[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126617":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126617,792,2,"多选题","基坑施工的地下水控制应根据（ ）选用排水、降水、隔水或回灌等工程措施。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","降水机械设备",false,{"key":16,"text":17,"correct":18},"B","工程地质条件",true,{"key":20,"text":21,"correct":18},"C","水文地质条件",{"key":23,"text":24,"correct":18},"D","基坑周边环境要求",{"key":26,"text":27,"correct":18},"E","支护结构形式","BCDE","基坑施工的地下水控制应根据工程地质和水文地质条件、基坑周边环境要求及支护结构形式选用排水、降水、隔水或回灌等工程措施。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]