[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126611":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126611,792,2,"多选题","开挖深度25m的基坑监控量测应测项目包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","地下水位",true,{"key":16,"text":17,"correct":18},"B","土钉拉力",false,{"key":20,"text":21,"correct":14},"C","地表沉降",{"key":23,"text":24,"correct":14},"D","立柱结构竖向位移",{"key":26,"text":27,"correct":18},"E","土体深层水平位移","ACD","开挖深度 25m为一级基坑，一级基坑监控量测项目包括：支护桩（墙）、边坡顶部水平位移、支护桩（墙）、边坡顶部竖向位移、支护桩（墙）体水平位移、立柱结构竖向位移、立柱结构水平位移、支撑轴力、锚杆拉力、地表沉降、竖井井壁支护结构净空收敛、地下水位。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]