[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127282":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127282,792,2,"多选题","符合土质路基压实原则的选项有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","先轻后重",true,{"key":16,"text":17,"correct":18},"B","先高后低",false,{"key":20,"text":21,"correct":14},"C","先静后振",{"key":23,"text":24,"correct":18},"D","先快后慢",{"key":26,"text":27,"correct":14},"E","轨迹重叠","ACE","2021\u002F2020版教材P12页 (2)土质路基压实原则：“先轻后重、先静后振、先低后高、先慢后快，轮迹重叠。”",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]