[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127086":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127086,792,2,"多选题","关于喷锚暗挖法施工隧道防水结构设计与施工的说法，正确的有( ) 。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","复合式衬砌以结构自防水为根本，辅以防水层组成防水体系",true,{"key":16,"text":17,"correct":14},"B","以接缝部位混凝土及防水层施工为防水控制的重点",{"key":19,"text":20,"correct":14},"C","衬砌背后、隧底设置的排水盲管(沟)应有足够的数量和过水能力断面",{"key":22,"text":23,"correct":24},"D","衬砌背后、隧底设置的排水盲管(沟)应与衬砌分别施工以防被堵塞",false,{"key":26,"text":27,"correct":14},"E","二次衬砌采用的补偿收缩混凝土，应具有良好的抗裂性能","ABCE","P112-114 选项D错误，正确说法是：在衬砌背后设置排水盲管(沟)或暗沟和在隧底设置中心排水盲沟时，应根据隧道的渗漏水情况，配合衬砌一次施工。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]