[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127152":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127152,792,2,"多选题","关于沉井干封底的要求，正确的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","在沉井封底前应用大石块将刃脚下垫实",true,{"key":16,"text":17,"correct":18},"B","封底前应整理好坑底和清除浮泥，对超挖部分应回填石灰土至规定标高",false,{"key":20,"text":21,"correct":14},"C","钢筋混凝土底板施工前，井内应无渗漏水",{"key":23,"text":24,"correct":14},"D","封底前应设置泄水井",{"key":26,"text":27,"correct":14},"E","底板混凝土强度达到设计强度等级且满足抗浮要求时，方可封填泄水井、停止降水","ACDE","P127-130 沉井干封底： (1)在井点降水条件下施工的沉井应继续降水，并稳定保持地下水位距坑底不小于0.5m；在沉井封底前应用大石块将刃脚下垫实。 (2)封底前应整理好坑底和清除浮泥，对超挖部分应回填砂石至规定高程。 (3)采用全断面封底时，混凝土垫层应一次性连续浇筑；因有底梁或支撑梁而分格封底时，应对称逐格浇筑。 (4)钢筋混凝土底板施工前，沉井内应无渗漏水，且新、老混凝土接触部位应凿毛处理，并清理干净。 (5)封底前应设置泄水井，底板混凝土强度达到设计强度等级且满足抗浮要求时，方可封填泄水井、停止降水。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]