[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127265":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127265,792,2,"多选题","关于HDPE膜铺设的说法，正确的有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","按照斜坡上不出现横缝的原则确定铺膜方案",true,{"key":16,"text":17,"correct":14},"B","根据焊接能力合理安排每天铺设HDPE膜的数量",{"key":19,"text":20,"correct":21},"C","铺设时允许出现部分褶皱",false,{"key":23,"text":24,"correct":14},"D","在有大风的情况下，安装工作应停止进行",{"key":26,"text":27,"correct":21},"E","及时填写施工记录表，经技术负责人签字后存档","ABD","P175-183 C选项错误，正确说法为：HDPE膜铺设方式应保证不会引起HDPE膜的折叠或褶皱。HDPE膜的拱起会造成HDPE膜的严重拉长，为了避免出现褶皱，可通过对HDPE膜的重新铺设或通过切割和修理来解决褶皱问题。 E选项错误，正确说法为：应及时填写HDPE膜铺设施工记录表,经现场监理和技术负责人签字后存档。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]