[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127239":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127239,792,2,"多选题","热力管道工程施工结束后，应进行（ ）及试运行。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","清洗",true,{"key":16,"text":17,"correct":14},"B","试验",{"key":19,"text":20,"correct":21},"C","吹扫管道",false,{"key":23,"text":24,"correct":21},"D","保温",{"key":26,"text":27,"correct":21},"E","刷漆","AB","P159-161 供热管网的清洗应在试运行前进行，热力管道完工后要进行强度和严密性试验。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]