[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126827":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126827,792,2,"多选题","下列分部分项工程中，属于危险性较大的分部分项工程有（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","桥台大体积混凝土浇筑",false,{"key":16,"text":17,"correct":18},"B","开挖深度4m的基坑",true,{"key":20,"text":21,"correct":18},"C","高度6m的承重模板支架",{"key":23,"text":24,"correct":18},"D","在高度24m的平台上安装钢筋",{"key":26,"text":27,"correct":18},"E","T梁预应力筋张拉","BCDE","本题考查的是危险性较大的分部分项工程。危险性较大的分部分项工程：开挖深度超过3m（含3m）的基坑；超过5m（超过5m）的模板工程；高空平台；预应力筋张拉。P262",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]