[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127407":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127407,792,2,"多选题","下列水池气密性试验的要求，符合规范的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","需进行满水试验和气密性试验的池体，应在气密性试验合格后，再进行满水试验",false,{"key":16,"text":17,"correct":18},"B","工艺测温孔加堵封闭、池顶盖板封闭",true,{"key":20,"text":21,"correct":18},"C","测温仪、测压仪及充气截门等均已安装完成。",{"key":23,"text":24,"correct":14},"D","试验压力宜为池体工作压力的1.25倍",{"key":26,"text":27,"correct":18},"E","24h的气压降不超过试验压力的20%","BCE","2020版教材P338 水池气密性试验的要求中，A选项是错误的，正确应为需进行满水试验和气密性试验的池体，应在满水试验合格后，再进行气密性试验。D选项是错误的，正确应为试验压力宜为池体工作压力的1.5倍。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]