[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126712":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126712,792,2,"多选题","关于城镇供热管网试验说法正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","强度试验的试验压力为1.25倍设计压力，且不得低于0.6MPa",false,{"key":16,"text":17,"correct":14},"B","严密性试验的试验压力为1.15倍设计压力，且不得低于0.6MPa",{"key":19,"text":20,"correct":21},"C","强度试验其目的是试验管道本身与安装时焊口的强度",true,{"key":23,"text":24,"correct":21},"D","严密性试验是在各管段强度试验合格且应该是管道安装内容全部完成后进行",{"key":26,"text":27,"correct":21},"E","严密性试验是在零件、法兰等以及施焊工序全部完成后进行","CDE","强度试验的试验压力为1.5倍设计压力，且不得低于0.6MPa，其目的是试验管道本身与安装时焊口的强度；严密性试验的试验压力为1.25倍设计压力，且不得低于0.6MPa，它是在各管段强度试验合格的基础上进行的，且应该是管道安装内容全部完成，如零件、法兰等以及施焊工序全部完成。这种试验是对管道的一次全面检验。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]