[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126995":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126995,792,2,"多选题","浅埋暗挖法施工的十八字方针是管超前、严注浆( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","短开挖",true,{"key":16,"text":17,"correct":18},"B","少扰动",false,{"key":20,"text":21,"correct":14},"C","强支护",{"key":23,"text":24,"correct":14},"D","快封闭",{"key":26,"text":27,"correct":14},"E","勤量测","ACDE","2021\u002F2020版教材P74页 浅埋暗挖法的十八字方针是管超前、严注浆、短开挖、强支护、快封闭和勤测量。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]