[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126783":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126783,792,2,"多选题","下列关于高程控制网的测设说法，正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","水准点可利用场地附近水准点，间距宜在150m左右",false,{"key":16,"text":17,"correct":18},"B","Ⅳ等水准观测顺序“后→后→前→前”",true,{"key":20,"text":21,"correct":18},"C","高程测量的精度不宜低于三等水准的精度",{"key":23,"text":24,"correct":14},"D","高程控制点有效期不宜超过一年",{"key":26,"text":27,"correct":18},"E","高程控制网可按需要进行加密","BCE","高程控制水准点，可单独埋设在平面控制网标桩上，也可利用场地附近水准点，间距宜在200m左右，A错误；高程控制点有效期不宜超过半年，D错误。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]