[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126970":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126970,792,2,"多选题","先张法预应力筋张拉的一般操作过程为：调整预应力筋长度（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","初始张拉",true,{"key":16,"text":17,"correct":14},"B","正式张拉",{"key":19,"text":20,"correct":14},"C","持荷",{"key":22,"text":23,"correct":24},"D","铺放预应力筋",false,{"key":26,"text":27,"correct":14},"E","锚固","ABCE","P41-47",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]