[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126760":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126760,792,2,"多选题","水泥稳定土、石灰土、工业废渣稳定土基层施工技术中具有相同要求的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","宜在气温较高季节组织施工，如春末或夏季",true,{"key":16,"text":17,"correct":14},"B","碾压时采用先轻型后重型压路机组合",{"key":19,"text":20,"correct":21},"C","厚度小于等于20cm时，用18～20t三轮压路机和振动压路机碾压",false,{"key":23,"text":24,"correct":21},"D","必须保湿养护，养护期严禁车辆通行",{"key":26,"text":27,"correct":14},"E","加水拌合及摊铺必须均匀","ABE","三种基层施工时都要满足碾压时，采用先轻型、后重型压路机碾压。应在春末和夏季组织施工，施工期的日最低气温应在5℃以上。加水拌合及摊铺必须均匀。CD选项说法不正确，答案选ABE。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]