[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126929":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126929,792,2,"多选题","对地质复杂的大桥、特大桥，沉入桩施工前应进行试桩，其目的是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","检验桩的承载能力",true,{"key":16,"text":17,"correct":18},"B","确定贯入度",false,{"key":20,"text":21,"correct":14},"C","确定沉桩工艺",{"key":23,"text":24,"correct":18},"D","确定桩端标高",{"key":26,"text":27,"correct":18},"E","确定桩身强度","AC","2021\u002F2020版教材P56页 对地质复杂的大桥、特大桥、为检验桩的承载能力和确定沉桩工艺应进行试桩。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]