[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127389":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127389,792,2,"多选题","建设工程管理文件有效的必要条件是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","符合资格要求的注册建造师担任建设工程施工项目负责人",true,{"key":16,"text":17,"correct":18},"B","有相应项目经理资质的管理人员担任建设工程施工项目负责人",false,{"key":20,"text":21,"correct":14},"C","施工项目负责人栏内注册建造师签章完整",{"key":23,"text":24,"correct":18},"D","施工项目负责人栏内项目经理签章完整",{"key":26,"text":27,"correct":18},"E","施工单位栏内盖上级单位公章","AC","2020版教材P346 (1)担任建设工程施工项目负责人的注册建造师对其签署的工程管理文件承担相应责任。注册建造师签章完整的工程施工管理文件方为有效。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]