[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127092":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127092,792,2,"多选题","根据国内外经验，采用管棚超前支护的场合有（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","穿越地下和地面结构物修建地下工程",true,{"key":16,"text":17,"correct":14},"B","修建大断面地下工程",{"key":19,"text":20,"correct":14},"C","通过断层破碎带等特殊地层",{"key":22,"text":23,"correct":14},"D","特殊地段，如大跨度地铁车站、重要文物保护区、河底、海底的地下工程施工",{"key":25,"text":26,"correct":27},"E","通过硬岩区段",false,"ABCD","P115-116 通常,在下列施工场合应考虑采用管棚进行超前支护： (1)穿越铁路修建地下工程。 (2)穿越地下和地面结构物修建地下工程。 (3)修建大断面地下工程。 (4)隧道洞口段施工。 (5)通过断层破碎带等特殊地层。 (6)特殊地段，如大跨度地铁车站、重要文物保护区、河底、海底的地下工程施工等。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]