[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126746":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126746,792,2,"多选题","热拌沥青混合料摊铺，上面层的摊铺应采用（ ）控制方式。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","钢丝绳引导",false,{"key":16,"text":17,"correct":18},"B","滑靴",true,{"key":20,"text":21,"correct":18},"C","平衡梁",{"key":23,"text":24,"correct":14},"D","碾压遍数",{"key":26,"text":27,"correct":14},"E","自动找平","BC","本题考查的是沥青混合料面层施工准备和摊铺作业。摊铺机应采用自动找平方式，下面层宜采用钢丝绳引导的高程控制方式，上面层宜采用平衡梁或滑靴并辅以厚度控制方式摊铺。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]