器→插入式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",{"key":28,"text":332,"correct":22},"插入式振捣器→平板式振捣器→振动梁（轻）→振动梁（重）→无缝钢管滚杆提浆赶浆",{"key":31,"text":334,"correct":26},"插入式振捣器→平板式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":28,"analysis":33},1124977,"关于排水构筑物混凝土的施工，下列说法错误的是（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":22},"砂和碎石要连续级配",{"key":24,"text":342,"correct":22},"对于大型给水排水混凝土构筑物，合理设置后浇带",{"key":28,"text":344,"correct":26},"在满足混凝土运输和布放要求前提下，要尽可能增大入模坍落度",{"key":31,"text":346,"correct":22},"对于地下部分结构，拆模后及时回填土",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":28,"analysis":33},1124978,"为避免孔口高程误差造成钻孔灌注桩质量事故，应采取的对策是认真校核原始水准点和各孔口的绝对高程，每根桩钻孔前（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"实行签证手续",{"key":24,"text":354,"correct":22},"平整施工场地",{"key":28,"text":356,"correct":26},"复测孔口高程",{"key":31,"text":358,"correct":22},"控制混凝土超灌高度",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1124979,"关于石灰稳定性基层施工下列说法错误的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"宜采用塑性指数10～15的粉质黏土.黏土，宜采用1～3级的新石灰",{"key":24,"text":366,"correct":22},"磨细石灰可不经消解直接使用",{"key":28,"text":368,"correct":22},"生石灰应在使用前2～3d完成消解",{"key":31,"text":370,"correct":26},"消解后的石灰粒径不得大于20mm",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":373,"answer":28,"analysis":33},1124986,[374,375,376,377],{"key":20,"text":139,"correct":22},{"key":24,"text":152,"correct":22},{"key":28,"text":141,"correct":26},{"key":31,"text":155,"correct":22},{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":28,"analysis":33},1124987,"热力管道安装质量检验的主控项目之一是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"中心线位移",{"key":24,"text":385,"correct":22},"立管垂直度",{"key":28,"text":387,"correct":26},"对口间隙",{"key":31,"text":389,"correct":22},"保温层厚度",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},1124988,"混凝土桩堆放时码放层数不宜超过（ ）层。",[394,396,398,400],{"key":20,"text":395,"correct":22},"2",{"key":24,"text":397,"correct":22},"3",{"key":28,"text":399,"correct":26},"4",{"key":31,"text":401,"correct":22},"5",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1124989,"钢桩堆放层数不得超过（ ）层。",[406,407,408,409],{"key":20,"text":395,"correct":22},{"key":24,"text":397,"correct":26},{"key":28,"text":399,"correct":22},{"key":31,"text":401,"correct":22},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},1124990,"（ ）应对本项目安全生产负总责，并负责项目安全生产管理活动的组织、协调、考核、奖惩。",[414,416,418,420],{"key":20,"text":415,"correct":22},"安全管理部门",{"key":24,"text":417,"correct":26},"项目经理",{"key":28,"text":419,"correct":22},"施工管理部门",{"key":31,"text":421,"correct":22},"技术管理部门",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1124991,"施工安全管理方案应在项目（ ）主持下开展编制活动。",[426,427,428,429],{"key":20,"text":29,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":32,"correct":22},{"key":31,"text":430,"correct":22},"专职安全员",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},1124992,"箱涵顶进在穿越铁路路基时，在列车不允许限速情况下，可采用（ ）方法。",[435,437,439,441],{"key":20,"text":436,"correct":22},"轨束梁",{"key":24,"text":438,"correct":22},"纵横梁加固",{"key":28,"text":440,"correct":26},"施工便梁",{"key":31,"text":442,"correct":22},"钢板脱壳法",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":31,"analysis":33},1124993,"铁道线路加固方法与措施中，小型箱涵采用（ ）的加固法。",[447,449,451,452],{"key":20,"text":448,"correct":22},"横梁加盖",{"key":24,"text":450,"correct":22},"钢板脱壳",{"key":28,"text":438,"correct":22},{"key":31,"text":453,"correct":26},"调轨梁",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1124994,"对于资料反映不详、与实际不符或在资料中未反映管线真实情况的，应向规划部门、管线管理单位查询，必要时在（ ）在场情况下进行坑探查明现状。",[458,460,462,464],{"key":20,"text":459,"correct":22},"建设单位",{"key":24,"text":461,"correct":22},"监理单位",{"key":28,"text":463,"correct":26},"管线管理单位",{"key":31,"text":465,"correct":22},"建设主管部门",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1124995,"（ ）会引起基坑周围土体沉降，当基坑邻近有建筑物时不宜采用。",[470,472,474,476],{"key":20,"text":471,"correct":26},"降水",{"key":24,"text":473,"correct":22},"截水",{"key":28,"text":475,"correct":22},"回灌",{"key":31,"text":477,"correct":22},"地下连续墙",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1124996,"下列不属于风险识别方法的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"人的可靠性分析",{"key":24,"text":485,"correct":22},"故障类型与影响分析",{"key":28,"text":487,"correct":22},"事故树分析",{"key":31,"text":489,"correct":26},"危险源与原因分析",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},1124997,"施工单位进场后应依据（ ）提供的工程地质勘查报告、基坑开挖范围内及影响范围内的各种管线、地面建筑物等有关资料，查阅有关专业技术资料，掌握管线的施工年限、使用状况、位置、埋深等数据信息。",[494,496,498,500],{"key":20,"text":495,"correct":22},"施工方",{"key":24,"text":497,"correct":22},"监理方",{"key":28,"text":499,"correct":22},"勘察方",{"key":31,"text":501,"correct":26},"建设方",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},1124998,"下列关于模板支架、脚手架的搭设和拆除说法错误的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"施工中不得超载，不得在支架上集中堆放物料",{"key":24,"text":509,"correct":22},"模板支架.脚手架拆除采用机械作业时应由专人指挥",{"key":28,"text":511,"correct":22},"脚手架应按规定采用连接件与构筑物相连接，使用期间不得拆除",{"key":31,"text":513,"correct":26},"模板支架.脚手架拆除应按施工方案或专项方案要求由下而上逐层进行",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},1124999,"项目部经过集思广益后通过本项目部的安全管理目标，由（ ）确认后予以发布。",[518,519,521,523],{"key":20,"text":417,"correct":26},{"key":24,"text":520,"correct":22},"监理工程师",{"key":28,"text":522,"correct":22},"发包人",{"key":31,"text":524,"correct":22},"公司总经理",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":28,"analysis":33},1125000,"在城市进行爆破施工，必须事先编制爆破方案，经（ ）同意后方可施工。",[529,531,533,535],{"key":20,"text":530,"correct":22},"安全监督部门",{"key":24,"text":532,"correct":22},"城市主管部门",{"key":28,"text":534,"correct":26},"公安局",{"key":31,"text":536,"correct":22},"行政主管部门",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},1125001,"隧道采用钻爆法施工时，必须事先编制爆破方案，（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"报监理批准，并经城市主管部门同意后方可实施",{"key":24,"text":544,"correct":22},"报公安部门批准，并经城市主管部门同意后方可实施",{"key":28,"text":546,"correct":22},"报业主批准，并经公安部门同意后方可实施",{"key":31,"text":548,"correct":26},"报城市主管部门批准，并经公安部门同意后方可实施",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":28,"analysis":33},1125002,"开工前，由（ ）召开工程范围内有关地上建（构）筑物、地下管线、人防、地铁等设施管理单位的调查配合会，由产权单位指认所属设施及其准确位置，设明显标志。",[553,554,556,557],{"key":20,"text":532,"correct":22},{"key":24,"text":555,"correct":22},"施工单位",{"key":28,"text":459,"correct":26},{"key":31,"text":461,"correct":22},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":31,"analysis":33},1125003,"下列不属于暗挖隧道常规监测项目的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"管线沉降",{"key":24,"text":565,"correct":22},"倾斜及裂缝",{"key":28,"text":567,"correct":22},"净空收敛",{"key":31,"text":569,"correct":26},"围护结构内力",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1125004,"以下哪一个不是施工监控量测应遵守的原则（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"可靠性原则",{"key":24,"text":577,"correct":26},"仪器先进性原则",{"key":28,"text":579,"correct":22},"多层次监测原则",{"key":31,"text":581,"correct":22},"方便实用原则",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},1125005,"加工成型的钢筋笼、钢筋网和钢筋骨架等应水平放置，（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"码放高度不得超过2m；码放层数不宜超过2层",{"key":24,"text":589,"correct":26},"码放高度不得超过2m；码放层数不宜超过3层",{"key":28,"text":591,"correct":22},"码放高度不得超过3m；码放层数不宜超过2层",{"key":31,"text":593,"correct":22},"码放高度不得超过3m；码放层数不宜超过3层",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]