[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127186":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127186,792,2,"多选题","热力管道穿过构筑物墙板处应按设计要求安装套管，套管的安装要求是( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","穿过结构的套管长度每侧应大于墙厚20㎜",true,{"key":16,"text":17,"correct":14},"B","穿过楼板的套管应高出板面50㎜",{"key":19,"text":20,"correct":14},"C","套管与管道之间的空隙可采用柔性材料堵塞",{"key":22,"text":23,"correct":24},"D","防水套管应按设计要求制作，并应在墙体和构筑物砌筑或浇筑混凝土之后安装就位",false,{"key":26,"text":27,"correct":14},"E","套管中心的允许偏差为0～10㎜","ABCE","2021\u002F2020版教材P147 套管安装要求.1)管道穿越建（构）筑物的墙板处应按设计要求安装套管，穿过结构的套管长度每侧应大于墙厚20mm;穿过楼板的套管应高出板面50mm。2)套管与管道之间的空隙应采用柔性材料填充。3)防水套管应按设计要求制作，并应在建（构）筑物砌筑或浇筑混凝土之前安装就位，套管缝隙应按设计要求进行填充。4)套管中心的允许偏差为0-10mm。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]