[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126837":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126837,792,2,"多选题","下列选项中，属于施工质量因素控制的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工人员控制",true,{"key":16,"text":17,"correct":14},"B","材料质量控制",{"key":19,"text":20,"correct":21},"C","质量通病控制",false,{"key":23,"text":24,"correct":14},"D","机械设备质量控制",{"key":26,"text":27,"correct":21},"E","不合格产品控制","ABD","施工质量因素控制： （1）施工人员控制；（2）材料的质量控制；（3）机械设备的质量控制",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]