[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126914":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126914,792,2,"多选题","下列后张法预应力张拉施工规定中，正确的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设计未要求，张拉时混凝土构件的强度不得低于设计值的70%",false,{"key":16,"text":17,"correct":18},"B","张拉前应根据设计要求对孔道的摩阻损失进行实测",true,{"key":20,"text":21,"correct":18},"C","长度小于25m的直线预应力筋，可在一端张拉",{"key":23,"text":24,"correct":18},"D","当设计无要求时，预应力筋的张拉顺序宜先中间，后上、下或两侧",{"key":26,"text":27,"correct":18},"E","张拉控制应力达到稳定后方可锚固","BCDE","2021\u002F2020版教材P46页 3.后张法预应力筋张拉应符合：1)混凝土强度应符合设计要求，设计未规定，不得低于强度设计值的75%2)当设计未要求时，应符合下列规定：曲线预应力筋或长度大于等于25m的直线预应力筋，宜在两端张拉。长度小于25m的直线预应力筋，可在一端张拉。3)张拉前应根据设计要求对孔道的摩阻损失进行实测4)预应力筋的张拉顺序应符合设计要求，设计未要求时，可采取分批、分阶段对称、张拉（宜先中间，后上、下或两侧）4.张拉控制应力达到稳定后方可锚固",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]