[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126585":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126585,792,2,"多选题","关于沉入桩施工技术要点，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","沉桩时，桩锤、桩帽或送桩帽应和桩身在同一中心线上",true,{"key":16,"text":17,"correct":18},"B","桩身垂直度偏差不得超过1%",false,{"key":20,"text":21,"correct":14},"C","接桩可采用焊接、法兰连接或机械连接",{"key":23,"text":24,"correct":18},"D","终止锤击应以控制贯入度为主，桩端设计标高为辅",{"key":26,"text":27,"correct":14},"E","沉桩过程中应加强对邻近建筑物、地下管线等的观测、监护","ACE","沉入桩施工技术要点：（1）预制桩的接桩可采用焊接、法兰连接或机械连接，选项C正确。（2）桩锤、桩帽或送桩帽应和桩身在同一中心线上；选项A正确。（3）桩身垂直度偏差不得超过0.5%。选项B错。（4）终止锤击的控制应以控制桩端设计高程为主，贯入度为辅。选项D错误。（5）沉桩过程中应加强邻近建筑物、地下管线等的观测、监护。选项E正确。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]