[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1127053":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1127053,792,2,"多选题","隧道掘进中超前支护常用方法及特殊情况下采用的方法有( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","注浆加固法",true,{"key":16,"text":17,"correct":14},"B","管棚法",{"key":19,"text":20,"correct":14},"C","超前小导管支护",{"key":22,"text":23,"correct":24},"D","插板",false,{"key":26,"text":27,"correct":14},"E","冻结法","ABCE","2021\u002F2020版教材P109 (二)支护与加固技术措施1.暗挖隧道内常用的技术措施(1)超前锚杆或超前小导管支护。(2)小导管周边注浆或围岩深孔注浆。(3)设置临时仰拱。(4)管棚超前支护。2.暗挖燧道外常用的技术措施(1)地表锚杆或地表注浆加固。(2)冻结法固结地层。(3)降低地下水位法。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]