[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126670":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126670,792,2,"多选题","沉井施工中下沉施工控制要点有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","下沉应平稳.均衡.缓慢，发生偏斜应 “随挖随纠.动中纠偏”",true,{"key":16,"text":17,"correct":18},"B","开挖顺序和方式没有严格要求",false,{"key":20,"text":21,"correct":14},"C","应按施工方案规定的顺序和方式开挖",{"key":23,"text":24,"correct":14},"D","做好沉井下沉监控测量",{"key":26,"text":27,"correct":14},"E","沉井下沉影响范围内的地面四周不得堆放任何东西，车辆来往要减少震动","ACDE","本题考查的是沉井的下沉施工。选项B的正确说法“应按施工方案规定的开挖顺序和方式开挖”。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]