[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126597":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126597,792,2,"多选题","支架法现浇预应力混凝土连续梁时做法正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","支架的地基承载力应符合要求",true,{"key":16,"text":17,"correct":14},"B","应有简便可行的落架拆模措施",{"key":19,"text":20,"correct":21},"C","各种支架和模板安装后，宜采取预压方法消除拼装间隙和地基沉降等弹性变形",false,{"key":23,"text":24,"correct":21},"D","安装支架时，如跨度小于8米可不设置预拱度",{"key":26,"text":27,"correct":14},"E","支架底部应有良好的排水措施","ABE","支架法现浇预应力混凝土连续梁：（1）支架的地基承载力应符合要求，必要时，应采取加固处理或其他措施。（2）应有简便可行的落架拆模措施。（3）各种支架和模板安装后，宜采取预压方法消除拼装间隙和地基沉降等非弹性变形。（4）安装支架时，应根据梁体和支架的弹性、非弹性变形，设置预拱度。（5）支架底部应有良好的排水措施，不得被水浸泡。（6）浇筑混凝土时应采取防止支架不均匀下沉的措施。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]