[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126549":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1126549,792,1,"单选题","现浇预应力混凝土梁支架施工时，设置预拱度要考虑的下述变形值中，不符合规范要求的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","卸架后上部构造本身及全部活载所产生的竖向挠度",true,{"key":16,"text":17,"correct":18},"B","支架在荷载作用下的弹性和非弹性压缩",false,{"key":20,"text":21,"correct":18},"C","支架基底在荷载作用下的非弹性沉降",{"key":23,"text":24,"correct":18},"D","由混凝土收缩及温度变化而引起的挠度","【考点】现浇预应力混凝土梁支架施工时设置预拱度要考虑的变形值。 现浇预应力混凝土梁支架施工时要设置一定数值的预拱度，其值为以下各项变形值之和：卸架后上部构造本身及活载一半所产生的竖向挠度；支架在荷载作用下的弹性压缩；支架在荷载作用下的非弹性压缩；支架基底在荷载作用下的非弹性沉陷；由混凝土收缩及温度变化而引起的挠度。A选项将“活载一半”篡改成“全部活载”，因而是不符合规范的。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]