[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126779":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126779,792,2,"多选题","三级基坑应监测项目有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","边坡顶部竖向位移",true,{"key":16,"text":17,"correct":14},"B","地下水位",{"key":19,"text":20,"correct":14},"C","地表沉降",{"key":22,"text":23,"correct":24},"D","支护桩（墙）体水平位移",false,{"key":26,"text":27,"correct":24},"E","坑底隆起","ABC","本题考查的是监控量测方法。三级基坑监测项目有：支护桩（墙）、边坡顶部水平位移，支护桩（墙）、边坡顶部竖向位移，支撑轴力，锚杆拉力，地表沉降，竖井井壁支护结构净空收敛，地下水位。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]