[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127469":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127469,792,2,"多选题","关于施工成本目标控制的原则，正确的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","成本最低原则",true,{"key":16,"text":17,"correct":18},"B","实用性原则",false,{"key":20,"text":21,"correct":14},"C","全员成本原则",{"key":23,"text":24,"correct":18},"D","开拓性原则",{"key":26,"text":27,"correct":14},"E","目标分解原则","ACE","2020版教材P220 市政公用工程项目施工管理中的施工成本目标控制的措施。施工成本目标控制的原则有成本最低原则、全员成本原则、目标分解原则、动态控制原则、责权利相结合的原则。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]