[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127166":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127166,792,2,"多选题","关于给水排水压力管道水压试验的准备工作，正确的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","管道未回填土且沟槽内无积水",false,{"key":16,"text":17,"correct":18},"B","应做好水源引接、排水等疏导方案",true,{"key":20,"text":21,"correct":18},"C","试验前应清除管道内的杂物",{"key":23,"text":24,"correct":18},"D","试验管段所有敞口应封闭，不得有渗漏水现象",{"key":26,"text":27,"correct":18},"E","试验管段不得用闸阀做堵板，不得含有消火栓、水锤消除器、安全阀等附件","BCDE","2021\u002F2020版教材P140 (二)压力管道试验准备工作(1)试验管段所有敞口应封闭，不得有渗漏水现象。(2)试验管段不得用闸阀作堵板，不得含有消火栓、水锤消除器、安全阀等附件。(3)水压试验前应清除管道内的杂物。(4)应做好水源引接、排水等疏导方案。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]