[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126600":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126600,792,2,"多选题","箱涵顶进施工作业安全措施包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","施工现场及路基附近不得积水浸泡",true,{"key":16,"text":17,"correct":14},"B","在列车运行间隙或避开交通高峰期开挖和顶进",{"key":19,"text":20,"correct":14},"C","列车通过时，严禁挖土作业，人员应撤离开挖面",{"key":22,"text":23,"correct":24},"D","箱涵顶进过程中，顶铁、顶柱布置区内必须设专人统一指挥",false,{"key":26,"text":27,"correct":24},"E","当液压系统发生故障时，应及时在工作状态下检查和调整","ABC","箱涵顶进施工作业安全措施：（1）施工现场（工作坑、顶进作业区）及路基附近不得积水浸泡。（2）应按规定设立施工现场围挡，有明显的警示标志，隔离施工现场和社会活动区，实行封闭管理，严禁非施工人员人内。（3）在列车运行间隙或避开交通高峰期开挖和顶进；列车通过时，严禁挖土作业，人员应撤离开挖面。（4）箱涵顶进过程中，任何人不得在顶铁、顶柱布置区内停留。D错。（5）箱涵顶进过程中，当液压系统发生故障时，严禁在工作状态下检查和调整。E错。（6）现场施工必须设专人统一指挥和调度。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]