[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126581":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126581,792,2,"多选题","模板支架系统设置预拱度需要考虑的因素（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","支架基础受载后的沉降",true,{"key":16,"text":17,"correct":18},"B","支架系统设计计算的荷载",false,{"key":20,"text":21,"correct":14},"C","设计文件要求的预拱度",{"key":23,"text":24,"correct":14},"D","支架承受荷载后的弹性变形",{"key":26,"text":27,"correct":14},"E","杆件接头处的非弹性变形","ACDE","本题考查的是模板、支架和拱架的设计与验算。模板、支架和拱架的设计中应设施工预拱度。施工预拱度应考虑下列因素：（1）设计文件规定的结构预拱度；（2）支架和拱架承受全部施工荷载引起的弹性变形；（3）受载后由于杆件接头处的挤压和卸落设备压缩而产生的非弹性变形；（4）支架、拱架基础受载后的沉降。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]