[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-792-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},792,"二建市政工程实务","建筑工程",0,1,50,2846,[13,33,43,55,67,79,91,102,114,126,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,376,388,400,412,424,436,448,460,472,484,496,508,520,532,544,553,565,576,588,600],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":29,"analysis":32},1124464,"单选题","当预应力管道内的横截面积不足预应力筋净截面积的（ ）倍，应通过试验验证其可否进行正常压浆作业。",[18,22,25,28],{"key":19,"text":20,"correct":21},"A","0.5",false,{"key":23,"text":24,"correct":21},"B","1",{"key":26,"text":27,"correct":21},"C","1.5",{"key":29,"text":30,"correct":31},"D","2",true,"",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":23,"analysis":32},1124465,"在先张法预应力施工中使用的张拉横梁应有足够的刚度，受力后的最大挠度不得大于（ ）mm。",[37,38,39,41],{"key":19,"text":24,"correct":21},{"key":23,"text":30,"correct":31},{"key":26,"text":40,"correct":21},"4",{"key":29,"text":42,"correct":21},"6",{"id":44,"libraryId":5,"type":9,"typeLabel":15,"stem":45,"options":46,"answer":23,"analysis":32},1124466,"非承重侧模应在混凝土强度能保证结构棱角不损坏时方可拆除，混凝土强度宜为（ ）。",[47,49,51,53],{"key":19,"text":48,"correct":21},"1.0MPa及以上",{"key":23,"text":50,"correct":31},"2.5MPa及以上",{"key":26,"text":52,"correct":21},"3.0MPa及以上",{"key":29,"text":54,"correct":21},"5.0MPa及以上",{"id":56,"libraryId":5,"type":9,"typeLabel":15,"stem":57,"options":58,"answer":26,"analysis":32},1124467,"先张法预应力施工中，张拉台座应具有足够的强度和刚度，其抗倾覆安全系数不得小于（ ），抗滑移安全系数不得小于（ ）。",[59,61,63,65],{"key":19,"text":60,"correct":21},"1.3，1.3",{"key":23,"text":62,"correct":21},"1.3，1.5",{"key":26,"text":64,"correct":31},"1.5，1.3",{"key":29,"text":66,"correct":21},"1.5，1.5",{"id":68,"libraryId":5,"type":9,"typeLabel":15,"stem":69,"options":70,"answer":23,"analysis":32},1124468,"混凝土拌合物从搅拌机出料起至浇筑入模的时间不超过（ ）时，其坍落度可仅在搅拌地点检测。",[71,73,75,77],{"key":19,"text":72,"correct":21},"10min",{"key":23,"text":74,"correct":31},"15min",{"key":26,"text":76,"correct":21},"30min",{"key":29,"text":78,"correct":21},"60min",{"id":80,"libraryId":5,"type":9,"typeLabel":15,"stem":81,"options":82,"answer":23,"analysis":32},1124469,"混凝土拌合物的坍落度应在搅拌地点和浇筑地点分别随机取样检测。每一单元结构物不应少于（ ）。",[83,85,87,89],{"key":19,"text":84,"correct":21},"1次",{"key":23,"text":86,"correct":31},"2次",{"key":26,"text":88,"correct":21},"3次",{"key":29,"text":90,"correct":21},"5次",{"id":92,"libraryId":5,"type":9,"typeLabel":15,"stem":93,"options":94,"answer":26,"analysis":32},1124470,"箍筋末端弯钩形式应符合设计要求或规范规定，弯钩平直部分的长度，一般结构不宜小于箍筋直径的（ ）倍。",[95,97,98,100],{"key":19,"text":96,"correct":21},"2.5",{"key":23,"text":40,"correct":21},{"key":26,"text":99,"correct":31},"5",{"key":29,"text":101,"correct":21},"10",{"id":103,"libraryId":5,"type":9,"typeLabel":15,"stem":104,"options":105,"answer":29,"analysis":32},1124471,"对于C60及其以上的高强度混凝土，当混凝土方量较少时，宜留取不少于（ ）组的试件，采用（ ）评定混凝土强度。",[106,108,110,112],{"key":19,"text":107,"correct":21},"3，方差已知的统计方法",{"key":23,"text":109,"correct":21},"5，方差已知的统计方法",{"key":26,"text":111,"correct":21},"5，方差未知的统计方法",{"key":29,"text":113,"correct":31},"10，方差未知的统计方法",{"id":115,"libraryId":5,"type":9,"typeLabel":15,"stem":116,"options":117,"answer":29,"analysis":32},1124472,"某工程箱梁预应力张拉时，梁体混凝土强度不应低于设计强度值的（ ）。（07年考点）",[118,120,122,124],{"key":19,"text":119,"correct":21},"50%",{"key":23,"text":121,"correct":21},"60%",{"key":26,"text":123,"correct":21},"65%",{"key":29,"text":125,"correct":31},"75%",{"id":127,"libraryId":5,"type":9,"typeLabel":15,"stem":128,"options":129,"answer":29,"analysis":32},1124473,"直径为22mm的钢筋，接头末端至钢筋弯起点的距离可以为（ ）。",[130,132,134,136],{"key":19,"text":131,"correct":21},"50mm",{"key":23,"text":133,"correct":21},"100mm",{"key":26,"text":135,"correct":21},"200mm",{"key":29,"text":137,"correct":31},"250mm",{"id":139,"libraryId":5,"type":9,"typeLabel":15,"stem":140,"options":141,"answer":19,"analysis":32},1124474,"在受拉钢筋的绑扎接头搭接长度范围内，箍筋间距间距应小于（ ），且不得大于（ ）。",[142,144,146,148],{"key":19,"text":143,"correct":31},"5d，100mm",{"key":23,"text":145,"correct":21},"5d，200mm",{"key":26,"text":147,"correct":21},"10d，100mm",{"key":29,"text":149,"correct":21},"10d，200mm",{"id":151,"libraryId":5,"type":9,"typeLabel":15,"stem":152,"options":153,"answer":26,"analysis":32},1124475,"在空气湿度小于40%的情况下，进行预应力筋的安装，超过（ ）d应对预应力筋采取防锈措施。",[154,156,158,160],{"key":19,"text":155,"correct":21},"7",{"key":23,"text":157,"correct":21},"15",{"key":26,"text":159,"correct":31},"20",{"key":29,"text":161,"correct":21},"21",{"id":163,"libraryId":5,"type":9,"typeLabel":15,"stem":164,"options":165,"answer":23,"analysis":32},1124476,"涵洞包括全长不到（ ）m的多孔跨径和单孔跨径不到（ ）m的泄水结构物。",[166,168,170,172],{"key":19,"text":167,"correct":21},"7，5",{"key":23,"text":169,"correct":31},"8，5",{"key":26,"text":171,"correct":21},"8，6",{"key":29,"text":173,"correct":21},"8，7",{"id":175,"libraryId":5,"type":9,"typeLabel":15,"stem":176,"options":177,"answer":23,"analysis":32},1124477,"聚合物改性沥青溶剂型防水涂料施工环境气温宜为（ ）。",[178,180,182,184],{"key":19,"text":179,"correct":21},"不低于-10℃",{"key":23,"text":181,"correct":31},"-5～35℃",{"key":26,"text":183,"correct":21},"5～35℃",{"key":29,"text":185,"correct":21},"5～30℃",{"id":187,"libraryId":5,"type":9,"typeLabel":15,"stem":188,"options":189,"answer":26,"analysis":32},1124478,"混凝土拌合物在运输过程中，如出现分层、离析时，应对混凝土拌合物（ ）。",[190,192,194,196],{"key":19,"text":191,"correct":21},"掺加减水剂",{"key":23,"text":193,"correct":21},"掺加缓凝剂",{"key":26,"text":195,"correct":31},"二次快速搅拌",{"key":29,"text":197,"correct":21},"加水",{"id":199,"libraryId":5,"type":9,"typeLabel":15,"stem":200,"options":201,"answer":23,"analysis":32},1124479,"在（ ）阶段，应根据强度验证原理和密度修正方法，确定每立方米混凝土的材料用量。",[202,204,206,208],{"key":19,"text":203,"correct":21},"初步配合比设计",{"key":23,"text":205,"correct":31},"基准配合比设计",{"key":26,"text":207,"correct":21},"施工配合比设计",{"key":29,"text":209,"correct":21},"试验室配合比设计",{"id":211,"libraryId":5,"type":9,"typeLabel":15,"stem":212,"options":213,"answer":26,"analysis":32},1124480,"关于桥梁防水涂料的说法，正确的是（ ）。",[214,216,218,220],{"key":19,"text":215,"correct":21},"防水涂料配料时，可掺加少量结块的涂料",{"key":23,"text":217,"correct":21},"第一层防水涂料完成后应立即涂布第二次涂料",{"key":26,"text":219,"correct":31},"涂料防水层内设置的胎体增强材料，应顺桥面行车方向铺贴",{"key":29,"text":221,"correct":21},"防水涂料施工应先进行大面积涂布后，再做好节点处理",{"id":223,"libraryId":5,"type":9,"typeLabel":15,"stem":224,"options":225,"answer":19,"analysis":32},1124481,"预应力构件施工中属于先张法的工序是（ ）。（12年考点）",[226,228,230,232],{"key":19,"text":227,"correct":31},"放张",{"key":23,"text":229,"correct":21},"预留孔道",{"key":26,"text":231,"correct":21},"预应力管道清洗",{"key":29,"text":233,"correct":21},"孔道压浆",{"id":235,"libraryId":5,"type":9,"typeLabel":15,"stem":236,"options":237,"answer":19,"analysis":32},1124482,"先张法预应力施工中，放张预应力筋时应（ ）地放张。",[238,240,242,244],{"key":19,"text":239,"correct":31},"分阶段、对称、交错",{"key":23,"text":241,"correct":21},"分阶段、顺序",{"key":26,"text":243,"correct":21},"一次性、对称、交错",{"key":29,"text":245,"correct":21},"一次性、顺序",{"id":247,"libraryId":5,"type":9,"typeLabel":15,"stem":248,"options":249,"answer":29,"analysis":32},1124483,"下面关于钢筋加工说法错误的是（ ）。",[250,252,254,256],{"key":19,"text":251,"correct":21},"钢筋应优先选用机械方法调直",{"key":23,"text":253,"correct":21},"下料后应按种类和使用部位分别挂牌说明",{"key":26,"text":255,"correct":21},"钢筋宜在常温状态下弯制，不宜加热",{"key":29,"text":257,"correct":31},"钢筋宜从两端开始逐步向中部弯制，弯钩应一次弯成",{"id":259,"libraryId":5,"type":9,"typeLabel":15,"stem":260,"options":261,"answer":29,"analysis":32},1124484,"桥梁防水混凝土基层施工质量检验的主控项目不包括（ ）。",[262,264,266,268],{"key":19,"text":263,"correct":21},"含水率",{"key":23,"text":265,"correct":21},"粗糙度",{"key":26,"text":267,"correct":21},"平整度",{"key":29,"text":269,"correct":31},"外观质量",{"id":271,"libraryId":5,"type":9,"typeLabel":15,"stem":272,"options":273,"answer":26,"analysis":32},1124485,"混凝土拌合物运输到浇筑地点后，应按规定检测（ ）。",[274,276,278,280],{"key":19,"text":275,"correct":21},"混凝土粘聚性",{"key":23,"text":277,"correct":21},"混凝土流动性",{"key":26,"text":279,"correct":31},"混凝土坍落度",{"key":29,"text":281,"correct":21},"混凝土饱和度",{"id":283,"libraryId":5,"type":9,"typeLabel":15,"stem":284,"options":285,"answer":19,"analysis":32},1124486,"矢跨比是（ ）",[286,288,290,292],{"key":19,"text":287,"correct":31},"计算矢高与计算跨径之比",{"key":23,"text":289,"correct":21},"计算矢高与净跨径之比",{"key":26,"text":291,"correct":21},"净矢高与计算跨径之比",{"key":29,"text":293,"correct":21},"净矢高与净跨径之比",{"id":295,"libraryId":5,"type":9,"typeLabel":15,"stem":296,"options":297,"answer":26,"analysis":32},1124487,"桥面与低水位之间的高差，或者桥面与桥下线路路面之间的距离是指（ ）。",[298,300,302,304],{"key":19,"text":299,"correct":21},"建筑高度",{"key":23,"text":301,"correct":21},"桥下净空高度",{"key":26,"text":303,"correct":31},"桥梁高度",{"key":29,"text":305,"correct":21},"容许建筑高度",{"id":307,"libraryId":5,"type":9,"typeLabel":15,"stem":308,"options":309,"answer":19,"analysis":32},1124488,"拱式桥中每孔拱跨两个拱脚截面最低点之间的水平距离是（ ）。",[310,312,314,316],{"key":19,"text":311,"correct":31},"净跨径",{"key":23,"text":313,"correct":21},"计算跨径",{"key":26,"text":315,"correct":21},"总跨径",{"key":29,"text":317,"correct":21},"矢跨径",{"id":319,"libraryId":5,"type":9,"typeLabel":15,"stem":320,"options":321,"answer":19,"analysis":32},1124489,"精轧螺纹钢筋在外观检查合格后，每批外观检查合格后任选2根钢筋截取试件进行（ ）试验。",[322,324,326,328],{"key":19,"text":323,"correct":31},"拉伸试验",{"key":23,"text":325,"correct":21},"弯曲试验",{"key":26,"text":327,"correct":21},"抗拉试验",{"key":29,"text":329,"correct":21},"伸长率",{"id":331,"libraryId":5,"type":9,"typeLabel":15,"stem":332,"options":333,"answer":23,"analysis":32},1124490,"预应力筋采用镦头锚固时，HRB500级钢筋镦粗后应进行（ ）。",[334,336,338,340],{"key":19,"text":335,"correct":21},"冷拔处理",{"key":23,"text":337,"correct":31},"电热处理",{"key":26,"text":339,"correct":21},"液压冷镦",{"key":29,"text":341,"correct":21},"电化学处理",{"id":343,"libraryId":5,"type":9,"typeLabel":15,"stem":344,"options":345,"answer":19,"analysis":32},1124491,"下面桥梁中，（ ）桥是在竖向荷载作用下无水平反力的结构。",[346,348,350,352],{"key":19,"text":347,"correct":31},"梁式",{"key":23,"text":349,"correct":21},"拱式",{"key":26,"text":351,"correct":21},"刚架",{"key":29,"text":353,"correct":21},"悬索",{"id":355,"libraryId":5,"type":9,"typeLabel":15,"stem":356,"options":357,"answer":19,"analysis":32},1124492,"配制预应力结构的混凝土，应优先采用（ ）。",[358,360,362,364],{"key":19,"text":359,"correct":31},"普通硅酸盐水泥",{"key":23,"text":361,"correct":21},"矿渣硅酸盐水泥",{"key":26,"text":363,"correct":21},"火山灰质硅酸盐水泥",{"key":29,"text":365,"correct":21},"粉煤灰质硅酸盐水泥",{"id":367,"libraryId":5,"type":9,"typeLabel":15,"stem":368,"options":369,"answer":23,"analysis":32},1124493,"（ ）是指设计洪水位、计算通航水位或桥下线路路面至桥跨结构最下缘之间的距离。",[370,371,372,374],{"key":19,"text":303,"correct":21},{"key":23,"text":301,"correct":31},{"key":26,"text":373,"correct":21},"矢跨比",{"key":29,"text":375,"correct":21},"桥墩高度",{"id":377,"libraryId":5,"type":9,"typeLabel":15,"stem":378,"options":379,"answer":19,"analysis":32},1124494,"精轧螺纹钢筋在表面质量逐根进行外观检查合格后，在每批中（ ）钢筋截取试件进行拉伸试验。",[380,382,384,386],{"key":19,"text":381,"correct":31},"任选2根",{"key":23,"text":383,"correct":21},"任选4根",{"key":26,"text":385,"correct":21},"任选5根",{"key":29,"text":387,"correct":21},"任选6根",{"id":389,"libraryId":5,"type":9,"typeLabel":15,"stem":390,"options":391,"answer":19,"analysis":32},1124495,"提出施工配合比的依据是（ ）。",[392,394,396,398],{"key":19,"text":393,"correct":31},"实测砂石含水率",{"key":23,"text":395,"correct":21},"配制强度和设计强度之间关系",{"key":26,"text":397,"correct":21},"施工条件差异和变化及材料质量的可能波动",{"key":29,"text":399,"correct":21},"强度验证原理和密度修正方法",{"id":401,"libraryId":5,"type":9,"typeLabel":15,"stem":402,"options":403,"answer":23,"analysis":32},1124496,"下列关于钢筋现场绑扎的规定，描述错误的是（ ）。",[404,406,408,410],{"key":19,"text":405,"correct":21},"双向受力的钢筋网，钢筋交叉点必须全部扎牢",{"key":23,"text":407,"correct":31},"箍筋弯钩叠合处，应位于梁和柱角的受力钢筋处，不宜错开设置",{"key":26,"text":409,"correct":21},"圆形柱所有竖向钢筋弯钩平面应朝向圆心",{"key":29,"text":411,"correct":21},"螺旋形箍筋的起点和终点均应绑扎在纵向钢筋上",{"id":413,"libraryId":5,"type":9,"typeLabel":15,"stem":414,"options":415,"answer":19,"analysis":32},1124497,"在安设多层支架、拱架过程中，施工要求不包括（ ）。",[416,418,420,422],{"key":19,"text":417,"correct":31},"随安装随架设永久支撑",{"key":23,"text":419,"correct":21},"支架的横垫板应水平",{"key":26,"text":421,"correct":21},"立柱应铅直",{"key":29,"text":423,"correct":21},"上下层立柱应在同一中心线上",{"id":425,"libraryId":5,"type":9,"typeLabel":15,"stem":426,"options":427,"answer":19,"analysis":32},1124498,"预应力材料必须保持清洁，在存放和搬运过程中应避免机械损伤和有害的锈蚀。如进场后需长时间存放时，必须安排定期的（ ）。",[428,430,432,434],{"key":19,"text":429,"correct":31},"外观检查",{"key":23,"text":431,"correct":21},"硬度检验",{"key":26,"text":433,"correct":21},"静载锚固性能试验",{"key":29,"text":435,"correct":21},"动载锚固性能试验",{"id":437,"libraryId":5,"type":9,"typeLabel":15,"stem":438,"options":439,"answer":23,"analysis":32},1124499,"在后张法预应力筋曲线孔道的最低部位宜留（ ）。",[440,442,444,446],{"key":19,"text":441,"correct":21},"压浆孔",{"key":23,"text":443,"correct":31},"排水孔",{"key":26,"text":445,"correct":21},"溢浆孔",{"key":29,"text":447,"correct":21},"排气孔",{"id":449,"libraryId":5,"type":9,"typeLabel":15,"stem":450,"options":451,"answer":26,"analysis":32},1124500,"下列关于锚具的说法中，错误的是（ ）。",[452,454,456,458],{"key":19,"text":453,"correct":21},"锚具应满足分级张拉、补张拉和放松预应力的要求",{"key":23,"text":455,"correct":21},"用于先张法的连接器，必须符合夹具的性能要求",{"key":26,"text":457,"correct":31},"适用于高强度预应力筋的锚具，不能用于较低强度的预应力筋",{"key":29,"text":459,"correct":21},"用于后张法的连接器，必须符合锚具的性能要求",{"id":461,"libraryId":5,"type":9,"typeLabel":15,"stem":462,"options":463,"answer":26,"analysis":32},1124501,"关于预应力混凝土配制的说法错误的是（ ）。",[464,466,468,470],{"key":19,"text":465,"correct":21},"预应力混凝土应优先采用硅酸盐水泥、普通硅酸盐水泥，不宜使用矿渣硅酸盐水泥，不得使用火山灰质硅酸盐水泥及粉煤灰硅酸盐水泥",{"key":23,"text":467,"correct":21},"粗骨料应采用碎石，其粒径宜为5-25mm",{"key":26,"text":469,"correct":31},"混凝土中的水泥用量宜大于550kg\u002Fm2",{"key":29,"text":471,"correct":21},"从各种材料引入混凝土中的氯离子总含量（折合氯化物含量）不宜超过水泥用量的0.06%",{"id":473,"libraryId":5,"type":9,"typeLabel":15,"stem":474,"options":475,"answer":19,"analysis":32},1124502,"（ ）是连接桥梁上部结构和下部结构的重要结构部件，是桥梁的重要传力装置。",[476,478,480,482],{"key":19,"text":477,"correct":31},"支座",{"key":23,"text":479,"correct":21},"垫石",{"key":26,"text":481,"correct":21},"伸缩装置",{"key":29,"text":483,"correct":21},"盖梁",{"id":485,"libraryId":5,"type":9,"typeLabel":15,"stem":486,"options":487,"answer":19,"analysis":32},1124503,"处在海水、海风、氯离子环境的路面桥面钢筋混凝土，宜添加的外加剂是（ ）。",[488,490,492,494],{"key":19,"text":489,"correct":31},"阻锈剂",{"key":23,"text":491,"correct":21},"早强剂",{"key":26,"text":493,"correct":21},"膨胀剂",{"key":29,"text":495,"correct":21},"减水剂",{"id":497,"libraryId":5,"type":9,"typeLabel":15,"stem":498,"options":499,"answer":26,"analysis":32},1124505,"围堰使用期间河流的常水位为+2.0m，可能出现的最高水位（包括浪高）为+3.0m，则该围堰顶的最低标高应为（ ）。",[500,502,504,506],{"key":19,"text":501,"correct":21},"+2.5m",{"key":23,"text":503,"correct":21},"+3.0m",{"key":26,"text":505,"correct":31},"+3.5m",{"key":29,"text":507,"correct":21},"+4.0m",{"id":509,"libraryId":5,"type":9,"typeLabel":15,"stem":510,"options":511,"answer":23,"analysis":32},1124506,"沉入桩基础施工中桩锤、桩帽或送桩帽应和桩身在同一中心线上，且桩身垂直度偏差不得超过（ ）。",[512,514,516,518],{"key":19,"text":513,"correct":21},"0.2%",{"key":23,"text":515,"correct":31},"0.5%",{"key":26,"text":517,"correct":21},"0.8%",{"key":29,"text":519,"correct":21},"0.1%",{"id":521,"libraryId":5,"type":9,"typeLabel":15,"stem":522,"options":523,"answer":23,"analysis":32},1124507,"场地为浅水时宜采用筑岛法施工，岛的高度应高出的水位（ ）m。",[524,526,528,530],{"key":19,"text":525,"correct":21},"0—0.5",{"key":23,"text":527,"correct":31},"0.5—l",{"key":26,"text":529,"correct":21},"1—1.5",{"key":29,"text":531,"correct":21},"1.5—2",{"id":533,"libraryId":5,"type":9,"typeLabel":15,"stem":534,"options":535,"answer":29,"analysis":32},1124508,"钻孔灌注桩灌注水下混凝土过程中，导管埋入混凝土深度宜为（ ）。",[536,538,540,542],{"key":19,"text":537,"correct":21},"1～3m",{"key":23,"text":539,"correct":21},"2～4m",{"key":26,"text":541,"correct":21},"3～5m",{"key":29,"text":543,"correct":31},"2～6m",{"id":545,"libraryId":5,"type":9,"typeLabel":15,"stem":546,"options":547,"answer":19,"analysis":32},1124509,"在基坑无水情况下浇筑钢筋混凝土承台，如果设计没有要求，基底应浇筑（ ）cm厚混凝土垫层。",[548,549,550,552],{"key":19,"text":101,"correct":31},{"key":23,"text":157,"correct":21},{"key":26,"text":551,"correct":21},"30",{"key":29,"text":159,"correct":21},{"id":554,"libraryId":5,"type":9,"typeLabel":15,"stem":555,"options":556,"answer":26,"analysis":32},1124510,"正、反循环钻孔施工，钻孔达到设计深度，灌注混凝土之前，摩擦型桩的沉渣厚度不应大于（ ）mm。",[557,559,561,563],{"key":19,"text":558,"correct":21},"100",{"key":23,"text":560,"correct":21},"200",{"key":26,"text":562,"correct":31},"300",{"key":29,"text":564,"correct":21},"500",{"id":566,"libraryId":5,"type":9,"typeLabel":15,"stem":567,"options":568,"answer":26,"analysis":32},1124511,"采用土袋围堰施工，堰顶的宽度可为1-2m。当采用机械挖掘时，应视机械的种类确定，但不宜小于（ ）m。",[569,571,572,574],{"key":19,"text":570,"correct":21},"2.0",{"key":23,"text":96,"correct":21},{"key":26,"text":573,"correct":31},"3.0",{"key":29,"text":575,"correct":21},"3.5",{"id":577,"libraryId":5,"type":9,"typeLabel":15,"stem":578,"options":579,"answer":19,"analysis":32},1124512,"下列成桩方式中，适用于地下水位以上的黏性土、黄土碎石土及风化岩的是（ ）。",[580,582,584,586],{"key":19,"text":581,"correct":31},"爆破成孔",{"key":23,"text":583,"correct":21},"沉管成孔灌注桩",{"key":26,"text":585,"correct":21},"干作业成孔桩",{"key":29,"text":587,"correct":21},"泥浆护壁成孔桩",{"id":589,"libraryId":5,"type":9,"typeLabel":15,"stem":590,"options":591,"answer":26,"analysis":32},1124513,"钻孔灌注桩基础成孔方式有泥浆护壁成孔、干作业成孔、护筒（沉管）灌注桩及爆破成孔。下列施工设备中，适用于淤泥、淤泥质土的是（ ）。",[592,594,596,598],{"key":19,"text":593,"correct":21},"冲抓钻",{"key":23,"text":595,"correct":21},"冲击钻",{"key":26,"text":597,"correct":31},"潜水钻",{"key":29,"text":599,"correct":21},"旋挖钻",{"id":601,"libraryId":5,"type":9,"typeLabel":15,"stem":602,"options":603,"answer":26,"analysis":32},1124514,"下列关于沉入桩施工的说法中，错误的是（ ）。",[604,606,608,610],{"key":19,"text":605,"correct":21},"在砂土地基沉桩困难时，可采用射水辅助沉桩",{"key":23,"text":607,"correct":21},"当桩数较多时，沉桩顺序宜由中间向两端或向四周施工",{"key":26,"text":609,"correct":31},"在斜坡地带沉桩时，应先沉坡脚，后沉坡顶的桩",{"key":29,"text":611,"correct":21},"当桩埋置有深浅之别时，宜先沉深的，后沉浅的桩",[613,616,619,622,625,628],{"id":9,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":9},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]