[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127133":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127133,792,2,"多选题","关于现浇预应力钢筋混凝土水池的无粘结预应力筋布置安装要求，正确的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","锚固肋数量和布置，应符合设计要求",true,{"key":16,"text":17,"correct":18},"B","设计无要求时，锚固肋数量宜为单数",false,{"key":20,"text":21,"correct":18},"C","设计无要求时，应保证张拉段无粘结预应力筋长不超过60m",{"key":23,"text":24,"correct":18},"D","无粘结预应力筋中不宜有接头",{"key":26,"text":27,"correct":14},"E","无粘结预应力筋不应有死弯，有死弯时必须切断","AE","2021\u002F2020版教材P125 2.无粘结预应力筋布置安装：(1)锚固肋数量和布置，应符合设计要求；设计无要求肘，应保证张拉段无粘结预应力筋长不超过50m且锚固肋数量为双数。(4)无粘结预应力筋不应有死弯，有死弯时必须切断。(5)无粘结预应力筋中严禁有接头",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]