[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127312":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127312,792,2,"多选题","沥青混凝土摊铺完成后进行碾压，包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","初压",true,{"key":16,"text":17,"correct":14},"B","复压",{"key":19,"text":20,"correct":14},"C","终压",{"key":22,"text":23,"correct":24},"D","重压",false,{"key":26,"text":27,"correct":24},"E","轻压","ABC","2021\u002F2020版教材P20 沥青路面压实成型，施工应配备足够数量、状态完好的压路机，选择合理的压路机组合方式，根据摊铺完成的沥青混合料温度情况严格控制初压、复压、终压（包括成型）时机。压实层最大厚度不宜大于100mm，各层应符合压实度及平整度的要求。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]