[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126564":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1126564,792,2,"多选题","钢绞线进场的检验要求，包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","检验有一项不合格则该批钢绞线报废",false,{"key":16,"text":17,"correct":18},"B","检查质量证明书和包装",true,{"key":20,"text":21,"correct":14},"C","分批检验，每批重量不大于65t",{"key":23,"text":24,"correct":18},"D","每批少于3盘应全数检验",{"key":26,"text":27,"correct":18},"E","每批大于3盘则任取3盘","BDE","本题考查的是预应力筋及管道。选项A的正确说法“检验有一项不合格则该盘钢绞线报废”；选项C的正确说法“钢绞线检验每批重量不得大于60t”。",{"id":6,"name":31,"category":32,"favorite":33},"二建市政工程实务","建筑工程",0]